[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1112666":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1112666,787,1,"单选题","风管系统安装的紧后工序是：（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","通风空调设备安装",false,{"key":16,"text":17,"correct":14},"B","空调设备安装",{"key":19,"text":20,"correct":21},"C","空调水系统安装",true,{"key":23,"text":24,"correct":14},"D","管道防腐与绝热","@##",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]