[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1112661":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1112661,787,1,"单选题","风机安装应符合的规定不包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","安装完毕应检查电机接线正确",true,{"key":16,"text":17,"correct":18},"B","检查叶片转动灵活，无异常响动",false,{"key":20,"text":21,"correct":18},"C","风机落地安装应固定在隔振底座上",{"key":23,"text":24,"correct":18},"D","风机与风管连接采用柔性短管","2020版教材P149 风机安装前应检查电机接线正确，电试验前，叶片转动灵活，方向正确，停转后不应每次停留在同一位置上，机械部分无摩擦，松动，无漏电及异常响声。 风机与风管连接采用柔性短管 水泵减振垫可采用型钢制作或采用钢筋混凝土浇筑。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]