[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1112347":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1112347,787,1,"单选题","关于标高基准点安装的说法，错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","一般埋设在基础边缘便于测量处",false,{"key":16,"text":17,"correct":18},"B","也可埋设在设备底板下面的基础表面",true,{"key":20,"text":21,"correct":14},"C","简单的标高基准点一般用于独立设备安装",{"key":23,"text":24,"correct":14},"D","预埋的标高基准点主要用于连续生产线上的设备安装","2020版教材P23 （2）安装标高基准点的测设：标高基准点一般埋设在基础边缘且便于观测的位置。标高基准点一般有两种：一种是简单的标高基准点；另一种是预埋标高基准点。采用钢制标高基准点，应是靠近设备基础边缘便于测量处，不允许埋设在设备底板下面的基础表面。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]