[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1112184":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1112184,787,1,"单选题","不属于建筑安装工程的主控项目有()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","管道压力试验",false,{"key":16,"text":17,"correct":18},"B","观感质量",true,{"key":20,"text":21,"correct":14},"C","电气的绝缘性能",{"key":23,"text":24,"correct":14},"D","电气接地测试","主控项目和一般项目的检验主控项目是保证工程安全和使用功能的重要检验项目，是对安全、卫生、环境保护和公共利益起决定性作用的检验项目，是确定该检验批主要性能的项目，因此必须全部符合有关专业工程验收规范的规定。一般项目是除主控项目以外的检验项目，可以允许有偏差的项目。例如，管道的压力试验、电气的绝缘与接地测试等均是主控项目。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]