[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1112183":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1112183,787,1,"单选题","所有检验批均应由（ ）或建设单位项目技术负责人组织验收。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工项目部质量员",false,{"key":16,"text":17,"correct":14},"B","企业质量管理部门",{"key":19,"text":20,"correct":14},"C","项目部主管质量副经理",{"key":22,"text":23,"correct":24},"D","监理工程师",true,"本题考查的是建筑安装工程施工质量验收的项目划分和验收程序。检验批和分项工程是建筑工程项目质量的基础，施工单位自检合格后，提交监理工程师或建设单位项目技术负责人组织进行验收。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]