[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1112152":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1112152,787,1,"单选题","用户申请用电时，应向供电企业提供用电工程项目批准的文件及有关的用电资料不包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","电力用途",false,{"key":16,"text":17,"correct":14},"B","用电性质",{"key":19,"text":20,"correct":21},"C","用电路径",true,{"key":23,"text":24,"correct":14},"D","用电规划","本题考查的是建设用电的规定。用户申请新装或增加用电时，应向供电企业提供用电工程项目批准的文件及有关的用电资料。包括用电地点、电力用途、用电性质、用电设备、用电设备清单、用电负荷、保安电力、用电规划等，并依照供电企业规定如实填写用电申请书及办理所需手续。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]