[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1112140":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1112140,787,1,"单选题","项目部编制“计量检测设备配备计划书”的依据不包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工组织设计",false,{"key":16,"text":17,"correct":14},"B","施工方案",{"key":19,"text":20,"correct":21},"C","作业指导书",true,{"key":23,"text":24,"correct":14},"D","质量计划","本题考查的是施工现场计量器具的管理程序。工程开工前，项目部应根据项目质量计划、施工组织设计、施工方案对检测设备的精度要求和生产需要，编制《计量检测设备配备计划书》。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]