[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1112087":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1112087,787,1,"单选题","影响下道工序质量的质量控制点应由（ ）检查确认并签证。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","由施工.监理和业主三方质检人员",false,{"key":16,"text":17,"correct":14},"B","业主和施工双方质检人员",{"key":19,"text":20,"correct":21},"C","施工和监理双方质检人员",true,{"key":23,"text":24,"correct":14},"D","由施工方质检人员自行","本题考查的是施工质量预控。B级控制点：影响下道工序质量的质量控制点，由施工、监理双方质检人员共同检查确认并签证。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]