[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1112076":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1112076,787,1,"单选题","下列选项中，不属于施工技术交底注意事项的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工技术交底前，应准备相关资料",false,{"key":16,"text":17,"correct":14},"B","交底内容要详尽、涵盖整个施工过程",{"key":19,"text":20,"correct":14},"C","交底要有可操作性",{"key":22,"text":23,"correct":24},"D","交底表达方式要复杂、专业",true,"交底表达方式要通俗易懂。将复杂、专业的标准、术语，用相应的、通俗易懂的语言传达给现场的操作人员。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]