[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111884":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1111884,787,1,"单选题","管线工程的测量错误的是（ ）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","定位时可根据地面上已有建筑物进行管线定位，也可根据控制点进行管线定位。",false,{"key":16,"text":17,"correct":14},"B","管线的测量主点包括：起点、终点、转折点",{"key":19,"text":20,"correct":14},"C","地下管线工程测量必须在回填前完成",{"key":22,"text":23,"correct":24},"D","地下管线测量出起、止点，窨井的坐标和管中心线标高。",true,"地下管线工程测量必须在回填前，测量出起、止点，窨井的坐标和管顶标高。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]