[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111872":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1111872,787,1,"单选题","埋设在基础上的沉降观测点，第一次观测应在（ ）进行。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","观测点埋设后",true,{"key":16,"text":17,"correct":18},"B","设备底座就位后",false,{"key":20,"text":21,"correct":18},"C","设备安装完成后",{"key":23,"text":24,"correct":18},"D","设备调整后","本题考查的是工程测量的原理。对于埋设在基础上的基准点，在埋设后就开始第一次观测，随后的观测在设备安装期间连续进行。",{"id":6,"name":27,"category":28,"favorite":29},"二建机电工程实务","建筑工程",0]