[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":595},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,8,50,1644,[13,34,46,57,69,81,93,105,117,129,141,150,162,174,186,197,209,221,233,245,257,269,281,293,305,317,329,340,351,361,373,385,397,409,421,433,445,457,469,481,493,505,515,526,538,549,558,567,575,587],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1110531,1,"单选题","在路堤较高，边坡坡面未做防护而易遭受路面表面水流冲刷，或者坡面虽已采取防护措施但仍有可能受到冲刷时，应沿路肩外侧边缘设置（ ），汇集路面表面水，然后通过泄水口和急流槽排离路堤。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","边沟",false,{"key":24,"text":25,"correct":26},"B","拦水带",true,{"key":28,"text":29,"correct":22},"C","硬路肩",{"key":31,"text":32,"correct":22},"D","暗沟","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1110533,"设置拦水带汇集路面表面水时，拦水带过水断面内的水面，在二级及二级以下公路不得漫过（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"右侧车道外边缘",{"key":24,"text":41,"correct":26},"右侧车道中心线",{"key":28,"text":43,"correct":22},"左侧车道外边缘",{"key":31,"text":45,"correct":22},"公路中心线",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1110534,"路面表面防水排水设施组成不包括（ ）。",[50,52,54,55],{"key":20,"text":51,"correct":22},"路拱横坡",{"key":24,"text":53,"correct":26},"急流槽",{"key":28,"text":25,"correct":22},{"key":31,"text":56,"correct":22},"路肩坡度",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":31,"analysis":33},1110535,"拦水缘石一般采用混凝土预制块，拦水缘石应高出路肩（ ）cm。",[61,63,65,67],{"key":20,"text":62,"correct":22},"6",{"key":24,"text":64,"correct":22},"8",{"key":28,"text":66,"correct":22},"10",{"key":31,"text":68,"correct":26},"12",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":24,"analysis":33},1110536,"当硬路肩汇水量较大时，可在土路肩上设置（ ）形混凝土预制构件砌筑的排水沟。",[73,75,77,79],{"key":20,"text":74,"correct":22},"“O”",{"key":24,"text":76,"correct":26},"“U”",{"key":28,"text":78,"correct":22},"“V”",{"key":31,"text":80,"correct":22},"“Y”",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":31,"analysis":33},1110537,"关于水泥混凝土路面实验检测的说法错误的是（ ）。",[85,87,89,91],{"key":20,"text":86,"correct":22},"混凝土的配合比，应以质量比表示",{"key":24,"text":88,"correct":22},"混凝土强度等级是评定混凝土品质的重要指标",{"key":28,"text":90,"correct":22},"混凝土抗压强度采用非标准试件应进行换算",{"key":31,"text":92,"correct":26},"凝土抗压强度以边长150mm正立方体的标准试件标养护14d测得",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":20,"analysis":33},1110538,"关于水泥混凝土抗折强度实验检测的说法正确的是（ ）。",[97,99,101,103],{"key":20,"text":98,"correct":26},"水泥混凝土抗折强度试件采用的是150mm×150mm×550mm的梁形试件",{"key":24,"text":100,"correct":22},"水泥混凝土抗折强度试件采用的是边长为150mm的正立方体为标准试件",{"key":28,"text":102,"correct":22},"水泥混凝土抗折强度试件都是高:直径=1:1的圆柱体试件",{"key":31,"text":104,"correct":22},"水泥混凝土抗折强度试件采用的是边长为70.7mm的正立方体为标准试件",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":28,"analysis":33},1110539,"水泥混凝土抗压强度试验试的标准试件是边长为（ ） mm的正立方体。",[109,111,113,115],{"key":20,"text":110,"correct":22},"50",{"key":24,"text":112,"correct":22},"100",{"key":28,"text":114,"correct":26},"150",{"key":31,"text":116,"correct":22},"200",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":24,"analysis":33},1110540,"关于沥青路面试验检测的说法错误的是（ ），",[121,123,125,127],{"key":20,"text":122,"correct":22},"沥青混凝土配合比设计采用马歇尔稳定度法",{"key":24,"text":124,"correct":26},"马歇尔稳定度试验不能用于沥青路面施工质量检验",{"key":28,"text":126,"correct":22},"空隙率是评价沥青混合料压实程度的指标",{"key":31,"text":128,"correct":22},"流值是评价沥青混合料抗塑性变形能力的指标",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":28,"analysis":33},1110541,"评价沥青混合料抗塑性变形能力的指标是（ ）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"稳定度",{"key":24,"text":136,"correct":22},"沥青饱和度",{"key":28,"text":138,"correct":26},"流值",{"key":31,"text":140,"correct":22},"空隙率",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":28,"analysis":33},1110542,"评价沥青混合料压实程度的指标是（ ）。",[145,146,147,148],{"key":20,"text":134,"correct":22},{"key":24,"text":136,"correct":22},{"key":28,"text":140,"correct":26},{"key":31,"text":149,"correct":22},"沥青填隙率",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":28,"analysis":33},1110543,"标准马歇尔试件为（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"立方体",{"key":24,"text":157,"correct":22},"长方体",{"key":28,"text":159,"correct":26},"圆柱体",{"key":31,"text":161,"correct":22},"球体",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":28,"analysis":33},1110544,"沥青混凝土配合比设计采用（ ）方法。",[166,168,170,172],{"key":20,"text":167,"correct":22},"目标配合比设计",{"key":24,"text":169,"correct":22},"生产配合比设计",{"key":28,"text":171,"correct":26},"马歇尔稳定度",{"key":31,"text":173,"correct":22},"生产配合比验证",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":28,"analysis":33},1110545,"测定水泥稳定碎石基层无侧限抗压强度的试件采用（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":22},"150mm×150mm×550mm的梁形试件",{"key":24,"text":181,"correct":22},"边长为150mm的正立方体试件",{"key":28,"text":183,"correct":26},"高：直径—1：1的圆柱体试件",{"key":31,"text":185,"correct":22},"边长为70.7mm的正立方体试件",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":28,"analysis":33},1110546,"无侧限抗压强度试验检测的试件为（ ）。",[190,192,193,195],{"key":20,"text":191,"correct":22},"高：直径=1：2的圆柱体",{"key":24,"text":157,"correct":22},{"key":28,"text":194,"correct":26},"高：直径=1：1的圆柱体",{"key":31,"text":196,"correct":22},"正方体",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":20,"analysis":33},1110547,"下列无侧限抗压强度试验检测的试验步骤的叙述有误的是（）",[201,203,205,207],{"key":20,"text":202,"correct":26},"配制混合料的上一步应为试料准备",{"key":24,"text":204,"correct":22},"提供试验报告应在最后一步进行",{"key":28,"text":206,"correct":22},"最佳含水量和最大干密度的确定在配制混合料之前进行",{"key":31,"text":208,"correct":22},"无侧限抗压强度试验的下一步为整理数字和强度评定并提供试验报告",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":28,"analysis":33},1110548,"关于测定无机结合料稳定土（包括稳定细粒土、中粒土和粗粒土）试件的无侧限抗压强度的说法正确的是（ ）。",[213,215,217,219],{"key":20,"text":214,"correct":22},"试件采用的是150mm×150mm×550mm的梁形试件",{"key":24,"text":216,"correct":22},"试件采用的是边长为150mm的正立方体为标准试件",{"key":28,"text":218,"correct":26},"试件都是高:直径=1:1的圆柱体标准试件",{"key":31,"text":220,"correct":22},"试件采用的是边长为70.7mm的正立方体为标准试件",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":31,"analysis":33},1110549,"沥青混凝土路面不平整的防治措施不包括（ ）。",[225,227,229,231],{"key":20,"text":226,"correct":22},"合理选择碾压速度",{"key":24,"text":228,"correct":22},"保证摊铺机均匀连续作业",{"key":28,"text":230,"correct":22},"合理确定初压温度",{"key":31,"text":232,"correct":26},"采用两台摊铺机梯队作业",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":28,"analysis":33},1110550,"桥面沥青混凝土路面不平整病害的原因不包括（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":22},"基层平整度不符合要求",{"key":24,"text":240,"correct":22},"基准线拉力不够",{"key":28,"text":242,"correct":26},"控制基层标高和平整度，控制混合料局部集中离析",{"key":31,"text":244,"correct":22},"摊铺过程中载料车卸料时撞击摊铺机",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":28,"analysis":33},1110551,"不属于石灰稳定土基层裂缝的防治措施是（ ）。",[249,251,253,255],{"key":20,"text":250,"correct":22},"采用塑性指数合适的土",{"key":24,"text":252,"correct":22},"控制压实含水量",{"key":28,"text":254,"correct":26},"每隔5～10m设一道胀缝",{"key":31,"text":256,"correct":22},"尽量避免在不利季节施工，最好在第一次冰冻来临一个半月前结束施工",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":28,"analysis":33},1110552,"石灰稳定土底基层裂缝病害的原因不包括（ ）",[261,263,265,267],{"key":20,"text":262,"correct":22},"含水量控制不好",{"key":24,"text":264,"correct":22},"图的塑形指数较高，黏性大",{"key":28,"text":266,"correct":26},"工程所在地温差小",{"key":31,"text":268,"correct":22},"拌合不均匀",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":28,"analysis":33},1110553,"属于预防水泥混凝土路面断板的措施是（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"尽量采用平接缝",{"key":24,"text":276,"correct":22},"采用两台或两台以上摊铺机梯队作业",{"key":28,"text":278,"correct":26},"做好压缝并及时切缝",{"key":31,"text":280,"correct":22},"在摊铺机前设专人清除掉在“滑靴”前的混合料",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":31,"analysis":33},1110554,"下列不属于断板的预防措施的是（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":22},"做好压缝及施工接缝",{"key":24,"text":288,"correct":22},"控制交通车辆",{"key":28,"text":290,"correct":22},"进行施工工艺的控制",{"key":31,"text":292,"correct":26},"注浆",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":24,"analysis":33},1110555,"对于水泥混凝土路面轻微断裂，裂缝无剥落或轻微剥落，裂缝宽度小于3mm的断板，宜采用（ ）的措施。",[297,299,301,303],{"key":20,"text":298,"correct":22},"快凝小石子填补",{"key":24,"text":300,"correct":26},"灌入胶粘剂封闭裂缝",{"key":28,"text":302,"correct":22},"快凝混凝土浇筑",{"key":31,"text":304,"correct":22},"整块板更换",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":20,"analysis":33},1110556,"某公路K20+200～K20+400为填方路基，路基改建在左侧加宽3m，路面为水泥混凝土路面，如果加宽路基压实不足，水泥混凝土路面面板易产生的病害是（ ）。",[309,311,313,315],{"key":20,"text":310,"correct":26},"纵向裂缝或断板",{"key":24,"text":312,"correct":22},"横向裂缝或断板",{"key":28,"text":314,"correct":22},"龟裂或横向裂缝",{"key":31,"text":316,"correct":22},"龟裂或纵向裂缝",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":31,"analysis":33},1110557,"下列关于水泥混凝土路面龟裂的原因叙述不正确的是（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":22},"混凝土配合比不合理，水泥用量和砂率过大",{"key":24,"text":324,"correct":22},"混凝土拌制时水灰比过大",{"key":28,"text":326,"correct":22},"模板与垫层过于干燥，吸水大",{"key":31,"text":328,"correct":26},"混凝土施工时，振捣不均匀",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":20,"analysis":33},1110558,"下列（ ）不是沥青混凝土路面纵向接缝的防治措施。",[333,335,336,338],{"key":20,"text":334,"correct":26},"预热已压实部分路面，以加强新旧混合料的粘结",{"key":24,"text":276,"correct":22},{"key":28,"text":337,"correct":22},"尽量采用热接缝施工",{"key":31,"text":339,"correct":22},"将已摊铺混合料留10～20cm暂不碾压，作为后摊铺部分的高程基准面，待后摊铺部分完成后一起碾压",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":24,"analysis":33},1110559,"可以预防沥青混凝土路面横向接缝病害的措施是（ ）。",[344,346,347,349],{"key":20,"text":345,"correct":22},"碾压的温度越低越好",{"key":24,"text":274,"correct":26},{"key":28,"text":348,"correct":22},"压路机先进行纵向碾压，再横向碾压",{"key":31,"text":350,"correct":22},"摊铺机起步速度要快",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":31,"analysis":33},1110560,"下列（ ）不是沥青混凝土路面横向接缝的防治措施。",[355,357,358,360],{"key":20,"text":356,"correct":22},"将已摊铺的路面尽头边缘锯成垂直面，并与纵向边缘成直角",{"key":24,"text":334,"correct":22},{"key":28,"text":359,"correct":22},"摊铺机起步速度要慢，碾压速度不宜过快",{"key":31,"text":339,"correct":26},{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":28,"analysis":33},1110561,"下列不属于嵌锁型粒料路面基层结构的是()。",[365,367,369,371],{"key":20,"text":366,"correct":22},"填隙碎石基层",{"key":24,"text":368,"correct":22},"泥结碎石基层",{"key":28,"text":370,"correct":26},"级配碎石基层",{"key":31,"text":372,"correct":22},"泥灰结碎石基层",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},1110562,"关于高速公路和一级公路无机结合料基层养护时交通管制的正确的说法是()。",[377,379,381,383],{"key":20,"text":378,"correct":22},"无机结合料稳定材料层养护期间，小型车辆和洒水车的行驶速度应小于60km\u002Fh。",{"key":24,"text":380,"correct":26},"无机结合料稳定材料养护7d 后，施工需要通行重型货车时，应有专人指挥，按规定的车道行驶，且车速应不大于30km\u002Fh",{"key":28,"text":382,"correct":22},"级配碎石、级配砾石基层未做透层沥青或铺设封层前，应及时开放交通",{"key":31,"text":384,"correct":22},"对高速公路和一 级公路 ，无施工便 道 ，可以及时组织施工",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":31,"analysis":33},1110563,"在路拌法水泥稳定土基层施工中，四个工序编号为：①准备下承层；②拌和；③洒水闷料；④整形，正确的工序先后排列是()。",[389,391,393,395],{"key":20,"text":390,"correct":22},"①②③④",{"key":24,"text":392,"correct":22},"②①③④",{"key":28,"text":394,"correct":22},"①②④③",{"key":31,"text":396,"correct":26},"①③②④",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":20,"analysis":33},1110564,"级配碎石采用路拌法施工时，可用于级配碎石摊铺的机械是（）。",[401,403,405,407],{"key":20,"text":402,"correct":26},"推土机",{"key":24,"text":404,"correct":22},"平地机",{"key":28,"text":406,"correct":22},"石屑撒布机",{"key":31,"text":408,"correct":22},"稳定土拌合机",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":31,"analysis":33},1110565,"我们平时习惯称为“二灰土”的基层是属于()。",[413,415,417,419],{"key":20,"text":414,"correct":22},"水泥灰稳定类",{"key":24,"text":416,"correct":22},"石灰泥稳定类",{"key":28,"text":418,"correct":22},"水泥石灰综合稳定类",{"key":31,"text":420,"correct":26},"石灰工业废渣稳定类",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":28,"analysis":33},1110566,"下列关于无机结合料稳定基层的适用范围的叙述中，正确的是()。",[425,427,429,431],{"key":20,"text":426,"correct":22},"石灰稳定土适用于一级公路的基层",{"key":24,"text":428,"correct":22},"石灰工业废渣稳定土仅适用于二级以下公路的基层",{"key":28,"text":430,"correct":26},"水泥稳定土适用于各级公路的基层",{"key":31,"text":432,"correct":22},"石灰工业废渣稳定土不应做二级和二级以上公路的底基层",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":24,"analysis":33},1110567,"无机结合料稳定基层的水泥材料应选用（ ）的水泥。",[437,439,441,443],{"key":20,"text":438,"correct":22},"初凝时间3h以上和终凝时间较短",{"key":24,"text":440,"correct":26},"初凝时间3h以上和终凝时间应大于6h且小于10h",{"key":28,"text":442,"correct":22},"初凝时间3h以内和终凝时间较短",{"key":31,"text":444,"correct":22},"初凝时间3h以内和终凝时间较长",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":20,"analysis":33},1110568,"填隙碎石应均匀地撒铺在已压稳的集料层上，松铺厚度宜为（）mm。",[449,451,453,455],{"key":20,"text":450,"correct":26},"25~30",{"key":24,"text":452,"correct":22},"20~25",{"key":28,"text":454,"correct":22},"15~20",{"key":31,"text":456,"correct":22},"10~15",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":20,"analysis":33},1110569,"填隙碎石施工中，首次撒铺填隙料的紧前工序是（）。",[461,463,465,467],{"key":20,"text":462,"correct":26},"初压",{"key":24,"text":464,"correct":22},"摊铺粗碎石",{"key":28,"text":466,"correct":22},"洒水饱和",{"key":31,"text":468,"correct":22},"碾压滚浆",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":24,"analysis":33},1110570,"当需分层铺筑时，应将已压成的填隙碎石层表面粗碎石外露约（）mm，然后在上摊铺第二层粗碎石。",[473,475,477,479],{"key":20,"text":474,"correct":22},"3~6",{"key":24,"text":476,"correct":26},"5~10",{"key":28,"text":478,"correct":22},"8~12",{"key":31,"text":480,"correct":22},"10~20",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":31,"analysis":33},1110571,"填隙碎石适用于()。",[485,487,489,491],{"key":20,"text":486,"correct":22},"二级公路基层",{"key":24,"text":488,"correct":22},"二、三级公路面层",{"key":28,"text":490,"correct":22},"二、三、四级公路基层",{"key":31,"text":492,"correct":26},"各级公路的底基层和二级以下公路的基层",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":20,"analysis":33},1110572,"属于嵌锁型粒料路面基层或底基层的是()。",[497,499,501,503],{"key":20,"text":498,"correct":26},"填隙碎石",{"key":24,"text":500,"correct":22},"级配碎石",{"key":28,"text":502,"correct":22},"石灰碎石",{"key":31,"text":504,"correct":22},"水泥碎石",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":24,"analysis":33},1110573,"下列粒料类基层中，适用范围最差的基层是()。",[509,510,511,513],{"key":20,"text":500,"correct":22},{"key":24,"text":498,"correct":26},{"key":28,"text":512,"correct":22},"级配碎砾石",{"key":31,"text":514,"correct":22},"级配砾石",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":31,"analysis":33},1110574,"属于路面基层粒料类级配型的是( )。",[519,520,522,524],{"key":20,"text":498,"correct":22},{"key":24,"text":521,"correct":22},"天然砾石轧制成碎石",{"key":28,"text":523,"correct":22},"天然砾石",{"key":31,"text":525,"correct":26},"符合级配的天然砂砾",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},1110575,"填隙碎石用作基层时，集料的压碎值应不大于（）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"22%",{"key":24,"text":533,"correct":26},"26%",{"key":28,"text":535,"correct":22},"30%",{"key":31,"text":537,"correct":22},"35%",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},1110576,"属于路面基层粒料类嵌锁型的是( )。",[542,543,545,547],{"key":20,"text":500,"correct":22},{"key":24,"text":544,"correct":26},"泥灰结碎石",{"key":28,"text":546,"correct":22},"水泥稳定碎石",{"key":31,"text":548,"correct":22},"沥青贯入碎石",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":31,"analysis":33},1110577,"不属于级配型材料的是（）。",[553,554,555,556],{"key":20,"text":500,"correct":22},{"key":24,"text":514,"correct":22},{"key":28,"text":525,"correct":22},{"key":31,"text":557,"correct":26},"直接轧制而未掺配的砾石",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":28,"analysis":33},1110578,"适用于各级公路粒料类基层和底基层的是（ ）",[562,564,565,566],{"key":20,"text":563,"correct":22},"泥结碎石",{"key":24,"text":544,"correct":22},{"key":28,"text":500,"correct":26},{"key":31,"text":514,"correct":22},{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":20,"analysis":33},1110579,"从适用范围考虑，下列()粒料类作基层和底基层最好。",[571,572,573,574],{"key":20,"text":500,"correct":26},{"key":24,"text":498,"correct":22},{"key":28,"text":514,"correct":22},{"key":31,"text":525,"correct":22},{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":28,"analysis":33},1110580,"符合级配、塑性指数等技术要求的天然砂砾，可用做()的基层。",[579,581,583,585],{"key":20,"text":580,"correct":22},"高速公路",{"key":24,"text":582,"correct":22},"一级和一级以下公路",{"key":28,"text":584,"correct":26},"轻交通的二级和二级以下公路",{"key":31,"text":586,"correct":22},"特重交通高速公路",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":20,"analysis":33},1110581,"可用于各级公路的基层和底基层的结构是()。",[591,592,593,594],{"key":20,"text":500,"correct":26},{"key":24,"text":498,"correct":22},{"key":28,"text":514,"correct":22},{"key":31,"text":512,"correct":22},[596,599,602,605,608,611],{"id":15,"name":597,"category":7,"favorite":598},"领导干部任职前廉政法规知识测试题",92,{"id":600,"name":601,"category":7,"favorite":15},595,"建筑结构与设备",{"id":603,"name":604,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":606,"name":607,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":609,"name":610,"category":7,"favorite":8},534,"BIM工程师",{"id":612,"name":610,"category":7,"favorite":8},535]