[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":594},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,5,50,1644,[13,34,46,58,70,82,91,103,114,126,138,146,156,164,173,185,197,209,221,233,245,257,268,280,292,304,316,327,339,351,363,375,387,398,410,422,432,444,456,468,480,490,502,514,526,538,550,562,574,584],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1110378,1,"单选题","采用灌砂法检测压实度，不宜用于（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","填石路堤",true,{"key":24,"text":25,"correct":26},"B","二灰基层",false,{"key":28,"text":29,"correct":26},"C","砂石路面",{"key":31,"text":32,"correct":26},"D","沥青贯入式路面","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1110379,"路基土压实度的现场测定主要方法是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"重型击实法",{"key":24,"text":41,"correct":22},"灌砂法",{"key":28,"text":43,"correct":26},"表面振动压实仪法",{"key":31,"text":45,"correct":26},"贝克曼梁法",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1110380,"击实试验中，每层按规定的击实次数进行击实，要求击完后余土高度不超过试筒顶面（ ）m m。",[50,52,54,56],{"key":20,"text":51,"correct":22},"5",{"key":24,"text":53,"correct":26},"7",{"key":28,"text":55,"correct":26},"9",{"key":31,"text":57,"correct":26},"10",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1110381,"最佳含水量是指（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"土基达到含水饱和所对应的含水量",{"key":24,"text":65,"correct":22},"土基达到最大干密度所对应的含水量",{"key":28,"text":67,"correct":26},"在击实曲线上最小干密度所对应的标准含水量",{"key":31,"text":69,"correct":26},"在标准击实曲线上最小干密度所对应的含水量",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1110382,"土基施工最佳含水量是指（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"在击实曲线上最大干密度所对饱和曲线的值",{"key":24,"text":77,"correct":22},"击实曲线上最大干密度所对应的含水率",{"key":28,"text":79,"correct":26},"在击实曲线上最小于密度所对应的标准含水量",{"key":31,"text":81,"correct":26},"在标准击实曲线上最小于密度所对应的含水量",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1110383,"击实试验法用干法或湿法制备一组不同含水量的试样数应不少于（ ）个。",[86,88,89,90],{"key":20,"text":87,"correct":26},"3",{"key":24,"text":51,"correct":22},{"key":28,"text":53,"correct":26},{"key":31,"text":55,"correct":26},{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":20,"analysis":33},1110384,"重型击实法适用于土的粒径不大于（ ）mm。",[95,97,99,101],{"key":20,"text":96,"correct":22},"20",{"key":24,"text":98,"correct":26},"30",{"key":28,"text":100,"correct":26},"40",{"key":31,"text":102,"correct":26},"50",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":24,"analysis":33},1110385,"三角网的基线不应少于（ ）条。",[107,109,111,112],{"key":20,"text":108,"correct":26},"1",{"key":24,"text":110,"correct":22},"2",{"key":28,"text":87,"correct":26},{"key":31,"text":113,"correct":26},"4",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":31,"analysis":33},1110386,"高速公路、一级公路中线放样主要依据的设计表格是（ ）。",[118,120,122,124],{"key":20,"text":119,"correct":26},"路基设计表",{"key":24,"text":121,"correct":26},"水准点表",{"key":28,"text":123,"correct":26},"交点固定表",{"key":31,"text":125,"correct":22},"逐桩坐标表",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":20,"analysis":33},1110387,"利用经纬仪和钢尺，以曲线起点或终点为直角坐标原点，计算出待放点x，y坐标，进行放样的方法称为（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":22},"切线支距法",{"key":24,"text":133,"correct":26},"偏角法",{"key":28,"text":135,"correct":26},"坐标法",{"key":31,"text":137,"correct":26},"切基线法",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":20,"analysis":33},1110388,"以曲线起点、终点为坐标原点，以两端切线为z轴，过原点的曲线半径为y轴，根据曲线上各点的坐标进行测设的方法称为（ ）。",[142,143,144,145],{"key":20,"text":131,"correct":22},{"key":24,"text":133,"correct":26},{"key":28,"text":135,"correct":26},{"key":31,"text":137,"correct":26},{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":20,"analysis":33},1110389,"下面路基施工测量方法哪一种属于横断面边桩放样法（ ）。",[150,152,154,155],{"key":20,"text":151,"correct":22},"图解法",{"key":24,"text":153,"correct":26},"直角坐标法",{"key":28,"text":131,"correct":26},{"key":31,"text":133,"correct":26},{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":31,"analysis":33},1110390,"以曲线起点（或终点）至曲线任一点的弦线与切线之间的弦切角和弦长来确定待放点的位置的方法称为（ ）。",[160,161,162,163],{"key":20,"text":131,"correct":26},{"key":24,"text":153,"correct":26},{"key":28,"text":135,"correct":26},{"key":31,"text":133,"correct":22},{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":31,"analysis":33},1110391,"一级公路中线放样宜采用（ ）进行测量放样。",[168,169,170,172],{"key":20,"text":131,"correct":26},{"key":24,"text":133,"correct":26},{"key":28,"text":171,"correct":26},"穿线交点法",{"key":31,"text":135,"correct":22},{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":28,"analysis":33},1110392,"（）是将两个测站的载波相位进行实时处理，及时解算出观测点的三维坐标或地方平面直角坐标，并达到厘米级的精度",[177,179,181,183],{"key":20,"text":178,"correct":26},"大地测量系统",{"key":24,"text":180,"correct":26},"地理信息系统",{"key":28,"text":182,"correct":22},"GPS载波相位差分技术",{"key":31,"text":184,"correct":26},"遥感测量系统",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":20,"analysis":33},1110393,"核子密度湿度仪测量的指标有（ ）。",[189,191,193,195],{"key":20,"text":190,"correct":22},"密实度和含水量",{"key":24,"text":192,"correct":26},"密实度和弯沉",{"key":28,"text":194,"correct":26},"弯沉和含水量",{"key":31,"text":196,"correct":26},"含水量和抗滑性能",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":24,"analysis":33},1110394,"施工测量工作时必须遵守（ ）的原则。",[201,203,205,207],{"key":20,"text":202,"correct":26},"〝由局部到整体〞〝先控制后碎部〞",{"key":24,"text":204,"correct":22},"〝由整体到局部〞〝先控制后碎部〞",{"key":28,"text":206,"correct":26},"〝由整体到局部〞〝先碎部后控制〞",{"key":31,"text":208,"correct":26},"〝由局部到整体〞〝先碎部后控制〞",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":24,"analysis":33},1110395,"路基网裂病害的原因不包括（ ）。",[213,215,217,219],{"key":20,"text":214,"correct":26},"土的塑性指数偏高",{"key":24,"text":216,"correct":22},"路基碾压时土含水量偏小",{"key":28,"text":218,"correct":26},"路基下层土过湿",{"key":31,"text":220,"correct":26},"路基压实后养护不到位，表面失水过多",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":28,"analysis":33},1110396,"在软弱地基上进行高填方路基施工时，除对软基进行处理外，还应（ ）。",[225,227,229,231],{"key":20,"text":226,"correct":26},"避免填筑速度过快",{"key":24,"text":228,"correct":26},"严格分层厚度及压实度",{"key":28,"text":230,"correct":22},"在原地面上1～2m内不填筑细粒土",{"key":31,"text":232,"correct":26},"做好排水工程",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":24,"analysis":33},1110397,"路基边坡病害的原因不包括（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":26},"路基填筑层有效宽度不够，边坡二期贴补",{"key":24,"text":240,"correct":22},"暗涵结构物基底沉降或涵背回填压实度不符合规定",{"key":28,"text":242,"correct":26},"路基基底存在软土且厚度不均",{"key":31,"text":244,"correct":26},"路基处于陡峭的斜坡面上，原地面未开挖反坡台阶",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":24,"analysis":33},1110398,"路基填筑时，土质种类多，出现异类土壤混填，尤其是透水性差的土壤包裹透水性好的土壤，形成了水囊，容易造成的路基病害是（ ）。",[249,251,253,255],{"key":20,"text":250,"correct":26},"滑坡",{"key":24,"text":252,"correct":22},"“弹簧”路基现象",{"key":28,"text":254,"correct":26},"边坡失稳",{"key":31,"text":256,"correct":26},"混凝土面板断板",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":28,"analysis":33},1110399,"为避免路基顶面排水不畅，应采用下列（ ）防治措施。",[261,263,265,266],{"key":20,"text":262,"correct":26},"边坡植树植草",{"key":24,"text":264,"correct":26},"圬工砌筑时勾缝应密实",{"key":28,"text":232,"correct":22},{"key":31,"text":267,"correct":26},"设置隔离层",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":24,"analysis":33},1110400,"对路基产生“弹簧”且急于赶工的路段，可以采取（ ）的措施。",[272,274,276,278],{"key":20,"text":273,"correct":26},"增大压实机具功率",{"key":24,"text":275,"correct":22},"掺生石灰粉翻拌",{"key":28,"text":277,"correct":26},"适量洒水",{"key":31,"text":279,"correct":26},"掺碎石翻拌",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":28,"analysis":33},1110402,"以下措施中，不是预防路基边缘压实度不足的措施是（ ）。",[284,286,288,290],{"key":20,"text":285,"correct":26},"路基施工应按设计的要求超宽填筑",{"key":24,"text":287,"correct":26},"控制碾压工艺，保证机具碾压到边",{"key":28,"text":289,"correct":22},"采用强夯措施",{"key":31,"text":291,"correct":26},"提高路基边缘带压实遍数，确保边缘带碾压频率高于或不低于行车带",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":24,"analysis":33},1110403,"路基行车带压实度不足的原因不包括（ ）。",[296,298,300,302],{"key":20,"text":297,"correct":26},"不同类别土混填",{"key":24,"text":299,"correct":22},"路堤填料为级配较好的粗粒土",{"key":28,"text":301,"correct":26},"压实机械与填土厚度不匹配",{"key":31,"text":303,"correct":26},"含水量偏离最佳含水量",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":20,"analysis":33},1110404,"对锚杆挡土墙的特点描述错误的是（ ）。",[308,310,312,314],{"key":20,"text":309,"correct":22},"属于柔性结构物",{"key":24,"text":311,"correct":26},"施工工艺要求较高，要有钻孔、灌浆等配套的专用机械设备",{"key":28,"text":313,"correct":26},"节省工程投资",{"key":31,"text":315,"correct":26},"利于挡土墙的机械化、装配化施工，提高劳动生产率",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":24,"analysis":33},1110405,"下列对锚杆挡土墙的优点叙述中，不正确的是（ ）。",[320,321,323,325],{"key":20,"text":313,"correct":26},{"key":24,"text":322,"correct":22},"大量开挖基坑",{"key":28,"text":324,"correct":26},"结构重量轻",{"key":31,"text":326,"correct":26},"利于提高劳动生产率",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":20,"analysis":33},1110406,"关于加筋挡土墙的特点错误的是（ ）。",[331,333,335,337],{"key":20,"text":332,"correct":22},"填土引起的地基变形对加筋土挡土墙的稳定性影响比对其他重力式挡土墙大",{"key":24,"text":334,"correct":26},"是一种很好的抗震结构物",{"key":28,"text":336,"correct":26},"节约占地，造型美观；造价比较低",{"key":31,"text":338,"correct":26},"加筋土是柔性结构物，能够适应轻微的变形",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":31,"analysis":33},1110407,"宜修建加筋土挡墙的路段是（ ）。",[343,345,347,349],{"key":20,"text":344,"correct":26},"挖方路段",{"key":24,"text":346,"correct":26},"地形陡峭的山坡路段",{"key":28,"text":348,"correct":26},"半填半挖路段",{"key":31,"text":350,"correct":22},"地形平坦宽阔的填方路段",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":24,"analysis":33},1110408,"下列叙述正确的是（ ）。",[355,357,359,361],{"key":20,"text":356,"correct":26},"加筋土挡土墙适用于在挖方路段的边坡支挡",{"key":24,"text":358,"correct":22},"加筋土挡土墙一般由墙面板、填土、填土中布置的拉筋、基础、排水设施和沉降伸缩缝等几部分构成",{"key":28,"text":360,"correct":26},"加筋土是刚性结构物，抗振性能很差",{"key":31,"text":362,"correct":26},"相比普通重力式挡土墙，加筋土挡土墙占地量大、圬工量多",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":31,"analysis":33},1110409,"土工膜袋与坡面间应按设计要求铺设好（ ）。",[367,369,371,373],{"key":20,"text":368,"correct":26},"防水层",{"key":24,"text":370,"correct":26},"垫层",{"key":28,"text":372,"correct":26},"透层",{"key":31,"text":374,"correct":22},"土工织物滤层",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":28,"analysis":33},1110410,"依靠圬工墙体的自重抵抗墙后土体的侧向推力，以维持土体的稳定的挡土墙是（ ）。",[379,381,383,385],{"key":20,"text":380,"correct":26},"加筋挡土墙",{"key":24,"text":382,"correct":26},"锚杆挡土墙",{"key":28,"text":384,"correct":22},"重力式挡土墙",{"key":31,"text":386,"correct":26},"锚定板式挡土墙",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":28,"analysis":33},1110411,"浆砌片石护坡每（ ）m应留一伸缩缝。",[391,393,395,397],{"key":20,"text":392,"correct":26},"5～10",{"key":24,"text":394,"correct":26},"8～12",{"key":28,"text":396,"correct":22},"10～15",{"key":31,"text":96,"correct":26},{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":28,"analysis":33},1110412,"不属于沿河路基防护的是（ ）。",[402,404,406,408],{"key":20,"text":403,"correct":26},"土工膜袋",{"key":24,"text":405,"correct":26},"顺坝",{"key":28,"text":407,"correct":22},"土钉支护",{"key":31,"text":409,"correct":26},"排桩防护",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":28,"analysis":33},1110413,"下列结构设施中既可以用以防止路基变形或支挡路基本体或山体的位移，又可以保证其稳定性的是（ ）。",[414,416,418,420],{"key":20,"text":415,"correct":26},"石笼",{"key":24,"text":417,"correct":26},"浆砌片石护坡",{"key":28,"text":419,"correct":22},"挡土墙",{"key":31,"text":421,"correct":26},"喷射混凝土封面",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":24,"analysis":33},1110414,"属于沿河路基防护的设施是（ ）。",[426,427,428,430],{"key":20,"text":407,"correct":26},{"key":24,"text":405,"correct":22},{"key":28,"text":429,"correct":26},"石笼挡土墙",{"key":31,"text":431,"correct":26},"铺草皮",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":28,"analysis":33},1110415,"某沿河路段修筑有石笼、丁坝、砌石护坡，并在边坡铺草皮，在河滩大量植树，上述结构和措施属于（ ）。",[436,438,440,442],{"key":20,"text":437,"correct":26},"路基防水工程",{"key":24,"text":439,"correct":26},"路基加固工程",{"key":28,"text":441,"correct":22},"路基防护工程",{"key":31,"text":443,"correct":26},"路基护坡工程",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":20,"analysis":33},1110416,"属于骨架植物防护的是（ ）。",[448,450,452,454],{"key":20,"text":449,"correct":22},"水泥混凝土空心块护坡",{"key":24,"text":451,"correct":26},"挂网喷护",{"key":28,"text":453,"correct":26},"喷混植生",{"key":31,"text":455,"correct":26},"护面墙",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":24,"analysis":33},1110417,"关于水泥混凝土空心块护坡施工的说法，错误的是（ ）。",[460,462,464,466],{"key":20,"text":461,"correct":26},"预制块应与坡面紧贴，不得有空隙，并与相邻坡面平顺",{"key":24,"text":463,"correct":22},"预制块铺置应在路堤填筑工程中施工",{"key":28,"text":465,"correct":26},"预制块经验收合格后方可使用",{"key":31,"text":467,"correct":26},"预制块铺置前应将坡面整平",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":31,"analysis":33},1110418,"填石路堤压实质量标准中，上路堤采用中硬石料时的孔隙率应（ ）。",[472,474,476,478],{"key":20,"text":473,"correct":26},"≤25％",{"key":24,"text":475,"correct":26},"≤24％",{"key":28,"text":477,"correct":26},"≤23％",{"key":31,"text":479,"correct":22},"≤22％",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":28,"analysis":33},1110419,"在填石路堤顶面与细粒土填土层之间应按设计要求设（ ）。",[484,485,487,489],{"key":20,"text":370,"correct":26},{"key":24,"text":486,"correct":26},"封层",{"key":28,"text":488,"correct":22},"过渡层",{"key":31,"text":372,"correct":26},{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":28,"analysis":33},1110420,"填石路堤的压实质量标准宜采用（ ）作为控制指标。",[494,496,498,500],{"key":20,"text":495,"correct":26},"贯入度",{"key":24,"text":497,"correct":26},"弯沉值",{"key":28,"text":499,"correct":22},"孔隙率",{"key":31,"text":501,"correct":26},"干密度",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":24,"analysis":33},1110421,"下列关于填石路基的填筑要求中，叙述不正确的是（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":26},"软质石料与硬质石料严禁混合使用",{"key":24,"text":509,"correct":22},"二级及二级以上公路的填石路堤应分段填筑压实",{"key":28,"text":511,"correct":26},"路堤施工前，应先修筑试验路段",{"key":31,"text":513,"correct":26},"压实机械宜选用自重不小于18t的振动压路机",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":28,"analysis":33},1110422,"关于填石路基施工要求的说法,错误的是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":26},"严禁将软质石料与硬质石料混合使用",{"key":24,"text":521,"correct":26},"中硬、硬质石料填筑路堤时,应进行边坡码砌",{"key":28,"text":523,"correct":22},"压路机宜选用自重不小于14t的静作用压路机",{"key":31,"text":525,"correct":26},"压实质量标准宜采用孔隙率作为指标",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":31,"analysis":33},1110423,"土石路堤填筑施工，压实机械宜选用（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":26},"自重不小于12t的胶轮压路机",{"key":24,"text":533,"correct":26},"自重不小于12t的振动压路机",{"key":28,"text":535,"correct":26},"自重不小于18t的胶轮压路机",{"key":31,"text":537,"correct":22},"自重不小于18t的振动压路机",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":28,"analysis":33},1110424,"以下不属于路基竖向填筑法特点的有（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":26},"从路基一端或两端按横断面全部高度，逐步推进填筑",{"key":24,"text":545,"correct":26},"填土过厚，不易压实",{"key":28,"text":547,"correct":22},"是路基填筑的常用方法",{"key":31,"text":549,"correct":26},"一般要进行沉降量及稳定性测定",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":24,"analysis":33},1110425,"关于土方路堤填筑施工程序正确的是（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":26},"施工准备-----填筑前基底处理-----基底检测-----填料分层填筑-----推土机摊平------碾压-----平地机整平-----检测",{"key":24,"text":557,"correct":22},"施工准备-----填筑前基底处理-----基底检测-----填料分层填筑-----推土机摊平-----平地机整平------碾压-----检测",{"key":28,"text":559,"correct":26},"施工准备-----填筑前基底处理-----基底检测-----推土机摊平-----填料分层填筑-----平地机整平------碾压-----检测",{"key":31,"text":561,"correct":26},"施工准备-----基底检测-----填筑前基底处理-----填料分层填筑-----推土机摊平-----平地机整平------碾压-----检测",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":20,"analysis":33},1110426,"某公路某段路基采用路堤填筑常用的方法，按照层次，逐层向上填筑，则它采用的是（ ）。",[566,568,570,572],{"key":20,"text":567,"correct":22},"水平分层填筑法",{"key":24,"text":569,"correct":26},"纵向分层填筑法",{"key":28,"text":571,"correct":26},"横向填筑法",{"key":31,"text":573,"correct":26},"联合填筑法",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":31,"analysis":33},1110427,"当由于地形限制或填筑堤身较高，不宜采用另外两种方法施工时，施工方法宜采用（ ）。",[578,579,580,582],{"key":20,"text":567,"correct":26},{"key":24,"text":569,"correct":26},{"key":28,"text":581,"correct":26},"竖向填筑法",{"key":31,"text":583,"correct":22},"混合填筑法",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":28,"analysis":33},1110428,"仅用于无法自下而上填筑的深谷、陡坡、断岩、泥沼等机械无法进场的土方路堤的填筑方法是（ ）。",[588,589,591,592],{"key":20,"text":583,"correct":26},{"key":24,"text":590,"correct":26},"碾压法",{"key":28,"text":581,"correct":22},{"key":31,"text":593,"correct":26},"分层填筑法",[595,598,601,604,607,610],{"id":15,"name":596,"category":7,"favorite":597},"领导干部任职前廉政法规知识测试题",92,{"id":599,"name":600,"category":7,"favorite":15},595,"建筑结构与设备",{"id":602,"name":603,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":605,"name":606,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":608,"name":609,"category":7,"favorite":8},534,"BIM工程师",{"id":611,"name":609,"category":7,"favorite":8},535]