[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-33":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":656},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,33,50,1644,[13,38,53,68,83,98,110,125,139,154,168,183,198,212,226,240,255,270,284,299,313,328,343,357,372,387,401,415,429,441,456,471,485,500,514,529,543,557,571,585,599,613,628,642],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1111794,2,"多选题","属于大型公路工程项目“单位工程”的有()。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","路基",true,{"key":24,"text":25,"correct":22},"B","路面",{"key":27,"text":28,"correct":29},"C","桥梁下部",false,{"key":31,"text":32,"correct":29},"D","桥梁承台",{"key":34,"text":35,"correct":22},"E","涵洞","ABE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1111795,"（2019年）钻孔灌注桩的质量控制关键点有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"护筒埋深",{"key":24,"text":45,"correct":22},"孔径控制",{"key":27,"text":47,"correct":29},"基底表面松散层清理",{"key":31,"text":49,"correct":22},"桩顶、桩底标高控制",{"key":34,"text":51,"correct":22},"钢筋笼接头质量","ABDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1111796,"某施工单位因延误了工期，需压缩某工作的持续时间，可采用的技术措施有()。",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"增加每天的劳动力数量",{"key":24,"text":60,"correct":22},"改变施工工艺",{"key":27,"text":62,"correct":29},"用物质激励以提高工作效率",{"key":31,"text":64,"correct":22},"采用先进的施工机械",{"key":34,"text":66,"correct":29},"增加工作面","BD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1111797,"（2019年）公路施工过程基本组织方法除流水作业法外，还有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":29},"矩阵作业法",{"key":24,"text":75,"correct":29},"时差作业法",{"key":27,"text":77,"correct":29},"班组作业法",{"key":31,"text":79,"correct":22},"平行作业法",{"key":34,"text":81,"correct":22},"顺序作业法","DE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1111798,"施工组织设计中，施工总体部署的主要内容有()。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"建立施工管理机构",{"key":24,"text":90,"correct":22},"划分各参与单位的施工任务",{"key":27,"text":92,"correct":29},"制定主要分项工程的施工方案",{"key":31,"text":94,"correct":22},"安排施工顺序",{"key":34,"text":96,"correct":29},"制定资源需求计划","ABD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":97,"analysis":37},1111799,"（2018年）施工总体部署是施工组织设计的重要内容之一，其主要内容有（ ）。",[102,103,105,107,108],{"key":20,"text":88,"correct":22},{"key":24,"text":104,"correct":22},"划分施工任务",{"key":27,"text":106,"correct":29},"编制资源供应计划",{"key":31,"text":94,"correct":22},{"key":34,"text":109,"correct":29},"制定季节性施工技术措施",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":124,"analysis":37},1111800,"安全生产事故专项应急预案是针对具体的()和应急保障而制定的计划或方案。",[114,116,118,120,122],{"key":20,"text":115,"correct":22},"事故类别",{"key":24,"text":117,"correct":22},"危险源",{"key":27,"text":119,"correct":29},"装置",{"key":31,"text":121,"correct":29},"场所",{"key":34,"text":123,"correct":29},"岗位","AB",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":36,"analysis":37},1111801,"公路工程安全生产事故应急预案的种类有()。",[129,131,133,135,137],{"key":20,"text":130,"correct":22},"综合应急预案",{"key":24,"text":132,"correct":22},"专项应急预案",{"key":27,"text":134,"correct":29},"一般事故应急预案",{"key":31,"text":136,"correct":29},"重大事故应急预案",{"key":34,"text":138,"correct":22},"现场处置方案",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":153,"analysis":37},1111802,"专项施工方案的内容有()。",[143,145,147,149,151],{"key":20,"text":144,"correct":22},"工程概况与编制依据",{"key":24,"text":146,"correct":22},"施工计划",{"key":27,"text":148,"correct":22},"施工工艺技术",{"key":31,"text":150,"correct":22},"施工安全保证措施",{"key":34,"text":152,"correct":29},"工程估算及附图","ABCD",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":67,"analysis":37},1111803,"（2020年真题）关于施工单位项目部驻地建设要求的说法，正确的有（ ）。",[158,160,162,164,166],{"key":20,"text":159,"correct":29},"自建房最低标准为活动板房，搭建不宜超过三层",{"key":24,"text":161,"correct":22},"项目经理部人均办公面积一般不小于6㎡",{"key":27,"text":163,"correct":29},"生活污水排放应进行规划设计，设置一级沉淀池",{"key":31,"text":165,"correct":22},"寒冷地区驻地办公区、生活区应采用集中供暖设计，严禁电力取暖",{"key":34,"text":167,"correct":29},"驻地采用院落封闭管理，距离集中爆破区300m以外",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":182,"analysis":37},1111804,"铲运机不适宜在()中施工。",[172,174,176,178,180],{"key":20,"text":173,"correct":29},"湿度较小（含水量在25%以下）的松散砂土",{"key":24,"text":175,"correct":22},"地下水位高的潮湿地区",{"key":27,"text":177,"correct":22},"干燥的粉砂土",{"key":31,"text":179,"correct":22},"潮湿的黏土",{"key":34,"text":181,"correct":22},"沼泽地带","BCDE",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":197,"analysis":37},1111805,"（2018年）可用于隧道二次衬砌的施工机械设备有（ ）。",[187,189,191,193,195],{"key":20,"text":188,"correct":29},"锚杆台车",{"key":24,"text":190,"correct":29},"混凝土喷射机",{"key":27,"text":192,"correct":22},"混凝土搅拌站",{"key":31,"text":194,"correct":22},"搅拌运输车",{"key":34,"text":196,"correct":22},"混凝土输送泵","CDE",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":52,"analysis":37},1111806,"（2019年）计算沥青混合料摊铺机生产率时，应考虑的参数有（ ）。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"铺层厚",{"key":24,"text":205,"correct":22},"摊铺带宽",{"key":27,"text":207,"correct":29},"材料运输速度",{"key":31,"text":209,"correct":22},"沥青混合料密度",{"key":34,"text":211,"correct":22},"时间利用系数",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":153,"analysis":37},1111807,"（2019年）下列各项费用中，需计入投标报价的有（ ）。",[216,218,220,222,224],{"key":20,"text":217,"correct":22},"第三方责任险",{"key":24,"text":219,"correct":22},"计日工费用",{"key":27,"text":221,"correct":22},"材料暂估价",{"key":31,"text":223,"correct":22},"暂列金额",{"key":34,"text":225,"correct":29},"青苗补偿费",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":124,"analysis":37},1111808,"电力起爆时，在同一爆破网上的电雷管必须是()。",[230,232,234,236,238],{"key":20,"text":231,"correct":22},"厂家相同",{"key":24,"text":233,"correct":22},"型号相同",{"key":27,"text":235,"correct":29},"生产日期相同",{"key":31,"text":237,"correct":29},"颜色相同",{"key":34,"text":239,"correct":29},"脚线长度相等",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":254,"analysis":37},1111809,"高处露天作业应避开的恶劣气候包括()。",[244,246,248,250,252],{"key":20,"text":245,"correct":22},"台风",{"key":24,"text":247,"correct":29},"降温",{"key":27,"text":249,"correct":22},"浓雾",{"key":31,"text":251,"correct":22},"雷雨",{"key":34,"text":253,"correct":22},"冰雪","ACDE",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":269,"analysis":37},1111810,"下列关于施工现场临时用电要求中，正确的有()。",[259,261,263,265,267],{"key":20,"text":260,"correct":22},"采用TN-S接地、接零保护系统",{"key":24,"text":262,"correct":22},"采用三级配电系统",{"key":27,"text":264,"correct":22},"采用两级漏电保护和两道防线",{"key":31,"text":266,"correct":29},"采用同一个开关电器直接控制多个用电设备",{"key":34,"text":268,"correct":29},"必须按照“开关箱→分配电箱→总配电箱”顺序送电","ABC",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":182,"analysis":37},1111811,"下列关于基坑开挖作业的说法中，正确的有()。",[274,276,278,280,282],{"key":20,"text":275,"correct":29},"为便利人员上下基坑的专用坡道宽度应为40cm",{"key":24,"text":277,"correct":22},"基坑深度超过1.5m且不加支撑时，应按要求放坡",{"key":27,"text":279,"correct":22},"应采取截流措施，防止地表水流入基坑",{"key":31,"text":281,"correct":22},"开挖深度超过2.0m时，应按高处作业进行安全防护",{"key":34,"text":283,"correct":22},"在开挖的沟槽坑边沿1.0m以内不许堆土和物料",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":298,"analysis":37},1111812,"公路工程施工现场临时用电的基本原则有()。",[288,290,292,294,296],{"key":20,"text":289,"correct":22},"必须采用TN-S接地、接零保护系统",{"key":24,"text":291,"correct":29},"必须采用两级配电系统",{"key":27,"text":293,"correct":22},"必须采用两级漏电保护和两道防线",{"key":31,"text":295,"correct":29},"必须采用“一机双闸”制度",{"key":34,"text":297,"correct":29},"必须采用三相四线制供电系统","AC",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":52,"analysis":37},1111813,"关于人工挖孔灌注桩施工的说法，正确的有()。",[303,305,307,309,311],{"key":20,"text":304,"correct":22},"开挖的地质层应为无水或少水的砂性土层",{"key":24,"text":306,"correct":22},"所用电器设备必须设漏电保护装置",{"key":27,"text":308,"correct":29},"相邻两孔施工时，一孔进行混凝土浇筑，另一孔作业人员应停止作业，在孔内待命",{"key":31,"text":310,"correct":22},"孔深超过10m时，应采用机械通风",{"key":34,"text":312,"correct":22},"孔内照明电压不能超过36V",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":327,"analysis":37},1111814,"在居民区进行路基土方开挖，当开挖深度达到2m时，必须采取的安全防护措施包括()。",[317,319,321,323,325],{"key":20,"text":318,"correct":22},"作业人员要戴安全帽",{"key":24,"text":320,"correct":29},"必须系安全带",{"key":27,"text":322,"correct":22},"设警示标志",{"key":31,"text":324,"correct":29},"设高度不低于1.0m的双道防护栏",{"key":34,"text":326,"correct":22},"设夜间红色警示灯","ACE",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":342,"analysis":37},1111815,"关于隧道施工安全技术要求的说法，正确的有()。",[332,334,336,338,340],{"key":20,"text":333,"correct":29},"所有隧道施工前都要制定地质超前预报方案和实施细则",{"key":24,"text":335,"correct":22},"爆破器材管理人员必须穿防静电服装",{"key":27,"text":337,"correct":29},"炮眼打好后要立即装药",{"key":31,"text":339,"correct":29},"同一辆汽车运送炸药和雷管时必须隔开一定距离摆放",{"key":34,"text":341,"correct":22},"不得在隧道内使用内燃抽水机","BE",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":342,"analysis":37},1111816,"施工现场使用的电动工具通常分为Ⅰ、Ⅱ、Ⅲ类，其划分的主要依据有（ ）。（2017年真题）",[347,349,351,353,355],{"key":20,"text":348,"correct":29},"重量",{"key":24,"text":350,"correct":22},"绝缘性能",{"key":27,"text":352,"correct":29},"体积",{"key":31,"text":354,"correct":29},"价格",{"key":34,"text":356,"correct":22},"防触电性能",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":371,"analysis":37},1111817,"（2020年真题）关于公路工程施工测量管理的说法，正确的有（ ）。",[361,363,365,367,369],{"key":20,"text":362,"correct":22},"对设计平面控制桩和高程控制桩等逐一进行确认接收，做好记录，办理交接桩签认手续",{"key":24,"text":364,"correct":22},"完成复测后，编制复测成果报告，经监理、设计单位签字确认后使用",{"key":27,"text":366,"correct":22},"在设计控制网点的基础上进行加密时，相邻加密桩点间保证通视且间距不宜超过300m",{"key":31,"text":368,"correct":29},"水准点加密时，沿路线每300m应有一个水准点",{"key":34,"text":370,"correct":22},"导线复测时，同一建设项目相邻施工段的导线应闭合，并满足同等精度要求","ABCE",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":386,"analysis":37},1111818,"根据《公路工程基本建设项目概算预算编制办法》，以各类工程的直接工程费之和作为基数计算费用的有()。",[376,378,380,382,384],{"key":20,"text":377,"correct":22},"雨期施工增加费",{"key":24,"text":379,"correct":29},"夜间施工增加费",{"key":27,"text":381,"correct":29},"高原地区施工增加费",{"key":31,"text":383,"correct":22},"施工辅助费",{"key":34,"text":385,"correct":29},"企业管理费","AD",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":400,"analysis":37},1111819,"下列费用中，属于直接费的有()。",[391,393,395,397,399],{"key":20,"text":392,"correct":22},"安全及文明施工措施费",{"key":24,"text":394,"correct":29},"主副食运输补贴",{"key":27,"text":396,"correct":29},"工程排污费",{"key":31,"text":398,"correct":22},"临时设施费",{"key":34,"text":383,"correct":22},"ADE",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":197,"analysis":37},1111820,"对施工材料成本的现场控制一般有()等方面的控制。",[405,407,409,411,413],{"key":20,"text":406,"correct":29},"采购保管",{"key":24,"text":408,"correct":29},"场外运输",{"key":27,"text":410,"correct":22},"场内二次转运",{"key":31,"text":412,"correct":22},"操作损耗",{"key":34,"text":414,"correct":22},"材料发放",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":386,"analysis":37},1111821,"公路工程建筑安装工程费中，施工标准化与安全措施包括（）。",[419,421,423,425,427],{"key":20,"text":420,"correct":22},"工程施工期间为满足安全生产所产生的费用",{"key":24,"text":422,"correct":29},"施工期间为保证交通安全而设置的临时安全设施和标志、标牌的费用",{"key":27,"text":424,"correct":29},"预制场、拌和站的施工标准化费用",{"key":31,"text":426,"correct":22},"工程施工期间为满足施工标准化、规范化、精细化所发生的费用",{"key":34,"text":428,"correct":29},"临时便道、临时便桥的施工标准化费用",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":67,"analysis":37},1111822,"已包括在公路工程概、预算定额中的“其他工程费”有()。",[433,434,436,438,440],{"key":20,"text":379,"correct":29},{"key":24,"text":435,"correct":22},"施工中的水、电费",{"key":27,"text":437,"correct":29},"工地转移费",{"key":31,"text":439,"correct":22},"材料二次搬运费",{"key":34,"text":383,"correct":29},{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":455,"analysis":37},1111823,"（2020年真题）关于分包合同管理的说法，正确的有（ ）。",[445,447,449,451,453],{"key":20,"text":446,"correct":29},"监理人只与承包人有监理与被监理关系，对分包人在现场施工仅承担协调管理义务",{"key":24,"text":448,"correct":22},"承包人对分包工程的实施具有全面管理责任",{"key":27,"text":450,"correct":29},"监理人就分包工程施工发布的任何指示均应同时发给承包人和分包人",{"key":31,"text":452,"correct":22},"分包人不能直接向监理人提出付款申请",{"key":34,"text":454,"correct":22},"分包人的索赔要求只能向承包人提出","BDE",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":470,"analysis":37},1111824,"《公路水运安全生产管理监督管理办法》所指的三类安全生产管理人员中，属于施工单位主要负责人的有()。",[460,462,464,466,468],{"key":20,"text":461,"correct":29},"企业法定代表人授权的项目经理",{"key":24,"text":463,"correct":22},"企业法定代表人",{"key":27,"text":465,"correct":22},"企业安全生产工作的负责人",{"key":31,"text":467,"correct":29},"项目总工",{"key":34,"text":469,"correct":29},"企业安全生产管理机构的负责人","BC",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":371,"analysis":37},1111825,"根据《公路水运工程安全生产监督管理办法》的规定，一般情况下应当编制安全生产专项施工方案的危险性较大工程有()等。",[475,477,479,481,483],{"key":20,"text":476,"correct":22},"不良地质条件下的土方开挖",{"key":24,"text":478,"correct":22},"连续梁桥的悬臂拼装作业",{"key":27,"text":480,"correct":22},"边通航边施工的水上工程",{"key":31,"text":482,"correct":29},"路面水泥混凝土浇筑施工",{"key":34,"text":484,"correct":22},"桥梁加固工程",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":499,"analysis":37},1111826,"根据安全管理相关规定，对于施工单位编制的危险性较大工程专项施工方案进行专家论证审查时，可担任专家组成员的有()。",[489,491,493,495,497],{"key":20,"text":490,"correct":22},"该项目设计单位专家",{"key":24,"text":492,"correct":29},"该项目建设单位专家",{"key":27,"text":494,"correct":29},"该项目施工单位专家",{"key":31,"text":496,"correct":29},"该项目监理单位专家",{"key":34,"text":498,"correct":22},"参与该项目可行性研究报告审查的专家","AE",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":36,"analysis":37},1111827,"公路建设市场信用信息包括公路建设从业单位的（）。",[504,506,508,510,512],{"key":20,"text":505,"correct":22},"不良行为信息",{"key":24,"text":507,"correct":22},"表彰奖励类良好行为信息",{"key":27,"text":509,"correct":29},"自由及租凭设备基本情况",{"key":31,"text":511,"correct":29},"资质、资格情况",{"key":34,"text":513,"correct":22},"信用评价信息",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":528,"analysis":37},1111828,"（2019年）根据《公路工程建设项目招标投标管理办法》，关于招标投标的说法，错误的有（ ）。",[518,520,522,524,526],{"key":20,"text":519,"correct":29},"初步设计文件批准后，方可开展施工监理招标",{"key":24,"text":521,"correct":22},"已选定的特许经营项目投资人依法能够自行施工时，可以不进行招标",{"key":27,"text":523,"correct":22},"招标人可设置最低投标限价和最高投标限价",{"key":31,"text":525,"correct":22},"公路工程勘察设计招标不采用综合评估法进行评标",{"key":34,"text":527,"correct":29},"招标人以分包的工作量规模作为否决投标的条件，属于对分包的歧视性条款","BCD",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":528,"analysis":37},1111829,"（2018年）根据《公路工程竣(交)工验收办法实施细则》，公路工程交工验收应具备的条件有（ ）。",[533,535,537,539,541],{"key":20,"text":534,"correct":29},"通车试运营2年以上",{"key":24,"text":536,"correct":22},"施工单位按《公路工程质量检验评定标准》及相关规定对工程质量自检合格",{"key":27,"text":538,"correct":22},"监理单位对工程质量评定合格",{"key":31,"text":540,"correct":22},"质量监督机构按“公路工程质量鉴定办法”对工程质量进行检测，并出具检测意见，检测意见中需整改的问题已经处理完毕",{"key":34,"text":542,"correct":29},"档案、环保等单项验收合格，土地使用手续已办理",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":455,"analysis":37},1111830,"关于公路工程竣（交）工验收的说法，正确的有（ ）。（2017年真题）",[547,549,551,553,555],{"key":20,"text":548,"correct":29},"竣工验收委员会由交通运输主管部门、项目法人、质量监督机构等单位代表组成",{"key":24,"text":550,"correct":22},"通车试运营2年以上方可进行竣工验收",{"key":27,"text":552,"correct":29},"竣工验收质量等级评定分为合格和不合格",{"key":31,"text":554,"correct":22},"通过交工验收的合同段，项目法人应及时颁发“公路工程交工验收证书”",{"key":34,"text":556,"correct":22},"批准的项目建议书是竣工验收的重要依据",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":298,"analysis":37},1111831,"可冬期进行的路基施工项目有()。",[561,563,565,567,569],{"key":20,"text":562,"correct":22},"含水量高的流砂地段开挖",{"key":24,"text":564,"correct":29},"路基边坡整修",{"key":27,"text":566,"correct":22},"岩石地段的路堑开挖",{"key":31,"text":568,"correct":29},"填方地段的台阶挖掘",{"key":34,"text":570,"correct":29},"一级公路的路基施工",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":36,"analysis":37},1111832,"沥青结构层的施工方法有()。",[575,577,579,581,583],{"key":20,"text":576,"correct":22},"层铺法",{"key":24,"text":578,"correct":22},"路拌法",{"key":27,"text":580,"correct":29},"滑模摊铺法",{"key":31,"text":582,"correct":29},"轨道摊铺法",{"key":34,"text":584,"correct":22},"热拌热铺法",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":153,"analysis":37},1111833,"公路工程进行竣工验收应具备的条件有()。",[589,591,593,595,597],{"key":20,"text":590,"correct":22},"竣工文件已按交通运输部规定的内容完成",{"key":24,"text":592,"correct":22},"工程决算已按交通运输部规定的办法编制完成，竣工决算已经审计，并经交通主管部门或其授权单位认定",{"key":27,"text":594,"correct":22},"对需进行档案、环保等单项验收的项目，已经有关部门验收合格",{"key":31,"text":596,"correct":22},"质量监督机构已按交通运输部规定的公路工程质量鉴定办法对工程质量检测鉴定合格，并形成工程质量鉴定报告",{"key":34,"text":598,"correct":29},"通车试运营3年后",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":400,"analysis":37},1111834,"关于一般分包的说法中，错误的有()。",[603,605,607,609,611],{"key":20,"text":604,"correct":22},"分包单位由业主或监理工程师选择",{"key":24,"text":606,"correct":29},"分包合同须事先征得监理工程师的书面批准",{"key":27,"text":608,"correct":29},"承包商不能将全部工程分包出去",{"key":31,"text":610,"correct":22},"若因非分包商原因造成分包商的损失，分包商有权向监理工程师提出索赔要求",{"key":34,"text":612,"correct":22},"承包商在分包合同中可以转移部分责任义务给分包商，因此监理工程师应相应解除承包商承担的该部分责任和义务",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":627,"analysis":37},1111835,"关于劳务用工方式的说法，错误的有()。",[617,619,621,623,625],{"key":20,"text":618,"correct":29},"施工总承包企业可通过自有劳务人员完成劳务作业",{"key":24,"text":620,"correct":29},"专业承包企业可以拥有独资或控股的施工劳务企业，组织自有劳务人员完成劳务作业",{"key":27,"text":622,"correct":22},"专业承包企业可以将劳务作业分包给具有施工劳务资质的企业，但不能将部分临时性的工作使用劳务派遣人员完成作业",{"key":31,"text":624,"correct":29},"施工劳务企业应组织自有劳务人员完成劳务分包作业",{"key":34,"text":626,"correct":22},"施工劳务企业可以将部分劳务作业分包给劳务派遣人员","CE",{"id":629,"libraryId":5,"type":15,"typeLabel":16,"stem":630,"options":631,"answer":455,"analysis":37},1111836,"根据国家有关规定和材料使用上的要求，应当报废的自有周转材料有()。",[632,634,636,638,640],{"key":20,"text":633,"correct":29},"性价比较低的材料",{"key":24,"text":635,"correct":22},"无利用、改造价值的材料",{"key":27,"text":637,"correct":29},"原值摊销完毕，仅有部分使用价值的材料",{"key":31,"text":639,"correct":22},"耗能过大、环境污染超标无法改造的材料",{"key":34,"text":641,"correct":22},"主要结构和部件损坏严重，无法修复的或修复费用过大、不经济的材料",{"id":643,"libraryId":5,"type":15,"typeLabel":16,"stem":644,"options":645,"answer":371,"analysis":37},1111837,"公路工程施工周转材料的摊销方法主要有()。",[646,648,650,652,654],{"key":20,"text":647,"correct":22},"一次摊销法",{"key":24,"text":649,"correct":22},"分次摊销法",{"key":27,"text":651,"correct":22},"分期摊销法",{"key":31,"text":653,"correct":29},"差额摊销法",{"key":34,"text":655,"correct":22},"定额摊销法",[657,661,664,667,670,673],{"id":658,"name":659,"category":7,"favorite":660},1,"领导干部任职前廉政法规知识测试题",92,{"id":662,"name":663,"category":7,"favorite":658},595,"建筑结构与设备",{"id":665,"name":666,"category":7,"favorite":658},715,"招标采购专业知识与法律法规",{"id":668,"name":669,"category":7,"favorite":658},848,"市政方向-通用基础",{"id":671,"name":672,"category":7,"favorite":8},534,"BIM工程师",{"id":674,"name":672,"category":7,"favorite":8},535]