[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-32":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":728},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,32,50,1644,[13,38,53,68,83,98,113,128,143,158,173,187,201,216,230,245,259,274,288,303,318,332,346,360,374,388,403,418,432,446,460,474,488,502,516,530,545,556,570,584,598,610,623,637,651,665,679,690,700,714],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1111743,2,"多选题","某路段填隙碎石底基层备料时，计算该段所需的粗碎石体积数量不需要考虑的参数有()。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","底基层宽度",false,{"key":24,"text":25,"correct":22},"B","底基层厚度",{"key":27,"text":28,"correct":29},"C","运料车辆的车厢体积",true,{"key":31,"text":32,"correct":22},"D","松铺系数",{"key":34,"text":35,"correct":29},"E","粗碎石的含水量","CE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1111744,"无机结合料稳定材料组成设计所确定的施工参数包括（ ）。（2017年真题）",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"结合料的剂量",{"key":24,"text":45,"correct":22},"最佳含水量",{"key":27,"text":47,"correct":29},"合理含水率",{"key":31,"text":49,"correct":22},"最大松铺厚度",{"key":34,"text":51,"correct":29},"最大干密度","ACE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1111745,"（2020年真题）关于提高水泥稳定碎石材料强度的说法，正确的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"适当增加水泥用量",{"key":24,"text":60,"correct":29},"增加材料分档备料个数",{"key":27,"text":62,"correct":22},"提高压实度标准",{"key":31,"text":64,"correct":22},"增加拌合用水量",{"key":34,"text":66,"correct":22},"采用二次拌合生产工艺","AB",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1111746,"可用于路面透层的材料有()。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"沥青水泥浆",{"key":24,"text":75,"correct":29},"慢裂型乳化石油沥青",{"key":27,"text":77,"correct":29},"中裂型液体石油沥青",{"key":31,"text":79,"correct":22},"快裂型乳化石油沥青",{"key":34,"text":81,"correct":29},"慢裂型液体煤沥青","BCE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1111747,"关于沥青混凝土路面中封层作用的说法，正确的有()。",[87,89,91,93,95],{"key":20,"text":88,"correct":29},"封闭某一层，起保水防水作用",{"key":24,"text":90,"correct":22},"增加基层的整体强度和厚度",{"key":27,"text":92,"correct":29},"起基层与沥青表面层之间的过渡和有效联结作用",{"key":31,"text":94,"correct":29},"起路的某一层表面破坏离析松散处的加固补强作用",{"key":34,"text":96,"correct":29},"沥青面层铺筑前要临时开放交通，防止基层因天气或车辆作用出现水毁","ACDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1111748,"沥青路面中封层的作用有()。",[102,104,106,108,110],{"key":20,"text":103,"correct":29},"防水",{"key":24,"text":105,"correct":29},"层间过渡",{"key":27,"text":107,"correct":22},"防止反射裂缝",{"key":31,"text":109,"correct":29},"层间联结",{"key":34,"text":111,"correct":22},"结构受力","ABD",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},1111749,"新建水泥混凝土路面面板抗滑构造施工方法有()。",[117,119,121,123,125],{"key":20,"text":118,"correct":29},"人工拉槽",{"key":24,"text":120,"correct":29},"硬刻槽",{"key":27,"text":122,"correct":29},"拉毛机拉槽",{"key":31,"text":124,"correct":22},"铺砂",{"key":34,"text":126,"correct":22},"铣刨机铣刨","ABC",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":142,"analysis":37},1111750,"（2018年）水泥混凝土路面断板的治理措施有（ ）。",[132,134,136,138,140],{"key":20,"text":133,"correct":29},"直接灌浆",{"key":24,"text":135,"correct":29},"局部带状修补",{"key":27,"text":137,"correct":29},"扩缝灌浆",{"key":31,"text":139,"correct":22},"罩面补强",{"key":34,"text":141,"correct":29},"整块板更换","ABCE",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":157,"analysis":37},1111751,"（2019年）液体石油沥青可适用于（ ）。",[147,149,151,153,155],{"key":20,"text":148,"correct":22},"热拌沥青混合料",{"key":24,"text":150,"correct":29},"透层",{"key":27,"text":152,"correct":22},"SMA混合料",{"key":31,"text":154,"correct":29},"粘层",{"key":34,"text":156,"correct":29},"冷拌沥青混合料","BDE",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":172,"analysis":37},1111752,"关于沥青混合料压实的说法，正确的有（ ）。（2017年真题）",[162,164,166,168,170],{"key":20,"text":163,"correct":29},"压路机采用2～3台双轮双振压路机及2～3台重量不小于16t胶轮压路机组成",{"key":24,"text":165,"correct":29},"采用雾状喷水法，以保证沥青混合料碾压过程汇总不粘轮",{"key":27,"text":167,"correct":22},"在当天成型的路面上，不得停放各种机械设备或车辆",{"key":31,"text":169,"correct":22},"初压应采用钢轮雅鹿机紧跟摊铺机振动碾压",{"key":34,"text":171,"correct":29},"压路机不得在未碾压成型路段上转向、调头、加水或停留","ABE",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":97,"analysis":37},1111753,"圆管涵质量检查项目除混凝土强度、轴线偏差外，还包括（）。",[177,179,181,183,185],{"key":20,"text":178,"correct":29},"涵管长度",{"key":24,"text":180,"correct":22},"涵管厚度与洞顶填土厚度",{"key":27,"text":182,"correct":29},"管座宽度与厚度",{"key":31,"text":184,"correct":29},"相邻管节底面错口",{"key":34,"text":186,"correct":29},"涵底流水面高程",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":52,"analysis":37},1111754,"改善混凝土拌合物流变性能的外加剂主要包括（）。",[191,193,195,197,199],{"key":20,"text":192,"correct":29},"减水剂",{"key":24,"text":194,"correct":22},"缓凝剂",{"key":27,"text":196,"correct":29},"引气剂",{"key":31,"text":198,"correct":22},"速凝剂",{"key":34,"text":200,"correct":29},"泵送剂",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":215,"analysis":37},1111755,"连续梁桥上部结构采用支架现浇施工时，确定支架搭设高度应考虑的因素有()。",[205,207,209,211,213],{"key":20,"text":206,"correct":22},"梁体内模尺寸",{"key":24,"text":208,"correct":29},"梁体设计标高",{"key":27,"text":210,"correct":29},"支架的弹性变形",{"key":31,"text":212,"correct":29},"支架的非弹性变形",{"key":34,"text":214,"correct":29},"基础的允许下沉量","BCDE",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":97,"analysis":37},1111756,"预制拼装连续箱梁桥的预应力钢绞线下料长度，应根据张拉千斤顶长度、张拉伸长值、弹性回缩值以及()计算确定。",[220,222,224,226,228],{"key":20,"text":221,"correct":29},"台座长度",{"key":24,"text":223,"correct":22},"预制梁节段长度",{"key":27,"text":225,"correct":29},"结构的预应力孔道长度",{"key":31,"text":227,"correct":29},"锚夹具厚度",{"key":34,"text":229,"correct":29},"钢绞线外露长度",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":244,"analysis":37},1111757,"按上部结构的行车道位置不同，拱桥可分为()。",[234,236,238,240,242],{"key":20,"text":235,"correct":22},"高架桥",{"key":24,"text":237,"correct":29},"下承式桥",{"key":27,"text":239,"correct":29},"中承式桥",{"key":31,"text":241,"correct":29},"上承式桥",{"key":34,"text":243,"correct":22},"跨线桥","BCD",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":172,"analysis":37},1111758,"关于预应力损失过大的原因的说法，正确的有()。",[249,251,253,255,257],{"key":20,"text":250,"correct":29},"钢绞线松弛率超限",{"key":24,"text":252,"correct":29},"锚具下混凝土局部变形过大",{"key":27,"text":254,"correct":22},"混凝土强度降低",{"key":31,"text":256,"correct":22},"环境湿度偏小",{"key":34,"text":258,"correct":29},"孔道摩阻过大",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":273,"analysis":37},1111759,"下列预应力张拉要求中，错误的有()。",[263,265,267,269,271],{"key":20,"text":264,"correct":29},"有几套张拉设备时，可根据现场情况随机组合使用",{"key":24,"text":266,"correct":22},"进行张拉作业前，必须对千斤顶进行标定",{"key":27,"text":268,"correct":22},"当梁体混凝土强度达到设计规定的张拉强度时，方可进行张拉",{"key":31,"text":270,"correct":29},"预应力张拉以实际伸长量控制为主",{"key":34,"text":272,"correct":22},"预应力钢筋张拉时，应先调整到初应力再开始张拉和量测伸长值","AD",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":36,"analysis":37},1111760,"关于人工挖孔桩施工要求的说法，正确的有()。",[278,280,282,284,286],{"key":20,"text":279,"correct":22},"孔口处护圈应与地面齐平",{"key":24,"text":281,"correct":22},"挖孔桩施工应按桩号顺序依次开挖",{"key":27,"text":283,"correct":29},"施工前应制定安全专项施工方案",{"key":31,"text":285,"correct":22},"井孔内电缆应为防水绝缘电缆，照明电压不应大于36V",{"key":34,"text":287,"correct":29},"挖孔作业时，应经常检查孔内空气情况",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":302,"analysis":37},1111761,"关于普通钢筋焊接施工的说法，正确的有()。",[292,294,296,298,300],{"key":20,"text":293,"correct":29},"接头采用搭接电弧焊时，应使接合钢筋轴线一致",{"key":24,"text":295,"correct":22},"接头搭接双面焊时，两钢筋不得弯折，应直接紧贴焊接",{"key":27,"text":297,"correct":29},"焊接接头应设置在弯矩、剪力较小断面",{"key":31,"text":299,"correct":22},"接头应集中布置在内力较小的同一断面内",{"key":34,"text":301,"correct":22},"单面焊缝的长度不应小于5d(d为钢筋直径)","AC",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":317,"analysis":37},1111762,"桥梁支架施工时需对支架进行设计计算，其计算荷载应主要考虑()。",[307,309,311,313,315],{"key":20,"text":308,"correct":29},"梁体混凝土重量",{"key":24,"text":310,"correct":29},"支架、模板重量",{"key":27,"text":312,"correct":29},"人、料、机及风荷载",{"key":31,"text":314,"correct":29},"保证设施荷载",{"key":34,"text":316,"correct":22},"预压试验荷载","ABCD",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":52,"analysis":37},1111763,"关于明挖扩大基础基坑开挖的说法，正确的有()。",[322,324,326,328,330],{"key":20,"text":323,"correct":29},"当坑壁不稳定时，应设挡板支撑，稳定坑壁",{"key":24,"text":325,"correct":22},"土质较差且有严重流砂现象时，可设集水坑排水",{"key":27,"text":327,"correct":29},"在基坑顶缘四周适当距离处设置截水沟",{"key":31,"text":329,"correct":22},"坑壁边缘的挖掘机作业距坑边缘不少于0.5m",{"key":34,"text":331,"correct":29},"基坑应尽量在少雨季节开挖",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":97,"analysis":37},1111764,"关于预应力桥梁支架施工预拱度设置的说法，正确的有()。",[336,338,340,342,344],{"key":20,"text":337,"correct":29},"预拱度设置一般按二次抛物线设置",{"key":24,"text":339,"correct":22},"预拱度设置不需要考虑张拉影响",{"key":27,"text":341,"correct":29},"预拱度设置要考虑支架变形的影响",{"key":31,"text":343,"correct":29},"预拱度设置要考虑支架地基变形的影响",{"key":34,"text":345,"correct":29},"预拱度设置要考虑汽车荷载的影响",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":52,"analysis":37},1111765,"关于钢筋混凝土梁桥支架施工的说法，正确的有()。",[350,352,354,356,358],{"key":20,"text":351,"correct":29},"支架预拱度设置应考虑地基的非弹性沉陷",{"key":24,"text":353,"correct":22},"支架应根据荷载大小确定是否需要预压",{"key":27,"text":355,"correct":29},"支架预拱度一般按二次抛物线设置",{"key":31,"text":357,"correct":22},"支架荷载除梁体混凝土重量外，再加上施工荷载及风力作用即可",{"key":34,"text":359,"correct":29},"支架预拱度设置时应考虑张拉上拱的影响",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":82,"analysis":37},1111766,"（2019年）为便于支架拆卸，选用落模设备考虑的主要因素有（ ）。",[364,366,368,370,372],{"key":20,"text":365,"correct":22},"施工队伍资质",{"key":24,"text":367,"correct":29},"支架结构形式",{"key":27,"text":369,"correct":29},"需要的卸落量",{"key":31,"text":371,"correct":22},"施工季节",{"key":34,"text":373,"correct":29},"承受的荷载大小",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":97,"analysis":37},1111767,"（2018年）关于挖孔桩基础施工安全控制要求的说法，正确的有（ ）。",[378,380,382,384,386],{"key":20,"text":379,"correct":29},"孔内挖土人员的头顶部位应设置护盖",{"key":24,"text":381,"correct":22},"所有人工挖孔桩必须采用混凝土护壁",{"key":27,"text":383,"correct":29},"起吊设备必须有限位器、防脱钩器等装置",{"key":31,"text":385,"correct":29},"人工挖孔超过10米深，应采用机械通风",{"key":34,"text":387,"correct":29},"相邻两孔中，一孔进行浇筑混凝土作业时，另一孔内不得有人员",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":402,"analysis":37},1111768,"旋挖钻机一般使用的地质层包括（ ）。（2017年真题）",[392,394,396,398,400],{"key":20,"text":393,"correct":29},"粘土层",{"key":24,"text":395,"correct":22},"微风化玄武岩层",{"key":27,"text":397,"correct":22},"微风化花岗岩层",{"key":31,"text":399,"correct":29},"淤泥土层",{"key":34,"text":401,"correct":29},"碎石土层","ADE",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":417,"analysis":37},1111769,"承台混凝土浇筑直接倾卸高度超过2m时，应通过（ ）等设施下落。",[407,409,411,413,415],{"key":20,"text":408,"correct":29},"串筒",{"key":24,"text":410,"correct":22},"滑槽",{"key":27,"text":412,"correct":29},"溜槽",{"key":31,"text":414,"correct":29},"振动溜管",{"key":34,"text":416,"correct":22},"宽口料斗","ACD",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":215,"analysis":37},1111770,"（2020年真题）关于滑升模板浇桥墩混凝土的说法，正确的有（ ）。",[422,424,426,428,430],{"key":20,"text":423,"correct":22},"宜采用高流动度混凝土",{"key":24,"text":425,"correct":29},"浇筑应分层分段进行",{"key":27,"text":427,"correct":29},"应采用插入式振动器振捣",{"key":31,"text":429,"correct":29},"为加快模板提升时间，可掺入一定数量的早强剂",{"key":34,"text":431,"correct":29},"宜采用半干硬性混凝土",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":82,"analysis":37},1111771,"二次衬砌的施作前应满足的条件有()。",[436,438,440,442,444],{"key":20,"text":437,"correct":22},"渗水压力不超过设计值的1.1倍",{"key":24,"text":439,"correct":29},"各测试项目的位移速率明显收敛，围岩基本稳定",{"key":27,"text":441,"correct":29},"已产生的各项位移已达预计总位移量的80%～90%",{"key":31,"text":443,"correct":22},"二次衬砌距开挖面距离较长",{"key":34,"text":445,"correct":29},"周边位移速率或拱顶下沉速率小于规定值",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":52,"analysis":37},1111772,"隧道附属设施有()等。",[450,452,454,456,458],{"key":20,"text":451,"correct":29},"通风照明设施",{"key":24,"text":453,"correct":22},"明洞",{"key":27,"text":455,"correct":29},"安全应急设施",{"key":31,"text":457,"correct":22},"洞门",{"key":34,"text":459,"correct":29},"供配电设施",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":142,"analysis":37},1111773,"隧道洞门的作用有()。",[464,466,468,470,472],{"key":20,"text":465,"correct":29},"保证洞口边坡安全",{"key":24,"text":467,"correct":29},"保证仰坡稳定",{"key":27,"text":469,"correct":29},"引离地表流水",{"key":31,"text":471,"correct":22},"不适宜暗挖时，起取代隧道的作用",{"key":34,"text":473,"correct":29},"作为隧道建筑物的标志，创造景观环境",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":157,"analysis":37},1111775,"按照相互之间的距离，隧道可分为()。",[478,480,482,484,486],{"key":20,"text":479,"correct":22},"长大隧道",{"key":24,"text":481,"correct":29},"连拱隧道",{"key":27,"text":483,"correct":22},"单洞分层隧道",{"key":31,"text":485,"correct":29},"小净距隧道",{"key":34,"text":487,"correct":29},"分离式隧道",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":402,"analysis":37},1111776,"关于桥梁“桥头跳车质量通病”防治措施的说法，正确的有()。",[492,494,496,498,500],{"key":20,"text":493,"correct":29},"路堤施工留有必要的自然固结沉降期",{"key":24,"text":495,"correct":22},"加大台背填土的含水量",{"key":27,"text":497,"correct":22},"桥台基坑采用大型压实机械压实",{"key":31,"text":499,"correct":29},"做好桥头路堤的排水、防水工程",{"key":34,"text":501,"correct":29},"设置桥头搭板",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":317,"analysis":37},1111777,"公路隧道按照长度可划分为()。",[506,508,510,512,514],{"key":20,"text":507,"correct":29},"特长隧道",{"key":24,"text":509,"correct":29},"长隧道",{"key":27,"text":511,"correct":29},"中隧道",{"key":31,"text":513,"correct":29},"短隧道",{"key":34,"text":515,"correct":22},"特短隧道",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":172,"analysis":37},1111778,"隧道施工方法有()。",[520,522,524,526,528],{"key":20,"text":521,"correct":29},"新奥法",{"key":24,"text":523,"correct":29},"盾构法",{"key":27,"text":525,"correct":22},"移动模架法",{"key":31,"text":527,"correct":22},"整体现浇法",{"key":34,"text":529,"correct":29},"传统矿山法",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":544,"analysis":37},1111779,"（2019年）根据《公路隧道设计规范》，分离式独立双洞隧道的最小净距的确定，应考虑的因素有（ ）。",[534,536,538,540,542],{"key":20,"text":535,"correct":22},"隧道的埋深",{"key":24,"text":537,"correct":22},"公路等级",{"key":27,"text":539,"correct":29},"围岩级别",{"key":31,"text":541,"correct":29},"隧道开挖断面的宽度",{"key":34,"text":543,"correct":22},"隧道开挖断面的高度","CD",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":127,"analysis":37},1111780,"按隧道间的距离，隧道分为（ ）。（2017年真题）",[549,550,551,552,554],{"key":20,"text":481,"correct":29},{"key":24,"text":485,"correct":29},{"key":27,"text":487,"correct":29},{"key":31,"text":553,"correct":22},"极小断面隧道",{"key":34,"text":555,"correct":22},"分岔式隧道",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":544,"analysis":37},1111781,"（2020年真题）当隧道围岩较差、跨度大、浅埋、地表沉降需要控制时，适用的开挖方法有（ ）。",[560,562,564,566,568],{"key":20,"text":561,"correct":22},"全断面法",{"key":24,"text":563,"correct":22},"台阶法",{"key":27,"text":565,"correct":29},"中隔壁法（CD法）",{"key":31,"text":567,"correct":29},"交叉中隔壁法（CRD法）",{"key":34,"text":569,"correct":22},"环形开挖预留核心土法",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":402,"analysis":37},1111782,"作为交通安全设施的防撞设施，其主要作用包括()。",[574,576,578,580,582],{"key":20,"text":575,"correct":29},"吸收能量",{"key":24,"text":577,"correct":22},"隔离公路用地",{"key":27,"text":579,"correct":22},"指示道路线形",{"key":31,"text":581,"correct":29},"诱导视线",{"key":34,"text":583,"correct":29},"减轻损伤程度",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":142,"analysis":37},1111783,"下列交通安全设施中，属于交通标志的有()。",[588,590,592,594,596],{"key":20,"text":589,"correct":29},"禁令标志",{"key":24,"text":591,"correct":29},"旅游区标志",{"key":27,"text":593,"correct":29},"里程标",{"key":31,"text":595,"correct":22},"线形诱导标",{"key":34,"text":597,"correct":29},"道路施工安全标志",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":157,"analysis":37},1111784,"（2019年）护栏的主要作用是防止失控车辆越过中央分隔带，或在路侧比较危险的路段冲出路基，不致发生次事故。护栏还具有的作用有（ ）。",[602,604,605,607,609],{"key":20,"text":603,"correct":22},"指示",{"key":24,"text":575,"correct":29},{"key":27,"text":606,"correct":22},"标识公路用地界限",{"key":31,"text":608,"correct":29},"减轻事故车辆及人员的损伤程度",{"key":34,"text":581,"correct":29},{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":82,"analysis":37},1111785,"（2018年）护栏的主要作用有（ ）。",[614,616,618,620,622],{"key":20,"text":615,"correct":22},"将公路用地隔离出来，防止非法侵占公路用地",{"key":24,"text":617,"correct":29},"防止失控车辆冲出路基，不至发生二次事故",{"key":27,"text":619,"correct":29},"吸收能量以减轻事故车辆及人员的损伤程度",{"key":31,"text":621,"correct":22},"警示和缓冲",{"key":34,"text":581,"correct":29},{"id":624,"libraryId":5,"type":15,"typeLabel":16,"stem":625,"options":626,"answer":302,"analysis":37},1111786,"隧道通风控制系统是根据（ ）检测到的环境数据、交通量数据等控制风机的运转进行通风。",[627,629,631,633,635],{"key":20,"text":628,"correct":29},"一氧化碳检测器",{"key":24,"text":630,"correct":22},"噪声监测器",{"key":27,"text":632,"correct":29},"能见度检测器",{"key":31,"text":634,"correct":22},"湿度检测器",{"key":34,"text":636,"correct":22},"温度检测器",{"id":638,"libraryId":5,"type":15,"typeLabel":16,"stem":639,"options":640,"answer":36,"analysis":37},1111787,"（2020年真题）下列交通安全设施中，能起诱导视线作用的有（ ）。",[641,643,645,647,649],{"key":20,"text":642,"correct":22},"轮廓标",{"key":24,"text":644,"correct":22},"隔离栅",{"key":27,"text":646,"correct":29},"护栏",{"key":31,"text":648,"correct":22},"突起路标",{"key":34,"text":650,"correct":29},"防撞筒",{"id":652,"libraryId":5,"type":15,"typeLabel":16,"stem":653,"options":654,"answer":97,"analysis":37},1111788,"沉井下沉施工质量检验的主要内容包括()。",[655,657,659,661,663],{"key":20,"text":656,"correct":29},"平面扭转角",{"key":24,"text":658,"correct":22},"沉井下沉速度",{"key":27,"text":660,"correct":29},"沉井混凝土强度",{"key":31,"text":662,"correct":29},"沉井刃脚底面标高",{"key":34,"text":664,"correct":29},"沉井的最大纵、横向倾斜度",{"id":666,"libraryId":5,"type":15,"typeLabel":16,"stem":667,"options":668,"answer":112,"analysis":37},1111789,"石灰稳定碎石基层质量检验应实测()。",[669,671,673,675,677],{"key":20,"text":670,"correct":29},"横坡度",{"key":24,"text":672,"correct":29},"平整度",{"key":27,"text":674,"correct":22},"渗水系数",{"key":31,"text":676,"correct":29},"厚度",{"key":34,"text":678,"correct":22},"中线平面偏位",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":273,"analysis":37},1111790,"根据《公路工程质量检验评定标准》JTGF80\u002F1-2004，沥青混凝土面层的质量检验实测项目中，属于关键项目的有()。",[683,684,685,687,689],{"key":20,"text":676,"correct":29},{"key":24,"text":672,"correct":22},{"key":27,"text":686,"correct":22},"弯沉值",{"key":31,"text":688,"correct":29},"压实度",{"key":34,"text":678,"correct":22},{"id":691,"libraryId":5,"type":15,"typeLabel":16,"stem":692,"options":693,"answer":317,"analysis":37},1111791,"根据《公路工程质量检验评定标准》，属于石方路基实测项目的是()。",[694,696,698,699],{"key":20,"text":695,"correct":29},"中线偏位",{"key":24,"text":697,"correct":29},"边坡平顺度",{"key":27,"text":686,"correct":29},{"key":31,"text":672,"correct":29},{"id":701,"libraryId":5,"type":15,"typeLabel":16,"stem":702,"options":703,"answer":417,"analysis":37},1111792,"公路工程质量评定时，互通式立交单位工程主要包含的分部工程有()。",[704,706,708,710,712],{"key":20,"text":705,"correct":29},"桥梁工程（每座）",{"key":24,"text":707,"correct":22},"防护工程",{"key":27,"text":709,"correct":29},"匝道工程（每条）",{"key":31,"text":711,"correct":29},"主线路基路面工程（1～3km路段）",{"key":34,"text":713,"correct":22},"绿化工程（1～3km路段或每处）",{"id":715,"libraryId":5,"type":15,"typeLabel":16,"stem":716,"options":717,"answer":317,"analysis":37},1111793,"沥青混凝土路面施工质量控制关键点有（）。",[718,720,722,724,726],{"key":20,"text":719,"correct":29},"沥青材料检查与试验",{"key":24,"text":721,"correct":29},"沥青混凝土配合比设计和试验",{"key":27,"text":723,"correct":29},"沥青混凝土的拌和、运输及摊铺温度控制",{"key":31,"text":725,"correct":29},"沥青混凝土施工机械设备配置与压实方案",{"key":34,"text":727,"correct":22},"沥青混凝土摊铺厚度及水灰比的控制",[729,733,736,739,742,745],{"id":730,"name":731,"category":7,"favorite":732},1,"领导干部任职前廉政法规知识测试题",92,{"id":734,"name":735,"category":7,"favorite":730},595,"建筑结构与设备",{"id":737,"name":738,"category":7,"favorite":730},715,"招标采购专业知识与法律法规",{"id":740,"name":741,"category":7,"favorite":730},848,"市政方向-通用基础",{"id":743,"name":744,"category":7,"favorite":8},534,"BIM工程师",{"id":746,"name":744,"category":7,"favorite":8},535]