[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":729},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,31,50,1644,[13,38,53,68,82,96,111,125,140,154,168,183,198,212,227,242,256,270,284,299,314,328,342,357,371,386,401,414,428,442,456,470,484,495,510,525,536,550,564,574,588,602,616,631,645,659,672,686,701,715],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1111693,2,"多选题","根据交通部《公路工程施工分包管理办法》规定，下列专业分包的说法中错误的有（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","分包单位由业主（发包人）或监理人选择",true,{"key":24,"text":25,"correct":26},"B","分包合同须事先征得监理人的审批",false,{"key":28,"text":29,"correct":22},"C","承包人可以在中标后的合同履行期间提出专业分包的申请",{"key":31,"text":32,"correct":22},"D","若因非分包人原因造成分包人的损失，分包人有权向监理人提出索赔要求",{"key":34,"text":35,"correct":22},"E","分包人的违约行为承包人可以不需向发分包人承担责任","ACDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1111694,"竣工验收应听取的报告有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"项目执行报告",{"key":24,"text":45,"correct":22},"施工总结报告",{"key":28,"text":47,"correct":22},"监理工作报告",{"key":31,"text":49,"correct":22},"质量监督部门关于质量监督工作的报告",{"key":34,"text":51,"correct":26},"供货单位关于供货情况的报告","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1111695,"公路工程交工验收必须具备的条件有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"合同约定的各项内容已完成，.各方就合同变更的内容达成书面一致意见",{"key":24,"text":60,"correct":22},"监理工程师对工程质量的评定合格",{"key":28,"text":62,"correct":26},"按规定已编制好工程竣工决算",{"key":31,"text":64,"correct":22},"竣工文件按公路工程档案管理的有关要求，完成公路工程项目文件归档范围第三，四，五部分（不含缺陷责任期资料内容）的搜集整理及归档工作",{"key":34,"text":66,"correct":22},"施工单位按《公路工程质量检验评定标准》及相关规定的要求对工程质量自检合格","ABDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":81,"analysis":37},1111696,"交工验收应具备的条件有（ ）。",[72,73,75,77,79],{"key":20,"text":60,"correct":22},{"key":24,"text":74,"correct":22},"施工单位、监理单位已完成本合同段的工作总结",{"key":28,"text":76,"correct":22},"质量监督机构按交通部规定的公路工程质量鉴定办法对工程质量进行检测",{"key":31,"text":78,"correct":26},"通车试运营2年后",{"key":34,"text":80,"correct":22},"竣工文件已按交通部规定的内容编制完成","ABCE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":81,"analysis":37},1111697,"公路工程竣工验收必须具备的条件有（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"通车试运营2年以上",{"key":24,"text":89,"correct":22},"竣工文件已完成公路工程项目文件归档范围的全部内容",{"key":28,"text":91,"correct":22},"工程决算编制完成，竣工决算已经审计，并经交通主管部门或其授权单位认定",{"key":31,"text":93,"correct":26},"施工单位机械设备全部退场",{"key":34,"text":95,"correct":22},"各参建单位工作总结报告",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":110,"analysis":37},1111698,"公路工程建设项目验收分为（ ）。",[100,102,104,106,108],{"key":20,"text":101,"correct":26},"中间交工验收",{"key":24,"text":103,"correct":22},"交工验收",{"key":28,"text":105,"correct":26},"工序验收",{"key":31,"text":107,"correct":22},"竣工验收",{"key":34,"text":109,"correct":26},"开工验收","BD",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":52,"analysis":37},1111699,"公路工程验收的依据包括（ ）。",[115,117,119,121,123],{"key":20,"text":116,"correct":22},"批准的工程设计、概算、预算文件",{"key":24,"text":118,"correct":22},"批准的变更设计文件和图纸",{"key":28,"text":120,"correct":22},"批准或确认的招标文件及合同文本",{"key":31,"text":122,"correct":22},"上级机关对工程的指示文件",{"key":34,"text":124,"correct":26},"公路工程的可行性研究报告",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":139,"analysis":37},1111700,"公路设计变更分为（ ）。",[129,131,133,135,137],{"key":20,"text":130,"correct":22},"重大设计变更",{"key":24,"text":132,"correct":22},"较大设计变更",{"key":28,"text":134,"correct":22},"一般设计变更",{"key":31,"text":136,"correct":26},"特大设计变更",{"key":34,"text":138,"correct":26},"专项设计变更","ABC",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":81,"analysis":37},1111701,"关于公路施工企业信用评价等级的说法正确的有（ ）。 A.公路施工企业信用评价等级分为A A、 A、 B、",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"D五个等级",{"key":24,"text":147,"correct":22},"D级为最低信用等级",{"key":28,"text":149,"correct":22},"AA级为信用好",{"key":31,"text":151,"correct":26},"A级为信用好",{"key":34,"text":153,"correct":22},"C级为信用较差",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":81,"analysis":37},1111702,"公路工程竣工验收的主要工作内容包括（）",[158,160,162,164,166],{"key":20,"text":159,"correct":22},"成立竣工验收委员会",{"key":24,"text":161,"correct":22},"听取质量监督机构的工作报告及工程质量鉴定报告",{"key":28,"text":163,"correct":22},"检查工程实体质量、审查有关资料",{"key":31,"text":165,"correct":26},"检查施工自检报告、施工总结报告及施工资料",{"key":34,"text":167,"correct":22},"听取公路工程项目执行报告，涉及工作报告，施工总结报告，监理工作报告，及接管养护单位项目使用情况报告。",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":182,"analysis":37},1111703,"下列叙述行为属于工程转包的有（ ）。",[172,174,176,178,180],{"key":20,"text":173,"correct":22},"承包人将承包的全部工程发包给他人的",{"key":24,"text":175,"correct":26},"承包人将工程分包给不具备相应资格的企业或者个人的",{"key":28,"text":177,"correct":26},"分包人以他人名义承揽分包工程的",{"key":31,"text":179,"correct":26},"承包人将合同文件中明确不得分包的专项工程进行分包的",{"key":34,"text":181,"correct":22},"承包人将承包的全部工程肢解后以分包的名义分别发包给他人的","AE",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":197,"analysis":37},1111704,"施工单位应当取得安全生产许可证，以下()必须取得安全考核合格证书，方可参加公路水运工程投标及施工。",[187,189,191,193,195],{"key":20,"text":188,"correct":22},"单位负责人",{"key":24,"text":190,"correct":26},"包工头",{"key":28,"text":192,"correct":22},"项目负责人",{"key":31,"text":194,"correct":26},"技术总管",{"key":34,"text":196,"correct":22},"专项安全生产管理人员","ACE",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":52,"analysis":37},1111705,"《公路水运工程安全生产监督管理办法》规定施工单位在采用（ ）时，应当对作业人员进行相应的安全生产教育培训。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"新技术",{"key":24,"text":205,"correct":22},"新工艺",{"key":28,"text":207,"correct":22},"新设备",{"key":31,"text":209,"correct":22},"新材料",{"key":34,"text":211,"correct":26},"新工具",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":226,"analysis":37},1111706,"依照《建设工程质量管理条例》规定给予单位罚款处罚的，对( )处单位罚款数额5%以上、10%以下的罚款。",[216,218,220,222,224],{"key":20,"text":217,"correct":22},"单位直接负责的主管人员",{"key":24,"text":219,"correct":26},"监理工程师",{"key":28,"text":221,"correct":22},"其他直接责任人员",{"key":31,"text":223,"correct":26},"质监机构负责人",{"key":34,"text":225,"correct":26},"项目法人","AC",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":241,"analysis":37},1111707,"下列属于公路工程一般质量事故的是( )。",[231,233,235,237,239],{"key":20,"text":232,"correct":26},"质量较差",{"key":24,"text":234,"correct":26},"造成直接经济损失（包括修复费用）在20万元以下",{"key":28,"text":236,"correct":22},"直接经济损失120 万",{"key":31,"text":238,"correct":22},"高速公路以外的公路项目中桥或大桥主体结构垮塌",{"key":34,"text":240,"correct":26},"造成2人死亡的","CD",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":36,"analysis":37},1111708,"公路工程质量事故分为()。",[246,248,250,252,254],{"key":20,"text":247,"correct":22},"较大质量事故",{"key":24,"text":249,"correct":26},"质量缺陷",{"key":28,"text":251,"correct":22},"一般质量事故",{"key":31,"text":253,"correct":22},"特别重大质量事故",{"key":34,"text":255,"correct":22},"重大质量事故",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":81,"analysis":37},1111709,"建设单位应当按照国家规定向交通运输主管部门或者其委托的建设工程质量监督机构提交以下( )材料，办理工程质量监督手续",[260,262,264,266,268],{"key":20,"text":261,"correct":22},"建设单位现场管理机构、人员、质量保证体系等文件",{"key":24,"text":263,"correct":22},"施工、监理合同及招投标文件",{"key":28,"text":265,"correct":22},"交通运输主管部门批复的施工图设计文件",{"key":31,"text":267,"correct":26},"公路行政主管单位的审批文件",{"key":34,"text":269,"correct":22},"公路水运工程质量监督管理登记表",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":67,"analysis":37},1111710,"下列所列公路工程，可以由二级注册建造师（公路工程）担任其项目负责人的是( )。",[274,276,278,280,282],{"key":20,"text":275,"correct":22},"桥梁工程，30m≤桥长＜1000m",{"key":24,"text":277,"correct":22},"隧道工程，0m≤长度＜1000m",{"key":28,"text":279,"correct":26},"单项合同额，>3000万元",{"key":31,"text":281,"correct":22},"单项合同额，500～3000万元",{"key":34,"text":283,"correct":22},"桥梁工程，13m≤单跨＜50m",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":298,"analysis":37},1111711,"路基边坡封面防护的形式有()。",[288,290,292,294,296],{"key":20,"text":289,"correct":26},"铺草",{"key":24,"text":291,"correct":22},"捶面",{"key":28,"text":293,"correct":22},"抹面",{"key":31,"text":295,"correct":22},"喷浆",{"key":34,"text":297,"correct":22},"喷射混凝土","BCDE",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":313,"analysis":37},1111712,"冲刷防护中的间接防护包括（ ）。（2017年真题）",[303,305,307,309,311],{"key":20,"text":304,"correct":22},"丁坝",{"key":24,"text":306,"correct":22},"防洪堤",{"key":28,"text":308,"correct":26},"抛石",{"key":31,"text":310,"correct":26},"石笼",{"key":34,"text":312,"correct":22},"顺坝","ABE",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":139,"analysis":37},1111713,"（2020年真题）柱板式锚杆挡土墙的组成包括（ ）。",[318,320,322,324,326],{"key":20,"text":319,"correct":22},"挡土板",{"key":24,"text":321,"correct":22},"肋柱",{"key":28,"text":323,"correct":22},"锚杆",{"key":31,"text":325,"correct":26},"壁面板",{"key":34,"text":327,"correct":26},"沉降缝",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":298,"analysis":37},1111714,"关于GPS测量技术正确的说法有()。",[332,334,336,338,340],{"key":20,"text":333,"correct":26},"GPS测量过程中，相邻两测点必须通视",{"key":24,"text":335,"correct":22},"GPS测量技术可以用于公路中桩平面放样",{"key":28,"text":337,"correct":22},"静态GPS测量采用相位差分可达到厘米级甚至毫米级精度",{"key":31,"text":339,"correct":22},"GPS是全球定位系统的简称",{"key":34,"text":341,"correct":22},"GPS测量网的基本形式有三角形网、环形网和星形网3种",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":356,"analysis":37},1111715,"路基压实度的现场测定方法有()。",[346,348,350,352,354],{"key":20,"text":347,"correct":26},"重型击实法",{"key":24,"text":349,"correct":22},"灌砂法",{"key":28,"text":351,"correct":26},"表面振动压实仪法",{"key":31,"text":353,"correct":22},"环刀法",{"key":34,"text":355,"correct":22},"核子密度湿度仪法","BDE",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":67,"analysis":37},1111716,"产生路基边坡滑坡病害的原因有()。",[361,363,365,367,369],{"key":20,"text":362,"correct":22},"换填土时清淤不彻底",{"key":24,"text":364,"correct":22},"填土层有效宽度不够，边坡二期贴补",{"key":28,"text":366,"correct":26},"纵坡过大路段采用了纵向水平分层填筑",{"key":31,"text":368,"correct":22},"未处理好填挖交界面",{"key":34,"text":370,"correct":22},"路基顶面排水不畅",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":385,"analysis":37},1111717,"对产生“弹簧土”的路基进行有效治理的措施有()。",[375,377,379,381,383],{"key":20,"text":376,"correct":26},"增大碾压机械吨位",{"key":24,"text":378,"correct":26},"增加碾压遍数",{"key":28,"text":380,"correct":22},"对过湿土翻晒",{"key":31,"text":382,"correct":22},"掺适量生石灰粉翻拌",{"key":34,"text":384,"correct":22},"换填含水量适宜的良性土","CDE",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":400,"analysis":37},1111718,"路基边缘压实不足的预防措施有()。",[390,392,394,396,398],{"key":20,"text":391,"correct":22},"超宽填筑",{"key":24,"text":393,"correct":22},"增加路基边缘带压实遍数",{"key":28,"text":395,"correct":26},"放缓填筑边坡横坡度",{"key":31,"text":397,"correct":22},"确保段落搭接超压长度",{"key":34,"text":399,"correct":26},"路基边缘填料选用高塑性指数的黏土","ABD",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":81,"analysis":37},1111719,"引起路基边坡病害的主要原因是（）。",[405,407,409,410,412],{"key":20,"text":406,"correct":22},"边坡二期贴补",{"key":24,"text":408,"correct":22},"路基基地存在软土且厚度不均",{"key":28,"text":368,"correct":22},{"key":31,"text":411,"correct":26},"纵坡大运12%的路段采用纵向水平分层法填筑施工",{"key":34,"text":413,"correct":22},"路基处于陡峭的斜坡上",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":67,"analysis":37},1111720,"排除滑坡体地下水的设施有()。",[418,420,422,424,426],{"key":20,"text":419,"correct":22},"支撑渗沟",{"key":24,"text":421,"correct":22},"边坡渗沟",{"key":28,"text":423,"correct":26},"树枝状排水沟",{"key":31,"text":425,"correct":22},"平孔",{"key":34,"text":427,"correct":22},"暗沟",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":182,"analysis":37},1111721,"（2019年）处理软土地基的加固土桩有（ ）。",[432,434,436,438,440],{"key":20,"text":433,"correct":22},"粉喷桩",{"key":24,"text":435,"correct":26},"水泥粉煤灰碎石桩",{"key":28,"text":437,"correct":26},"二灰碎石桩",{"key":31,"text":439,"correct":26},"钻孔灌注桩",{"key":34,"text":441,"correct":22},"浆喷桩",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":81,"analysis":37},1111722,"位于稻田、湖塘地段的路堤，其地基表层处理措施有()。",[446,448,450,452,454],{"key":20,"text":447,"correct":22},"换填",{"key":24,"text":449,"correct":22},"加筋",{"key":28,"text":451,"correct":22},"晾晒",{"key":31,"text":453,"correct":26},"熔烧",{"key":34,"text":455,"correct":22},"外掺无机结合料",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":81,"analysis":37},1111723,"通过修筑填石路堤试验路段来确定的施工参数有（ ）。",[460,462,464,466,468],{"key":20,"text":461,"correct":22},"松铺厚度",{"key":24,"text":463,"correct":22},"沉降差",{"key":28,"text":465,"correct":22},"压实速度",{"key":31,"text":467,"correct":26},"最佳含水量",{"key":34,"text":469,"correct":22},"压实机械型号及组合",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":241,"analysis":37},1111724,"综合爆破中的洞室炮主要包括（）。",[474,476,478,480,482],{"key":20,"text":475,"correct":26},"钢钎炮",{"key":24,"text":477,"correct":26},"深孔爆破",{"key":28,"text":479,"correct":22},"药壶炮",{"key":31,"text":481,"correct":22},"猫洞炮",{"key":34,"text":483,"correct":26},"小炮",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":81,"analysis":37},1111725,"填石路堤施工前，应通过修筑试验路段确定的参数有()。",[488,489,490,492,494],{"key":20,"text":461,"correct":22},{"key":24,"text":469,"correct":22},{"key":28,"text":491,"correct":22},"压实速度及压实遍数",{"key":31,"text":493,"correct":26},"压实度",{"key":34,"text":463,"correct":22},{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":509,"analysis":37},1111726,"关于采用不同性质的填料填筑路堤的正确要求有()。",[499,501,503,505,507],{"key":20,"text":500,"correct":22},"应水平分层、分段填筑，分层压实",{"key":24,"text":502,"correct":26},"应将不同性质的填料进行拌和，在同水平层路基全宽范围混合填筑",{"key":28,"text":504,"correct":26},"每种填料的松铺厚度应该一致",{"key":31,"text":506,"correct":22},"不得在透水性较好的填料所填筑的路堤边坡上覆盖透水性不好的填料",{"key":34,"text":508,"correct":22},"强度较小的填料层应填筑在强度较大的填料层的下面","ADE",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":524,"analysis":37},1111727,"可安排在雨期施工路基的地段有()。",[514,516,518,520,522],{"key":20,"text":515,"correct":26},"重粘土地段",{"key":24,"text":517,"correct":22},"岩石地段",{"key":28,"text":519,"correct":22},"砂类土地段",{"key":31,"text":521,"correct":26},"膨胀土地段",{"key":34,"text":523,"correct":26},"盐渍土地段","BC",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":400,"analysis":37},1111728,"填石路堤施工前，通过修筑试验路段来确定的路堤施工参数有()。",[529,530,531,533,534],{"key":20,"text":461,"correct":22},{"key":24,"text":469,"correct":22},{"key":28,"text":532,"correct":26},"整平机械型号及整平速度",{"key":31,"text":491,"correct":22},{"key":34,"text":535,"correct":26},"孔隙率",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":52,"analysis":37},1111729,"关于填石路基填筑要求的说法，正确的有()。",[540,542,544,546,548],{"key":20,"text":541,"correct":22},"路堤施工前，应先修筑试验路段",{"key":24,"text":543,"correct":22},"边坡码砌与路基填筑宜同步进行",{"key":28,"text":545,"correct":22},"岩性相差较大的填料应分层或分段填筑",{"key":31,"text":547,"correct":22},"二级及二级以上公路的填石路堤应分层填筑压实",{"key":34,"text":549,"correct":26},"宜选用自重不小于18t的光轮压路机",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":509,"analysis":37},1111730,"土方路堤填筑时，要求压实度必须大于或等于96%的有()。",[554,556,558,560,562],{"key":20,"text":555,"correct":22},"高速公路的上路床",{"key":24,"text":557,"correct":26},"高速公路的上路堤",{"key":28,"text":559,"correct":26},"二级公路的上路床",{"key":31,"text":561,"correct":22},"高速公路的下路床",{"key":34,"text":563,"correct":22},"高速公路的零填路基",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":573,"analysis":37},1111731,"在土质路基填筑施工中，不同透水性质材料正确的组合方案有（）",[568,569,570,571,572],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"key":34,"text":34,"correct":26},"ACD",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":226,"analysis":37},1111732,"公路路基填料选择时，须取土试验以确定填料的()。",[578,580,582,584,586],{"key":20,"text":579,"correct":22},"最小强度CBR值",{"key":24,"text":581,"correct":26},"细度模数",{"key":28,"text":583,"correct":22},"最大粒径",{"key":31,"text":585,"correct":26},"级配",{"key":34,"text":587,"correct":26},"回弹模量",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":52,"analysis":37},1111733,"路基路面的排水设施主要有()等几种。",[592,594,596,598,600],{"key":20,"text":593,"correct":22},"边沟",{"key":24,"text":595,"correct":22},"排水沟",{"key":28,"text":597,"correct":22},"截水沟",{"key":31,"text":599,"correct":22},"急流槽",{"key":34,"text":601,"correct":26},"检查井",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":36,"analysis":37},1111734,"关于路基冬期施工的说法，正确的有（ ）。（2017年真题）",[606,608,610,612,614],{"key":20,"text":607,"correct":22},"半填半挖地段、挖填方交界处不得在冬期施工",{"key":24,"text":609,"correct":26},"动气填筑路堤，应按横截面全宽平填，每层松铺厚度应比正常施工增加20%~30%",{"key":28,"text":611,"correct":22},"当填筑至路床底面1M时，碾压密实后应停止填筑，在顶面覆盖防冻保温层",{"key":31,"text":613,"correct":22},"冬期过后必须对填方路堤进行补充压实",{"key":34,"text":615,"correct":22},"河滩地段可利用动气水位低，开挖基坑修建防护工程",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":630,"analysis":37},1111735,"（2020年真题）石质路堑施工采用微差爆破方法的优点有（ ）。",[620,622,624,626,628],{"key":20,"text":621,"correct":26},"使爆破面形成一个光滑平整的坡面",{"key":24,"text":623,"correct":22},"可减震1\u002F3～2\u002F3",{"key":28,"text":625,"correct":22},"加强了岩石破碎效果",{"key":31,"text":627,"correct":22},"可节省炸药",{"key":34,"text":629,"correct":26},"一次可形成数百米路基","BCD",{"id":632,"libraryId":5,"type":15,"typeLabel":16,"stem":633,"options":634,"answer":400,"analysis":37},1111736,"路面表面防排水设施由（）等组成。",[635,637,639,641,643],{"key":20,"text":636,"correct":22},"路拱横坡",{"key":24,"text":638,"correct":22},"路肩横坡",{"key":28,"text":640,"correct":26},"垫层",{"key":31,"text":642,"correct":22},"拦水带",{"key":34,"text":644,"correct":26},"渗沟",{"id":646,"libraryId":5,"type":15,"typeLabel":16,"stem":647,"options":648,"answer":400,"analysis":37},1111737,"关于SMA路面施工温度控制的说法，正确的有()。",[649,651,653,655,657],{"key":20,"text":650,"correct":22},"SMA拌和、摊铺温度均较常规沥青混凝土路面施工温度更高",{"key":24,"text":652,"correct":22},"SMA路面不得在天气温度低于10℃的气候条件下施工",{"key":28,"text":654,"correct":26},"SMA碾压温度较常规沥青混凝土路面施工温度更低",{"key":31,"text":656,"correct":22},"改性沥青SMA路面摊铺温度较不改性沥青SMA路面摊铺温度更高",{"key":34,"text":658,"correct":26},"只要控制好摊铺温度，SMA路面可以在雨天施工",{"id":660,"libraryId":5,"type":15,"typeLabel":16,"stem":661,"options":662,"answer":182,"analysis":37},1111738,"马歇尔试验可测定沥青混合料的指标有()。",[663,665,667,668,670],{"key":20,"text":664,"correct":22},"稳定度",{"key":24,"text":666,"correct":26},"针入度",{"key":28,"text":493,"correct":26},{"key":31,"text":669,"correct":26},"延度",{"key":34,"text":671,"correct":22},"流值",{"id":673,"libraryId":5,"type":15,"typeLabel":16,"stem":674,"options":675,"answer":630,"analysis":37},1111739,"为防止水泥稳定碎石基层裂缝病害，可采取的预防措施有()。",[676,678,680,682,684],{"key":20,"text":677,"correct":26},"在保证强度的情况下，适当增加水泥稳定碎石混合料的水泥用量",{"key":24,"text":679,"correct":22},"碎石级配应接近要求级配范围的中值",{"key":28,"text":681,"correct":22},"严格控制集料中粘土含量",{"key":31,"text":683,"correct":22},"养护结束后应及时铺筑下封层",{"key":34,"text":685,"correct":26},"宜在气温较低的季节组织施工",{"id":687,"libraryId":5,"type":15,"typeLabel":16,"stem":688,"options":689,"answer":700,"analysis":37},1111740,"水泥混凝土路面产生横向裂缝的原因有()。",[690,692,694,696,698],{"key":20,"text":691,"correct":26},"切缝深度过深",{"key":24,"text":693,"correct":22},"切缝不及时",{"key":28,"text":695,"correct":22},"养护不及时",{"key":31,"text":697,"correct":26},"旧路拓宽处发生沉陷",{"key":34,"text":699,"correct":22},"混凝土配合比不合理，水灰比偏大","BCE",{"id":702,"libraryId":5,"type":15,"typeLabel":16,"stem":703,"options":704,"answer":81,"analysis":37},1111741,"对石灰稳定土底基层裂缝病害防治有利的做法是（）。",[705,707,709,711,713],{"key":20,"text":706,"correct":22},"石灰土成型后及时洒水养生",{"key":24,"text":708,"correct":22},"控制压实含水量在最佳含水量±1%范围之内",{"key":28,"text":710,"correct":22},"在土中掺入适量的砂性土，降低土的塑性指数",{"key":31,"text":712,"correct":26},"安排在温差较大的冬季进行施工",{"key":34,"text":714,"correct":22},"加强石灰剂量控制，保证拌合均匀",{"id":716,"libraryId":5,"type":15,"typeLabel":16,"stem":717,"options":718,"answer":110,"analysis":37},1111742,"可能造成水泥稳定碎石基层产生裂缝的原因有()。",[719,721,723,725,727],{"key":20,"text":720,"correct":26},"在保证强度的情况下，尽量降低水泥稳定碎石混合料的水泥用量",{"key":24,"text":722,"correct":22},"碾压时混合料含水量偏大，不均匀",{"key":28,"text":724,"correct":26},"混合料碾压成型后及时洒水养护",{"key":31,"text":726,"correct":22},"增加碎石级配中细粉料的含量",{"key":34,"text":728,"correct":26},"混合料碾压成型后马上铺筑封层",[730,734,737,740,743,746],{"id":731,"name":732,"category":7,"favorite":733},1,"领导干部任职前廉政法规知识测试题",92,{"id":735,"name":736,"category":7,"favorite":731},595,"建筑结构与设备",{"id":738,"name":739,"category":7,"favorite":731},715,"招标采购专业知识与法律法规",{"id":741,"name":742,"category":7,"favorite":731},848,"市政方向-通用基础",{"id":744,"name":745,"category":7,"favorite":8},534,"BIM工程师",{"id":747,"name":745,"category":7,"favorite":8},535]