[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-30":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":730},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,30,50,1644,[13,38,53,68,82,97,111,126,141,156,170,184,198,212,226,241,255,270,285,300,315,329,343,357,372,387,401,415,429,444,458,472,487,501,513,527,542,555,569,583,598,612,626,639,653,667,676,688,702,716],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1111642,2,"多选题","公路水运工程安全生产监督管理应当检查的安全生产方针是（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","统一监督",false,{"key":24,"text":25,"correct":26},"B","安全笫一",true,{"key":28,"text":29,"correct":26},"C","预防为主",{"key":31,"text":32,"correct":22},"D","分级管理",{"key":34,"text":35,"correct":26},"E","综合治理","BCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1111643,"建立完整的合同管理制度包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"合同审查批准制度",{"key":24,"text":45,"correct":26},"合同档案管理制度",{"key":28,"text":47,"correct":26},"合同管理绩效考核制度",{"key":31,"text":49,"correct":22},"合同管理的公证制度",{"key":34,"text":51,"correct":26},"印鉴及证书管理使用制度","ABCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1111644,"除专用合同条款另有约定外，因变更引起的价格调整约定有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"如果取消某项工作，则该项工作的总额价不予支付",{"key":24,"text":60,"correct":26},"已标价工程量清单中有适用于变更工作的子目的，采用该子目的单价",{"key":28,"text":62,"correct":26},"已标价工程量清单中无适用于变更工作的子目、但有类似子目的，可在合理范围内参照类似子目的单价，由监理工程师按合同约定商定或确定变更工作的单价",{"key":31,"text":64,"correct":26},"已标价工程量清单中无适用或类似子目的单价，可在综合考虑承包人在投标时所提供的单价分析表的基础上，由监理人按合同约定商定或确定变更工作的单价",{"key":34,"text":66,"correct":22},"如果本工程的变更指示是因双方过错或双方责任造成的，则发包人只承担50%这种引起的任何额外费用","ABCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":52,"analysis":37},1111645,"引起承包人索赔的众多因素中，比较普遍的因素有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"赶工",{"key":24,"text":75,"correct":26},"开工受阻",{"key":28,"text":77,"correct":26},"气候影响",{"key":31,"text":79,"correct":22},"施工机械故障停工",{"key":34,"text":81,"correct":26},"工程量的增加",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1111646,"有关合同文件优先级的描述中正确的有（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"合同协议书及各种合同附件的优先级最高",{"key":24,"text":89,"correct":22},"公路工程专用合同条款的优先级高于项目专用合同条款",{"key":28,"text":91,"correct":22},"中标通知书的优先级高于合同协议书和通用合同条款",{"key":31,"text":93,"correct":26},"通用合同条款的优先级高于图纸和已标价工程量清单",{"key":34,"text":95,"correct":26},"技术规范优先级高于图纸和已标价工程量清单","ADE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":52,"analysis":37},1111647,"公路工程变更包括（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"设计变更",{"key":24,"text":104,"correct":26},"进度计划变更",{"key":28,"text":106,"correct":26},"施工条件变更",{"key":31,"text":108,"correct":22},"工程质量变更",{"key":34,"text":110,"correct":26},"原招标文件和工程量清单中未包括的“新增工程”",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},1111648,"工期延误按索赔结果分为（ ）延误。",[115,117,119,121,123],{"key":20,"text":116,"correct":26},"可原谅可补偿",{"key":24,"text":118,"correct":26},"可原谅不可补偿",{"key":28,"text":120,"correct":26},"不可原谅",{"key":31,"text":122,"correct":22},"关键性",{"key":34,"text":124,"correct":22},"非关键性","ABC",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1111649,"标后预算按照不同的管理阶段分为（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"项目估算（直接）成本",{"key":24,"text":133,"correct":26},"项目预算（直接）成本",{"key":28,"text":135,"correct":26},"计划预算（直接）成本",{"key":31,"text":137,"correct":26},"实际预算（直接）成本",{"key":34,"text":139,"correct":22},"实际决算（直接）成本","BCD",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},1111650,"成本目标通常以（ ）来定量地表示。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"控制项目总成本额",{"key":24,"text":148,"correct":22},"控制项目的人工消耗率",{"key":28,"text":150,"correct":26},"项目成本总降低额",{"key":31,"text":152,"correct":22},"控制项目的材料节约率",{"key":34,"text":154,"correct":26},"项目成本总降低率","CE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":67,"analysis":37},1111651,"自有机械可变费用包括（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":26},"燃、油料费",{"key":24,"text":163,"correct":26},"机驾人员工资",{"key":28,"text":165,"correct":26},"电费",{"key":31,"text":167,"correct":26},"养路费及车船使用税",{"key":34,"text":169,"correct":22},"折旧费",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":67,"analysis":37},1111652,"施工成本核算的内容有（ ）。",[174,176,178,180,182],{"key":20,"text":175,"correct":26},"人工费核算",{"key":24,"text":177,"correct":26},"材料费核算",{"key":28,"text":179,"correct":26},"机械使用费核算",{"key":31,"text":181,"correct":26},"措施费用核算",{"key":34,"text":183,"correct":22},"规费核算",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":67,"analysis":37},1111653,"公路工程项目施工成本管理的内容有（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":26},"成本预测",{"key":24,"text":191,"correct":26},"成本计划编制",{"key":28,"text":193,"correct":26},"成本控制",{"key":31,"text":195,"correct":26},"成本核算",{"key":34,"text":197,"correct":22},"成本总结",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":52,"analysis":37},1111654,"在公路项目施工中，控制材料成本的方法有（ ）。",[202,204,206,208,210],{"key":20,"text":203,"correct":26},"以预算价格来控制材料的采购成本",{"key":24,"text":205,"correct":26},"编制材料需要量计划和建立材料消耗台账",{"key":28,"text":207,"correct":26},"控制工序施工质量争取一次合格",{"key":31,"text":209,"correct":22},"提高水泥钢筋等主要材料的回收再利用率",{"key":34,"text":211,"correct":26},"实行限额领料控制材料领用数量",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":125,"analysis":37},1111656,"公路项目工程量清单单价应包括的费用有（ ）。",[216,218,220,222,224],{"key":20,"text":217,"correct":26},"人工费",{"key":24,"text":219,"correct":26},"管理费",{"key":28,"text":221,"correct":26},"利润",{"key":31,"text":223,"correct":22},"暂定金额",{"key":34,"text":225,"correct":22},"计日工",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":240,"analysis":37},1111657,"计日工是指在工程实施过程中，业主有一些临时性的或新增加的项目需要按计日（或计量）使用人工和（ ）所需的费用。",[230,232,234,236,238],{"key":20,"text":231,"correct":26},"材料",{"key":24,"text":233,"correct":22},"延长工期",{"key":28,"text":235,"correct":22},"风险",{"key":31,"text":237,"correct":22},"资金周转",{"key":34,"text":239,"correct":26},"施工机械","AE",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":52,"analysis":37},1111658,"按时间分类，支付可分为（ ）。",[245,247,249,251,253],{"key":20,"text":246,"correct":26},"预先支付",{"key":24,"text":248,"correct":26},"期中支付",{"key":28,"text":250,"correct":26},"交工结算",{"key":31,"text":252,"correct":22},"竣工支付",{"key":34,"text":254,"correct":26},"最终结清",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":269,"analysis":37},1111659,"按支付内容分类，支付可分为（ ）。",[259,261,263,265,267],{"key":20,"text":260,"correct":22},"进度款支付",{"key":24,"text":262,"correct":26},"基本支付",{"key":28,"text":264,"correct":26},"附加支付",{"key":31,"text":266,"correct":22},"材料款支付",{"key":34,"text":268,"correct":22},"开工预付款支付","BC",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":284,"analysis":37},1111660,"工程价款的主要结算方式有（ ）。",[274,276,278,280,282],{"key":20,"text":275,"correct":26},"按月结算",{"key":24,"text":277,"correct":22},"按工程量结算",{"key":28,"text":279,"correct":26},"竣工后一次结算",{"key":31,"text":281,"correct":26},"目标结算方式",{"key":34,"text":283,"correct":26},"双方约定的其他结算方式","ACDE",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":299,"analysis":37},1111661,"工程价款价差调整的主要方法有（ ）。",[289,291,293,295,297],{"key":20,"text":290,"correct":26},"调值公式法",{"key":24,"text":292,"correct":26},"调价文件计算法",{"key":28,"text":294,"correct":22},"预算价格调整法",{"key":31,"text":296,"correct":26},"实际价格调整法",{"key":34,"text":298,"correct":26},"工程造价指数调整法","ABDE",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":314,"analysis":37},1111662,"工程量清单中有标价的单价或总额包括了工、料、机、管理、利润、缺陷修复，税金等费用，以及合同中明示或暗示的所有（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":26},"责任",{"key":24,"text":307,"correct":22},"权利",{"key":28,"text":309,"correct":26},"义务",{"key":31,"text":311,"correct":22},"保险",{"key":34,"text":313,"correct":26},"一般风险","ACE",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":67,"analysis":37},1111663,"桥梁预制构件的预制场选择需要考虑的主要因素有()。",[319,321,323,325,327],{"key":20,"text":320,"correct":26},"现场的地理、地形环境",{"key":24,"text":322,"correct":26},"桥梁的规模及工期",{"key":28,"text":324,"correct":26},"梁的运输与安装",{"key":31,"text":326,"correct":26},"存梁场面积",{"key":34,"text":328,"correct":22},"桥梁施工单位性质",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":314,"analysis":37},1111664,"根据机械来源的不同，必须经过不同的检验和试验，一般检验的方法和步骤可分为（ ）。",[333,335,337,339,341],{"key":20,"text":334,"correct":26},"外部检验",{"key":24,"text":336,"correct":22},"业主检验",{"key":28,"text":338,"correct":26},"空运转试验",{"key":31,"text":340,"correct":22},"监理检验",{"key":34,"text":342,"correct":26},"重载试验",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":96,"analysis":37},1111665,"公路施工机械化与管理研究机械的施工配置及合理运用施工机械，是为了达到（）的目的。",[347,349,351,353,355],{"key":20,"text":348,"correct":26},"提高机械作业的生产率",{"key":24,"text":350,"correct":22},"提高工程施工质量",{"key":28,"text":352,"correct":22},"降低对环境的污染",{"key":31,"text":354,"correct":26},"降低机械运转费用",{"key":34,"text":356,"correct":26},"延长机械使用寿命",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":371,"analysis":37},1111666,"石屑撒布机包括（ ）。",[361,363,365,367,369],{"key":20,"text":362,"correct":26},"自行式",{"key":24,"text":364,"correct":26},"悬挂式",{"key":28,"text":366,"correct":22},"振动式",{"key":31,"text":368,"correct":22},"复合式",{"key":34,"text":370,"correct":26},"拖式","ABE",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":386,"analysis":37},1111667,"下列设备主要用于隧道暗挖施工中二次支护衬砌的机械有（ ）。",[376,378,380,382,384],{"key":20,"text":377,"correct":22},"装药台车",{"key":24,"text":379,"correct":22},"凿岩台车",{"key":28,"text":381,"correct":26},"搅拌运输车",{"key":31,"text":383,"correct":26},"混凝土输送泵",{"key":34,"text":385,"correct":22},"混凝土喷射机","CD",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":52,"analysis":37},1111668,"石方开挖可能需要用到的机械有（ ）。",[391,393,395,397,399],{"key":20,"text":392,"correct":26},"凿岩台机",{"key":24,"text":394,"correct":26},"挖掘机",{"key":28,"text":396,"correct":26},"推土机",{"key":31,"text":398,"correct":22},"羊足碾",{"key":34,"text":400,"correct":26},"移动式空气压缩机",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":240,"analysis":37},1111669,"路面施工的中型水泥混凝土搅拌设备主要用于（ ）现场使用。",[405,407,409,411,413],{"key":20,"text":406,"correct":26},"中、小型建筑工程",{"key":24,"text":408,"correct":22},"混凝土制品厂",{"key":28,"text":410,"correct":22},"零散浇筑混凝土的简易式单机站",{"key":31,"text":412,"correct":22},"预拌混凝土厂",{"key":34,"text":414,"correct":26},"道路工程",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":52,"analysis":37},1111670,"工程概况有（ ）。",[419,421,423,425,427],{"key":20,"text":420,"correct":26},"施工条件",{"key":24,"text":422,"correct":26},"合同特殊要求",{"key":28,"text":424,"correct":26},"工程施工的特点",{"key":31,"text":426,"correct":22},"施工方案",{"key":34,"text":428,"correct":26},"工程施工的难点分析",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":443,"analysis":37},1111671,"施工总部署的主要内容有（ ）。",[433,435,437,439,441],{"key":20,"text":434,"correct":26},"建立施工管理机构",{"key":24,"text":436,"correct":22},"编制施工工艺技术",{"key":28,"text":438,"correct":26},"施工任务划分",{"key":31,"text":440,"correct":26},"确定施工顺序",{"key":34,"text":442,"correct":22},"编制施工进度计划","ACD",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":299,"analysis":37},1111672,"公路工程进度计划编制的依据包括（ ）。",[448,450,452,454,456],{"key":20,"text":449,"correct":26},"各种有关水文、地质、气象和其他技术经济资料",{"key":24,"text":451,"correct":26},"工程设计图纸",{"key":28,"text":453,"correct":22},"周边的运输条件和施工便道",{"key":31,"text":455,"correct":26},"企业质量管理体系",{"key":34,"text":457,"correct":26},"概算定额",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":284,"analysis":37},1111673,"对“S”曲线描述正确的是（ ）。",[462,464,466,468,470],{"key":20,"text":463,"correct":26},"是工程进度的表达.",{"key":24,"text":465,"correct":22},"是对质量的统计分析",{"key":28,"text":467,"correct":26},"又称为现金流动曲线",{"key":31,"text":469,"correct":26},"以工期为横轴",{"key":34,"text":471,"correct":26},"以累计完成的工程费用的百分比为纵轴",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":486,"analysis":37},1111674,"资源利用的优化主要包括（ ）。",[476,478,480,482,484],{"key":20,"text":477,"correct":22},"施工顺序的优化上",{"key":24,"text":479,"correct":22},"施工作业组织形式的优化",{"key":28,"text":481,"correct":22},"施工机械组织优化.",{"key":31,"text":483,"correct":26},"物资采购与供应计划的优化",{"key":34,"text":485,"correct":26},"机械需要计划的优化","DE",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":67,"analysis":37},1111675,"施工平面布置图的设计原则有（ ）。",[491,493,495,497,499],{"key":20,"text":492,"correct":26},"充分利用原有地形",{"key":24,"text":494,"correct":26},"场区规划必须科学合理",{"key":28,"text":496,"correct":26},"应尽量减少二次倒运和缩短运距",{"key":31,"text":498,"correct":26},"充分考虑水文等自然条件的影响",{"key":34,"text":500,"correct":22},"业主利益高于一切",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":52,"analysis":37},1111676,"施工方案的优化中主要包括（ ）。",[505,507,508,510,511],{"key":20,"text":506,"correct":26},"施工方法的优化",{"key":24,"text":479,"correct":26},{"key":28,"text":509,"correct":26},"施工机械组织优化",{"key":31,"text":483,"correct":22},{"key":34,"text":512,"correct":26},"施工劳动组织的优化",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":240,"analysis":37},1111677,"路基工程施工组织设计应重点考虑的内容有（ ）。",[517,519,521,523,525],{"key":20,"text":518,"correct":26},"确定施工方法和土方调配",{"key":24,"text":520,"correct":22},"布置好堆料点",{"key":28,"text":522,"correct":22},"布置好运料线",{"key":31,"text":524,"correct":22},"按均衡流水法组织施工",{"key":34,"text":526,"correct":26},"确定工地施工组织",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":541,"analysis":37},1111678,"对于桥墩采用流水施工时应注意流水施工的相关时间参数有（ ）。",[531,533,535,537,539],{"key":20,"text":532,"correct":22},"施工过程数.",{"key":24,"text":534,"correct":22},"施工段数",{"key":28,"text":536,"correct":26},"流水节拍.",{"key":31,"text":538,"correct":26},"流水步距",{"key":34,"text":540,"correct":26},"技术间歇","CDE",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":67,"analysis":37},1111679,"施工部署的内容有（）。",[546,548,549,551,553],{"key":20,"text":547,"correct":26},"项目组织机构设置",{"key":24,"text":438,"correct":26},{"key":28,"text":550,"correct":26},"施工顺序",{"key":31,"text":552,"correct":26},"拟定主要项目的施工方案",{"key":34,"text":554,"correct":22},"主要施工阶段工期优化",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":52,"analysis":37},1111680,"工程施工条件主要有（ ）。",[559,561,563,565,567],{"key":20,"text":560,"correct":26},"地形地貌",{"key":24,"text":562,"correct":26},"气象条件",{"key":28,"text":564,"correct":26},"水文条件",{"key":31,"text":566,"correct":22},"工程部位",{"key":34,"text":568,"correct":26},"资源供应情况",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":67,"analysis":37},1111681,"资源需求计划主要包括（ ）。",[573,575,577,579,581],{"key":20,"text":574,"correct":26},"劳动力需求计划",{"key":24,"text":576,"correct":26},"材料需求计划",{"key":28,"text":578,"correct":26},"施工机械设备需求计划",{"key":31,"text":580,"correct":26},"资金需求计划",{"key":34,"text":582,"correct":22},"“香蕉”曲线计划",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":597,"analysis":37},1111682,"路面各结构层的持续时间的考虑因素有（ ）",[587,589,591,593,595],{"key":20,"text":588,"correct":26},"水泥稳定碎石的延迟时间",{"key":24,"text":590,"correct":26},"沥青材料的拌合能力",{"key":28,"text":592,"correct":22},"沥青混合料的温度要求.",{"key":31,"text":594,"correct":26},"养护时间",{"key":34,"text":596,"correct":22},"最大工作面的要求","ABD",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":611,"analysis":37},1111683,"要求间歇是指（ ）。",[602,603,605,607,609],{"key":20,"text":540,"correct":26},{"key":24,"text":604,"correct":22},"总时差",{"key":28,"text":606,"correct":26},"组织间歇",{"key":31,"text":608,"correct":22},"空间间歇",{"key":34,"text":610,"correct":22},"强制时限","AC",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":597,"analysis":37},1111684,"公路工程进度计划的主要形式包括（ ）。",[616,618,620,622,624],{"key":20,"text":617,"correct":26},"横道图",{"key":24,"text":619,"correct":26},"S曲线",{"key":28,"text":621,"correct":22},"控制图",{"key":31,"text":623,"correct":26},"斜率图",{"key":34,"text":625,"correct":22},"相关图",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":443,"analysis":37},1111685,"下列属于公路工程中空间参数的是（ ）。",[630,632,634,636,638],{"key":20,"text":631,"correct":26},"工作面",{"key":24,"text":633,"correct":22},"流水节拍",{"key":28,"text":635,"correct":26},"施工层",{"key":31,"text":637,"correct":26},"施工段",{"key":34,"text":540,"correct":22},{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":314,"analysis":37},1111686,"公路工程进度计划的审查要点包括（ ）。",[643,645,647,649,651],{"key":20,"text":644,"correct":26},"工期和时间安排的合理性",{"key":24,"text":646,"correct":22},"计划目标的可实现性",{"key":28,"text":648,"correct":26},"施工准备的可靠性",{"key":31,"text":650,"correct":22},"工期安排的科学性",{"key":34,"text":652,"correct":26},"计划目标与施工能力的适应性",{"id":654,"libraryId":5,"type":15,"typeLabel":16,"stem":655,"options":656,"answer":269,"analysis":37},1111687,"公路工程流水施工按施工段在空间分布形式可分为（）",[657,659,661,663,665],{"key":20,"text":658,"correct":22},"等节拍流水",{"key":24,"text":660,"correct":26},"流水线法流水施工",{"key":28,"text":662,"correct":26},"流水段法流水施工",{"key":31,"text":664,"correct":22},"异节拍流水",{"key":34,"text":666,"correct":22},"无节拍流水",{"id":668,"libraryId":5,"type":15,"typeLabel":16,"stem":669,"options":670,"answer":240,"analysis":37},1111688,"公路工程流水施工按施工段在空间分布形式分为（ ）。",[671,672,673,674,675],{"key":20,"text":662,"correct":26},{"key":24,"text":658,"correct":22},{"key":28,"text":664,"correct":22},{"key":31,"text":666,"correct":22},{"key":34,"text":660,"correct":26},{"id":677,"libraryId":5,"type":15,"typeLabel":16,"stem":678,"options":679,"answer":687,"analysis":37},1111689,"下列属于公路工程中工艺参数的是（ ）。",[680,682,683,684,686],{"key":20,"text":681,"correct":26},"施工过程数",{"key":24,"text":633,"correct":22},{"key":28,"text":635,"correct":22},{"key":31,"text":685,"correct":26},"流水强度",{"key":34,"text":540,"correct":22},"AD",{"id":689,"libraryId":5,"type":15,"typeLabel":16,"stem":690,"options":691,"answer":314,"analysis":37},1111690,"顺序作业法（也称为依次作业法）的主要特点有（ ）。",[692,694,696,698,700],{"key":20,"text":693,"correct":26},"没有充分利用工作面进行施工",{"key":24,"text":695,"correct":22},"用于需要突击性施工时施工作业的组织",{"key":28,"text":697,"correct":26},"施工现场的组织、管理比较简单",{"key":31,"text":699,"correct":22},"专业化作业队能够连续作业",{"key":34,"text":701,"correct":26},"有利于资源供应的组织工作",{"id":703,"libraryId":5,"type":15,"typeLabel":16,"stem":704,"options":705,"answer":52,"analysis":37},1111691,"第三级技术交底主要内容有（ ）。",[706,708,710,712,714],{"key":20,"text":707,"correct":26},"施工技术措施",{"key":24,"text":709,"correct":26},"工程质量要求",{"key":28,"text":711,"correct":26},"施工规范及验收标准",{"key":31,"text":713,"correct":22},"安全三级培训",{"key":34,"text":715,"correct":26},"作业标准",{"id":717,"libraryId":5,"type":15,"typeLabel":16,"stem":718,"options":719,"answer":67,"analysis":37},1111692,"关于公路工程施工招标评标的说法正确的有（ ）。",[720,722,724,726,728],{"key":20,"text":721,"correct":26},"公路工程施工招标评标,一般应当使用合理低价法",{"key":24,"text":723,"correct":26},"使用世界银行、亚洲开发银行等金融组织贷款的项目,可使用最低评标价法",{"key":28,"text":725,"correct":26},"工程规模小、技术含量较低的工程,可使用最低评标价法",{"key":31,"text":727,"correct":26},"公路工程施工招标的评价方法可以使用合理低价法、最低评标价法、综合评估法和双信封评价法",{"key":34,"text":729,"correct":22},"公路工程施工招标评标,必须使用合理低价法",[731,735,738,741,744,747],{"id":732,"name":733,"category":7,"favorite":734},1,"领导干部任职前廉政法规知识测试题",92,{"id":736,"name":737,"category":7,"favorite":732},595,"建筑结构与设备",{"id":739,"name":740,"category":7,"favorite":732},715,"招标采购专业知识与法律法规",{"id":742,"name":743,"category":7,"favorite":732},848,"市政方向-通用基础",{"id":745,"name":746,"category":7,"favorite":8},534,"BIM工程师",{"id":748,"name":746,"category":7,"favorite":8},535]