[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":619},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,3,50,1644,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,309,320,332,344,356,368,380,392,404,416,428,440,452,464,476,488,499,511,523,535,547,559,571,583,595,607],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1110274,1,"单选题","为消除支架地基的不均匀沉降和支架的非弹性变形并获取弹性变形参数，应采用的手段是（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","预压",true,{"key":24,"text":25,"correct":26},"B","增加传力杆",false,{"key":28,"text":29,"correct":26},"C","硬化地面",{"key":31,"text":32,"correct":26},"D","增加剪刀撑","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1110275,"为防止钻孔灌注桩断桩，在灌注过程中，导管的埋置深度一般控制在（）m的范围内，防止导管埋置深度过深。",[38,40,42,44],{"key":20,"text":39,"correct":26},"1.0～2.0",{"key":24,"text":41,"correct":26},"2.0～3.0",{"key":28,"text":43,"correct":22},"2.0～6.0",{"key":31,"text":45,"correct":26},"6.0～8.0",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1110276,"通过设计和试配确定的配合比，应经批准后方可使用，且应在混凝土拌制前将理论配合比换算为（）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"设计配合比",{"key":24,"text":53,"correct":26},"修正配合比",{"key":28,"text":55,"correct":22},"施工配合比",{"key":31,"text":57,"correct":26},"目标配合比",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1110277,"桥梁容许建筑高度是指公路定线中所确定的（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"桥面标高与设计洪水位之差",{"key":24,"text":65,"correct":22},"桥面标高与通航净空顶部标高之差",{"key":28,"text":67,"correct":26},"桥跨结构最下缘与设计洪水位之差",{"key":31,"text":69,"correct":26},"桥跨结构最下缘与通航净空顶部标高之差",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1110278,"配制混凝土时，应根据结构情况和施工条件确定混凝土拌合物的坍落度，当工程需要获得较大的坍落度时，可以（）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"增加水的用量",{"key":24,"text":77,"correct":26},"减少水泥的用量",{"key":28,"text":79,"correct":22},"适当掺加外加剂",{"key":31,"text":81,"correct":26},"增加拌合时间",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1110279,"某简支空心板梁桥桥面标高21.75m，板厚60cm，桥面铺装厚12cm，设计洪水位标高16.5m，施工水位标高12.25m，低水位标高7.8m，则该桥梁高度为（）m。",[86,88,90,92],{"key":20,"text":87,"correct":26},"5.25",{"key":24,"text":89,"correct":26},"9.5",{"key":28,"text":91,"correct":26},"13.23",{"key":31,"text":93,"correct":22},"13.95",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},1110280,"涵洞按建筑材料可分为砖涵、石涵、混凝土涵和（）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"砖石涵",{"key":24,"text":101,"correct":26},"板涵",{"key":28,"text":103,"correct":22},"钢筋混凝土涵",{"key":31,"text":105,"correct":26},"土涵",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1110281,"关于刚架桥的说法，正确的是（）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"它是由受压的梁板结构与受弯的柱结合在一起的结构",{"key":24,"text":113,"correct":22},"梁与柱之间属于刚性连接，梁因柱的抗弯刚度而得到卸载作用",{"key":28,"text":115,"correct":26},"一般用于跨径较大的公路桥中",{"key":31,"text":117,"correct":26},"刚架桥无水平推力",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1110282,"关于泵送混凝土的说法，正确的是（）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"泵送混凝土应选用硅酸盐水泥、普通硅酸盐水泥、火山灰质硅酸盐水泥等",{"key":24,"text":125,"correct":26},"粗集料宜采用间断级配，细集料宜采用中砂",{"key":28,"text":127,"correct":22},"当掺用掺合料较多时，除应满足强度要求外，还应进行钢筋锈蚀及混凝土碳化试验",{"key":31,"text":129,"correct":26},"混凝土运至浇筑地点后发生离析、严重泌水或坍落度不符合要求时，应废弃",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1110283,"除圆管涵和箱涵外，单孔跨径小于（）的泄水或通行的小型构造物是涵洞。",[134,136,138,140],{"key":20,"text":135,"correct":22},"5m",{"key":24,"text":137,"correct":26},"6m",{"key":28,"text":139,"correct":26},"7m",{"key":31,"text":141,"correct":26},"8m",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1110284,"自高处向模板内倾卸混凝土时，为防止混凝土离析，说法错误的是（）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"自由倾落高度不超过5m时，可直接倾泻",{"key":24,"text":149,"correct":26},"自由倾落高度超过10m时，应设置减速装置",{"key":28,"text":151,"correct":26},"一般可通过串筒、溜管或振动溜管等设施下落",{"key":31,"text":153,"correct":26},"严禁用振动棒分摊混凝土",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1110285,"先张法浇筑空心板的施工工序如下：①安装充气胶囊；②浇筑底板混凝土；③绑扎定位箍筋和面板箍筋；④浇面板混凝土；⑤浇胶囊两侧混凝土，正确的施工顺序是（）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"②→③→①→④→⑤",{"key":24,"text":161,"correct":26},"③→②→①→④→⑤",{"key":28,"text":163,"correct":26},"①→②→⑤→③→④",{"key":31,"text":165,"correct":22},"②→①→③→⑤→④",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},1110286,"下列关于合龙的说法，错误的是（）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"一般先边跨，后次中跨，再中跨，多跨一次合龙时，必须同时均衡对称地合龙",{"key":24,"text":173,"correct":26},"合龙前应在两端悬臂预加压重，并于浇筑混凝土过程中逐步撤除",{"key":28,"text":175,"correct":22},"合龙宜在一天中最高气温时完成",{"key":31,"text":177,"correct":26},"合龙段的混凝土强度等级可提高一级",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1110287,"梁式桥现浇施工时，梁体混凝土在顺桥向宜（）进行浇筑。",[182,184,186,188],{"key":20,"text":183,"correct":26},"从高处向低处",{"key":24,"text":185,"correct":22},"从低处向高处",{"key":28,"text":187,"correct":26},"对称",{"key":31,"text":189,"correct":26},"按桩号顺序",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1110288,"基坑开挖中，喷射混凝土加固不适用于（）条件。",[194,196,198,200],{"key":20,"text":195,"correct":26},"地基土质较好",{"key":24,"text":197,"correct":22},"渗水量较大",{"key":28,"text":199,"correct":26},"开挖深度大",{"key":31,"text":201,"correct":26},"开挖坡度受到限制",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1110289,"后张法预制梁板的施工过程中，张拉应按设计要求在两端同时对称张拉，张拉时千斤顶的作用线必须与（）重合，两端各项张拉操作必须一致。",[206,208,210,212],{"key":20,"text":207,"correct":26},"钢筋型心线",{"key":24,"text":209,"correct":22},"预应力轴线",{"key":28,"text":211,"correct":26},"梁截面轴线",{"key":31,"text":213,"correct":26},"弯矩影响线",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},1110290,"关于结构物回填施工的说法，正确的是（）。",[218,220,222,224],{"key":20,"text":219,"correct":26},"涵背回填应采用倾填方法",{"key":24,"text":221,"correct":26},"桥台台背回填宜采用不透水的黏土作填料",{"key":28,"text":223,"correct":26},"桥台台背和锥坡的回填不能同步进行",{"key":31,"text":225,"correct":22},"挡土墙墙背回填结束后，顶部应及时封闭",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},1110291,"关于钢筋混凝土结构构造裂缝防治的说法，错误的是（）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"增加混凝土搅拌时间",{"key":24,"text":233,"correct":26},"选择安定性好的水泥",{"key":28,"text":235,"correct":26},"大体积混凝土中采用粉煤灰水泥",{"key":31,"text":237,"correct":26},"混凝土中适当掺加缓凝剂",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},1110292,"采用导管法灌注水下混凝土前，应对导管作（）。",[242,244,246,248],{"key":20,"text":243,"correct":26},"抗剪和抗拉试验",{"key":24,"text":245,"correct":26},"水密和抗压试验",{"key":28,"text":247,"correct":22},"水密承压和抗拉试验",{"key":31,"text":249,"correct":26},"闭水和抗弯试验",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":28,"analysis":33},1110294,"下列隧道支护措施中,不属于超前预支护措施的是（）。",[254,256,258,260],{"key":20,"text":255,"correct":26},"搭设管棚",{"key":24,"text":257,"correct":26},"周边预注浆",{"key":28,"text":259,"correct":22},"径向注浆",{"key":31,"text":261,"correct":26},"超前小导管注浆",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":28,"analysis":33},1110295,"下列隧道现场监控量测项目中，属于必测项目的是（）。",[266,268,270,272],{"key":20,"text":267,"correct":26},"围岩压力",{"key":24,"text":269,"correct":26},"锚杆压力",{"key":28,"text":271,"correct":22},"周边位移",{"key":31,"text":273,"correct":26},"爆破震动",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},1110296,"关于隧道水害防治措施的说法，错误的是（）。",[278,280,282,284],{"key":20,"text":279,"correct":26},"因势利导，给地下水以排出的出路，将水迅速排到洞外",{"key":24,"text":281,"correct":26},"将流向隧道的水源截断，或尽可能使其水量减少",{"key":28,"text":283,"correct":22},"隔断排水通道",{"key":31,"text":285,"correct":26},"堵塞衬砌背后的渗流水，集中引导排出",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1110297,"既适用于一般软弱破碎围岩，也适用于地下水丰富的松软围岩，且对围岩加固的范围和强度相对较小的预支护措施是（）。",[290,292,294,296],{"key":20,"text":291,"correct":26},"超前锚杆预支护",{"key":24,"text":293,"correct":22},"超前小导管注浆预支护",{"key":28,"text":295,"correct":26},"管棚预支护",{"key":31,"text":297,"correct":26},"小钢管预支护",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":28,"analysis":33},1110298,"下列复合式隧道监控测量项目中，属于选测项目的是（）。",[302,303,305,307],{"key":20,"text":271,"correct":26},{"key":24,"text":304,"correct":26},"拱顶下沉",{"key":28,"text":306,"correct":22},"钢支撑内力及外力",{"key":31,"text":308,"correct":26},"地表下沉",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":20,"analysis":33},1110299,"掌子面前方围岩基本稳定，但局部存在一定的水流，开挖后可能导致掌子面大量渗漏水而无法施作初期支护时，宜采用（）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"超前局部注浆",{"key":24,"text":316,"correct":26},"周边注浆",{"key":28,"text":318,"correct":26},"全断面帷幕",{"key":31,"text":259,"correct":26},{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":24,"analysis":33},1110300,"隧道施工中，发现水体颜色或悬着物发生变化时，应采取（）处理。",[324,326,328,330],{"key":20,"text":325,"correct":26},"正常施工",{"key":24,"text":327,"correct":22},"综合评价设计施工措施，加强监控量测，必要时采取相应工程对策",{"key":28,"text":329,"correct":26},"暂停施工，采取相应工程对策",{"key":31,"text":331,"correct":26},"认真进行安全技术交底，加快施工进度",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":28,"analysis":33},1110301,"隧道初期支护施工中，施工现场喷射混凝土的工艺中使用较多的是（）。",[336,338,340,342],{"key":20,"text":337,"correct":26},"干喷法",{"key":24,"text":339,"correct":26},"潮喷法",{"key":28,"text":341,"correct":22},"湿喷法",{"key":31,"text":343,"correct":26},"混合喷射法",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":31,"analysis":33},1110302,"浅埋大跨度隧道及地表下沉量要求严格而围岩条件很差的情况时，应用（）方法进行隧道开挖。",[348,350,352,354],{"key":20,"text":349,"correct":26},"全断面法",{"key":24,"text":351,"correct":26},"台阶法",{"key":28,"text":353,"correct":26},"环形开挖留核心土法",{"key":31,"text":355,"correct":22},"双侧壁导坑法",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":28,"analysis":33},1110303,"洞内涌水或地下水位较高时，可采用（）和深井降水法处理。",[360,362,364,366],{"key":20,"text":361,"correct":26},"开挖截水沟",{"key":24,"text":363,"correct":26},"反坡排水",{"key":28,"text":365,"correct":22},"井点降水",{"key":31,"text":367,"correct":26},"平行导坑排水",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":24,"analysis":33},1110304,"在施工过程中应注意洞门端墙与仰坡之间的水沟的沟底至衬砌拱顶外围的高度不应小于（）。",[372,374,376,378],{"key":20,"text":373,"correct":26},"0.5m",{"key":24,"text":375,"correct":22},"1.0m",{"key":28,"text":377,"correct":26},"1.5m",{"key":31,"text":379,"correct":26},"2.0m",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":28,"analysis":33},1110305,"有关设置明洞的论述错误的是（）。",[384,386,388,390],{"key":20,"text":385,"correct":26},"隧道洞口受塌方、落石、泥石流等危害时，通常应设置明洞",{"key":24,"text":387,"correct":26},"明洞主要分为拱式明洞和棚式明洞",{"key":28,"text":389,"correct":22},"拱式明洞整体性好，能承受较大的垂直压力和侧压力，墙体对地基的要求不高",{"key":31,"text":391,"correct":26},"受地形地质条件限制，难以修建拱式明洞时，可采用棚式明洞",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":28,"analysis":33},1110306,"仰拱与掌子面的距离，Ⅳ级围岩不得超过（）。",[396,398,400,402],{"key":20,"text":397,"correct":26},"90",{"key":24,"text":399,"correct":26},"70",{"key":28,"text":401,"correct":22},"50",{"key":31,"text":403,"correct":26},"30",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":31,"analysis":33},1110307,"下列关于明洞施工说法，错误的是（）。",[408,410,412,414],{"key":20,"text":409,"correct":26},"墙背回填应两侧对称进行",{"key":24,"text":411,"correct":26},"墙后有排水设施时，应与回填同时施工",{"key":28,"text":413,"correct":26},"靠山侧边墙顶或边墙墙后，应设置纵向和竖向盲管，将水引至边墙泄水孔排出",{"key":31,"text":415,"correct":22},"石质地层中墙背与岩壁空隙较大时，可采用与墙身同级混凝土回填；",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":31,"analysis":33},1110308,"下列公路隧道超欠挖控制的说法中，错误的是（）。",[420,422,424,426],{"key":20,"text":421,"correct":26},"应采取光面爆破、提高钻眼精度、控制药量等措施",{"key":24,"text":423,"correct":26},"当岩层完整、岩石抗压强度大于30MPa，允许岩石个别突出部分欠挖，但其隆起量不得大于50mm",{"key":28,"text":425,"correct":26},"宜采用断面仪或激光投影仪直接测定开挖面面积",{"key":31,"text":427,"correct":22},"当采用钢架支撑时，如围岩变形较大，支撑可能沉落或局部支撑难以拆除时，应适当减小开挖断面",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":31,"analysis":33},1110309,"围岩分类是隧道中重要的参数，下列不属于应对岩体基本质量指标进行修正的情况是（）。",[432,434,436,438],{"key":20,"text":433,"correct":26},"围岩构造",{"key":24,"text":435,"correct":26},"应力场",{"key":28,"text":437,"correct":26},"地下水的影响",{"key":31,"text":439,"correct":22},"岩石的节理发育程度",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":28,"analysis":33},1110310,"为防止隧道衬砌施工中裂缝的产生，衬砌厚度应根据（）确定。",[444,446,448,450],{"key":20,"text":445,"correct":26},"衬砌混凝土的强度要求",{"key":24,"text":447,"correct":26},"衬砌混凝土的坍落度要求",{"key":28,"text":449,"correct":22},"围岩类别、形状、结构",{"key":31,"text":451,"correct":26},"超挖和欠挖情况",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":20,"analysis":33},1110311,"连拱隧道施工的顺序正确的是（）。",[456,458,460,462],{"key":20,"text":457,"correct":22},"贯通中导洞—中隔墙—主洞开挖",{"key":24,"text":459,"correct":26},"中隔墙—贯通中导洞—主洞开挖",{"key":28,"text":461,"correct":26},"主洞开挖—中隔墙—贯通中导洞",{"key":31,"text":463,"correct":26},"主洞开挖—贯通中导洞—中隔墙",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":20,"analysis":33},1110312,"关于采用工字钢钢拱架进行隧道支护的说法，错误的是（）。",[468,470,472,474],{"key":20,"text":469,"correct":22},"混凝土能充满钢拱架和围岩间空隙，钢拱架与喷射混凝土粘结好",{"key":24,"text":471,"correct":26},"可用于混凝土内作为永久衬砌的一部分",{"key":28,"text":473,"correct":26},"架设后能立即承载",{"key":31,"text":475,"correct":26},"在V，VI级较软弱破碎围岩中使用较多",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":20,"analysis":33},1110313,"富水构造破碎带、煤系或油气地层、瓦斯发育区等地质复杂隧道和水下隧道必须采用（）评价前方地质情况。",[480,482,484,486],{"key":20,"text":481,"correct":22},"超前钻探法预报",{"key":24,"text":483,"correct":26},"地质雷达法",{"key":28,"text":485,"correct":26},"地质调查法",{"key":31,"text":487,"correct":26},"红外探测法",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":28,"analysis":33},1110314,"对于围岩压力来得快、来得大，对围岩变形及地表下沉有严格限制要求的较弱破碎围岩隧道工程施工应采用（）预支护形式。",[492,494,495,497],{"key":20,"text":493,"correct":26},"超前锚杆",{"key":24,"text":261,"correct":26},{"key":28,"text":496,"correct":22},"管棚",{"key":31,"text":498,"correct":26},"插板",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":24,"analysis":33},1110317,"下列设施中，不属于交通标志的是（）。",[503,505,507,509],{"key":20,"text":504,"correct":26},"里程碑",{"key":24,"text":506,"correct":22},"隔离墙",{"key":28,"text":508,"correct":26},"公路界碑",{"key":31,"text":510,"correct":26},"作业区指示牌",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},1110318,"关于公路工程标线施工技术要求的说法，错误的是（）。",[515,517,519,521],{"key":20,"text":516,"correct":22},"标段工程正式开工前应在实验室进行试划试验",{"key":24,"text":518,"correct":26},"正式划标段前，应首先清理路面，保证路面表面清洁干燥，然后根据设计图纸进行放样",{"key":28,"text":520,"correct":26},"划线前，通过控制划线机的行驶速度控制标线厚度",{"key":31,"text":522,"correct":26},"标线充分干燥前，应设置适当警告标志，阻止车辆及行人在作业区内通行",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":31,"analysis":33},1110319,"一条路的交通信号监控系统是由监控分中心和控制节点的计算机系统、外场设备以及（）等组成。",[527,529,531,533],{"key":20,"text":528,"correct":26},"局域网",{"key":24,"text":530,"correct":26},"交换机",{"key":28,"text":532,"correct":26},"可变信息标志",{"key":31,"text":534,"correct":22},"传输通道",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":28,"analysis":33},1110320,"隧道照明控制系统能根据交通量的变化及（）对洞内照明强度进行调节。",[539,541,543,545],{"key":20,"text":540,"correct":26},"电源电压变化",{"key":24,"text":542,"correct":26},"风速的变化",{"key":28,"text":544,"correct":22},"洞外照度的变化",{"key":31,"text":546,"correct":26},"温湿度的变化",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},1110322,"关于隐患的排查与治理，说法错误的是（）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"重大隐患经施工单位确认后应向监理单位备案",{"key":24,"text":554,"correct":26},"项目施工单位的主要负责人对隐患排查治理工作全面负责",{"key":28,"text":556,"correct":26},"项目施工单位应定期组织开展安全生产隐患排查",{"key":31,"text":558,"correct":26},"项目监理、建设单位应及时主动向具有项目管辖权的交通运输主管部门报告",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":28,"analysis":33},1110323,"单价合同工程量清单所列工程数量是指（）。",[563,565,567,569],{"key":20,"text":564,"correct":26},"实际发生的数量",{"key":24,"text":566,"correct":26},"监理工程师确认的数量",{"key":28,"text":568,"correct":22},"设计的预计数量",{"key":31,"text":570,"correct":26},"结算时的确认数量",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":24,"analysis":33},1110324,"公路工程进度计划的主要形式中，既能反映各分部（项）工程的进度，又能反映工程总体进度的是（）。",[575,577,579,581],{"key":20,"text":576,"correct":26},"时标网络图",{"key":24,"text":578,"correct":22},"”S”曲线和横道图结合的公路工程进度表",{"key":28,"text":580,"correct":26},"单代号搭接网络图",{"key":31,"text":582,"correct":26},"”S”曲线",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":28,"analysis":33},1110325,"下列流水施工参数，属于空间参数的是（）。",[587,589,591,593],{"key":20,"text":588,"correct":26},"组织间歇",{"key":24,"text":590,"correct":26},"流水强度",{"key":28,"text":592,"correct":22},"工作面",{"key":31,"text":594,"correct":26},"施工过程数",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":24,"analysis":33},1110326,"对于重要工程变更的程序中，说法正确的是（）。",[599,601,603,605],{"key":20,"text":600,"correct":26},"监理工程师可以直接下达工程指令",{"key":24,"text":602,"correct":22},"业主可以决定所有的工程变更",{"key":28,"text":604,"correct":26},"这部分工程是指工程造价影响较大，但是不需要业主批准的工作",{"key":31,"text":606,"correct":26},"对这些工程变更工作，业主在审批工程变更之前应事先取得国家计划主管部门的批准",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":24,"analysis":33},1110327,"下面关于工程量计量表述错误的是（）。",[611,613,615,617],{"key":20,"text":612,"correct":26},"凡是超过图纸所示的任何长度、面积或体积，均不予计量",{"key":24,"text":614,"correct":22},"全部必需的模板、脚手架应单独计量",{"key":28,"text":616,"correct":26},"如果规范规定的分项工程未在工程细目中出现，则认为是其他相关工程的附属义务，不单独计量",{"key":31,"text":618,"correct":26},"所有计量证书必须由承包人和监理工程师共同签署才能作为支付的凭证",[620,623,626,629,632,635],{"id":15,"name":621,"category":7,"favorite":622},"领导干部任职前廉政法规知识测试题",92,{"id":624,"name":625,"category":7,"favorite":15},595,"建筑结构与设备",{"id":627,"name":628,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":630,"name":631,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":633,"name":634,"category":7,"favorite":8},534,"BIM工程师",{"id":636,"name":634,"category":7,"favorite":8},535]