[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-28":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":727},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,28,50,1644,[13,38,53,68,82,97,112,126,138,153,168,181,195,209,223,237,251,265,280,294,309,323,338,352,366,381,396,410,424,439,453,468,482,495,509,522,536,550,564,579,593,603,615,629,643,657,671,685,699,713],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1111541,2,"多选题","桥梁基础施工中常用的基坑排水方法有（ ）。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","帷幕法",true,{"key":24,"text":25,"correct":22},"B","集水坑排水法",{"key":27,"text":28,"correct":22},"C","板桩法",{"key":30,"text":31,"correct":22},"D","沉井法",{"key":33,"text":34,"correct":35},"E","塑性排水板排水法",false,"ABCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1111542,"桥梁高墩施工宜采用的模板有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":35},"整体模板",{"key":24,"text":45,"correct":22},"翻转模板",{"key":27,"text":47,"correct":22},"爬升模板",{"key":30,"text":49,"correct":22},"滑升模板",{"key":33,"text":51,"correct":35},"拼装模板","BCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1111543,"桥梁附属设施包括（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":35},"监控系统",{"key":24,"text":60,"correct":22},"桥面系",{"key":27,"text":62,"correct":22},"伸缩缝",{"key":30,"text":64,"correct":22},"桥头搭板",{"key":33,"text":66,"correct":22},"锥形护坡","BCDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":36,"analysis":37},1111544,"桥梁基坑开挖中，加固坑壁措施有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"挡板支撑",{"key":24,"text":75,"correct":22},"钢木结合支撑",{"key":27,"text":77,"correct":22},"锚杆支护",{"key":30,"text":79,"correct":22},"混凝土护壁",{"key":33,"text":81,"correct":35},"砌石护坡",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1111545,"桥梁按跨越障碍的性质，可分为（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"跨河桥",{"key":24,"text":89,"correct":35},"钢桥",{"key":27,"text":91,"correct":22},"高架桥",{"key":30,"text":93,"correct":22},"栈桥",{"key":33,"text":95,"correct":35},"农桥","ACD",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1111546,"钻孔灌注桩钻孔前埋设的护筒作用包括（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"稳定孔壁",{"key":24,"text":104,"correct":22},"隔离地表水",{"key":27,"text":106,"correct":22},"固定桩孔位置",{"key":30,"text":108,"correct":35},"保护孔内混凝土",{"key":33,"text":110,"correct":22},"钻头导向作用","ABCE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":96,"analysis":37},1111547,"桥梁挖孔灌注桩适用于（）",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"风化岩层",{"key":24,"text":119,"correct":35},"黏性土",{"key":27,"text":121,"correct":22},"较密实的土层",{"key":30,"text":123,"correct":22},"无地下水或少量地下水",{"key":33,"text":125,"correct":35},"砾卵石",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":36,"analysis":37},1111548,"桥梁按其主要承重结构所用的材料可划分为（ ）。",[130,132,134,136,137],{"key":20,"text":131,"correct":22},"圬工桥",{"key":24,"text":133,"correct":22},"钢筋混凝土桥",{"key":27,"text":135,"correct":22},"预应力混凝土桥",{"key":30,"text":89,"correct":22},{"key":33,"text":93,"correct":35},{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":152,"analysis":37},1111549,"钻孔灌注桩施工中，钻孔的（ ）直接关系到成孔质量，是钻孔桩成败的关键。",[142,144,146,148,150],{"key":20,"text":143,"correct":22},"直径",{"key":24,"text":145,"correct":22},"深度",{"key":27,"text":147,"correct":35},"孔位",{"key":30,"text":149,"correct":22},"孔形",{"key":33,"text":151,"correct":35},"沉淀土厚度","ABD",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":167,"analysis":37},1111550,"在深水、岩面不平、无覆盖层或覆盖层很厚的自然条件下，不宜修建其他类型基础时，可采用的桥梁基础有（ ）。",[157,159,161,163,165],{"key":20,"text":158,"correct":22},"沉井",{"key":24,"text":160,"correct":35},"地下连续墙",{"key":27,"text":162,"correct":22},"管柱",{"key":30,"text":164,"correct":35},"刚性基础",{"key":33,"text":166,"correct":35},"桩基础","AC",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":180,"analysis":37},1111551,"桥梁桩基础按施工方法可分为（）",[172,174,176,178,179],{"key":20,"text":173,"correct":22},"沉桩",{"key":24,"text":175,"correct":22},"钻孔桩",{"key":27,"text":177,"correct":22},"挖孔桩",{"key":30,"text":162,"correct":35},{"key":33,"text":158,"correct":35},"ABC",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":96,"analysis":37},1111552,"无支护加固坑壁的基坑开挖的条件是（ ）。",[185,187,189,191,193],{"key":20,"text":186,"correct":22},"在干枯无水河滩",{"key":24,"text":188,"correct":35},"地下水位高于基底",{"key":27,"text":190,"correct":22},"通过筑堤能排除地表水的河沟",{"key":30,"text":192,"correct":22},"地下水渗透量小，不影响坑壁的稳定",{"key":33,"text":194,"correct":35},"基础埋置较深",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":52,"analysis":37},1111553,"钻孔灌注桩的钻孔泥浆一般由（ ）组成。",[199,201,203,205,207],{"key":20,"text":200,"correct":35},"水泥浆",{"key":24,"text":202,"correct":22},"水",{"key":27,"text":204,"correct":22},"粘土",{"key":30,"text":206,"correct":22},"添加剂",{"key":33,"text":208,"correct":35},"特细沙",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":111,"analysis":37},1111554,"关于大体积混凝土对所用原材料的要求，正确的有（ ）。",[213,215,217,219,221],{"key":20,"text":214,"correct":22},"选用低水化热和凝结时间长的水泥",{"key":24,"text":216,"correct":22},"在保证混凝土强度和施工坍落度的前提下应提高掺合料及骨料的用量",{"key":27,"text":218,"correct":22},"应掺用能降低早期水化热的减水剂",{"key":30,"text":220,"correct":35},"应掺用能降低早期水化热的早强剂",{"key":33,"text":222,"correct":22},"粗骨料宜采用连续级配，细骨集料宜采用中砂",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":67,"analysis":37},1111555,"明挖扩大基础施工的内容包括（ ）等。",[227,229,231,233,235],{"key":20,"text":228,"correct":35},"砌筑防护墙",{"key":24,"text":230,"correct":22},"基底处理",{"key":27,"text":232,"correct":22},"基础的定位放样",{"key":30,"text":234,"correct":22},"基坑开挖",{"key":33,"text":236,"correct":22},"基坑排水",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":96,"analysis":37},1111556,"关于暑期浇筑大体积混凝土的说法,正确的有（ ）。",[241,243,245,247,249],{"key":20,"text":242,"correct":22},"选用水化热低的水泥",{"key":24,"text":244,"correct":35},"混凝土浇筑应在中午时段进行",{"key":27,"text":246,"correct":22},"采用分层浇筑",{"key":30,"text":248,"correct":22},"在混凝土内埋设冷却水管",{"key":33,"text":250,"correct":35},"选用复合型外加剂,加快混凝土凝结时间",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":52,"analysis":37},1111557,"刚架桥施工较复杂，一般用于（ ）。",[255,257,259,261,263],{"key":20,"text":256,"correct":35},"公路铁路两用桥",{"key":24,"text":258,"correct":22},"立交桥",{"key":27,"text":260,"correct":22},"跨径不大的城市桥",{"key":30,"text":262,"correct":22},"公路高架桥",{"key":33,"text":264,"correct":35},"铁路桥",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":279,"analysis":37},1111558,"正循环回转钻孔的特点有（ ）。",[269,271,273,275,277],{"key":20,"text":270,"correct":35},"泥浆通过钻杆中心排出至沉淀池内",{"key":24,"text":272,"correct":22},"钻进与排渣同时进行",{"key":27,"text":274,"correct":22},"施工占地较多",{"key":30,"text":276,"correct":35},"钻渣易堵塞管路",{"key":33,"text":278,"correct":22},"机具设备较复杂","BCE",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":96,"analysis":37},1111559,"桥梁承台基坑的开挖尺寸应根据（ ）条件确定。",[284,286,288,290,292],{"key":20,"text":285,"correct":22},"承台的尺寸",{"key":24,"text":287,"correct":35},"机械尺寸",{"key":27,"text":289,"correct":22},"支模及操作的要求",{"key":30,"text":291,"correct":22},"设置排水沟的需要",{"key":33,"text":293,"correct":35},"坑壁加固需求",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":308,"analysis":37},1111560,"混凝土拌和物运至灌注地点时，应检查其（ ）等。",[298,300,302,304,306],{"key":20,"text":299,"correct":22},"均匀性",{"key":24,"text":301,"correct":35},"密度",{"key":27,"text":303,"correct":35},"水灰比",{"key":30,"text":305,"correct":35},"配合比",{"key":33,"text":307,"correct":22},"坍落度","AE",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":111,"analysis":37},1111561,"钻孔灌注桩施工步骤包括（ ）。",[313,315,317,319,321],{"key":20,"text":314,"correct":22},"制备泥浆",{"key":24,"text":316,"correct":22},"埋设护筒",{"key":27,"text":318,"correct":22},"钻孔",{"key":30,"text":320,"correct":35},"孔内通风",{"key":33,"text":322,"correct":22},"混凝土灌注",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":337,"analysis":37},1111562,"下列后张法预制梁的施工步骤中错误的有（ ）。",[327,329,331,333,335],{"key":20,"text":328,"correct":22},"梁板的振捣以插入式为主，附着式为辅",{"key":24,"text":330,"correct":35},"张拉机具应配套使用，配套定期校验",{"key":27,"text":332,"correct":22},"预应力张拉以应力控制为主，理论伸长量作为校核",{"key":30,"text":334,"correct":22},"预应力筋张拉锚固后，孔道应尽早压浆，且应在72h内完成。",{"key":33,"text":336,"correct":22},"竖向孔道应由最高点的压浆孔压入，并且使水泥浆由最低点的排气孔流出。","ACDE",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":36,"analysis":37},1111563,"桥梁的基本组成包括（ ）。",[342,344,346,348,350],{"key":20,"text":343,"correct":22},"上部结构",{"key":24,"text":345,"correct":22},"支座系统",{"key":27,"text":347,"correct":22},"下部结构",{"key":30,"text":349,"correct":22},"附属设施",{"key":33,"text":351,"correct":35},"中部结构",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":308,"analysis":37},1111564,"确定套箱围堰的套箱顶标高应考虑（ ）。",[356,358,360,362,364],{"key":20,"text":357,"correct":22},"浪高",{"key":24,"text":359,"correct":35},"封底混凝土厚度",{"key":27,"text":361,"correct":35},"承台高度",{"key":30,"text":363,"correct":35},"水的浮力",{"key":33,"text":365,"correct":22},"施工期间可能出现的最高水位",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":380,"analysis":37},1111565,"用支架施工法进行箱梁现浇施工时，地基处理的方式是根据（ ）决定的。",[370,372,374,376,378],{"key":20,"text":371,"correct":22},"支架的形式",{"key":24,"text":373,"correct":22},"箱梁的断面尺寸",{"key":27,"text":375,"correct":35},"箱梁的纵面尺寸",{"key":30,"text":377,"correct":35},"结构的自重",{"key":33,"text":379,"correct":35},"模板的形式","AB",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":395,"analysis":37},1111566,"当大型桥梁的桥墩承台位于深水中时，可采用的围堰形式有（ ）。",[385,387,389,391,393],{"key":20,"text":386,"correct":35},"袋装土围堰",{"key":24,"text":388,"correct":35},"木板围堰",{"key":27,"text":390,"correct":22},"套箱围堰",{"key":30,"text":392,"correct":22},"双壁钢围堰",{"key":33,"text":394,"correct":22},"钢板桩围堰","CDE",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":36,"analysis":37},1111567,"关于采用滑升模板浇筑桥墩混凝土的说法，正确的有（ ）。",[400,402,404,406,408],{"key":20,"text":401,"correct":22},"浇筑应分层分段进行，各段应浇筑到距模板上口不小于100~150mm的位置为止",{"key":24,"text":403,"correct":22},"应采用插入式振动器振捣",{"key":27,"text":405,"correct":22},"每一整体结构的浇筑应连续进行，若因故中途停工，应按施工缝处理",{"key":30,"text":407,"correct":22},"混凝土脱模时的强度宜为0.2~0.5MPa",{"key":33,"text":409,"correct":35},"为加快模板提升时间，可掺入一定数量的引气剂",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":308,"analysis":37},1111568,"高性能混凝土宜选用的水泥有（ ）。",[414,416,418,420,422],{"key":20,"text":415,"correct":22},"硅酸盐水泥",{"key":24,"text":417,"correct":35},"矿渣硅酸盐水泥",{"key":27,"text":419,"correct":35},"粉煤灰硅酸盐水泥",{"key":30,"text":421,"correct":35},"火山灰质硅酸盐水泥",{"key":33,"text":423,"correct":22},"普通硅酸盐水泥",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":438,"analysis":37},1111569,"关于人工挖孔桩施工要求的说法，正确的有（ ）",[428,430,432,434,436],{"key":20,"text":429,"correct":35},"孔口处护圈应与地面齐平",{"key":24,"text":431,"correct":35},"挖孔桩施工应按桩号顺序一次开挖",{"key":27,"text":433,"correct":22},"施工前应制定安全专项施工方案",{"key":30,"text":435,"correct":35},"井孔内电缆应为防水绝缘电缆，照明电压为36V",{"key":33,"text":437,"correct":22},"挖孔作业时，应经常检查孔内空气情况","CE",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":452,"analysis":37},1111570,"桥梁按其用途可划分为（ ）。",[443,445,446,448,450],{"key":20,"text":444,"correct":22},"公路桥",{"key":24,"text":264,"correct":22},{"key":27,"text":447,"correct":35},"木桥",{"key":30,"text":449,"correct":22},"人行桥",{"key":33,"text":451,"correct":22},"运水桥","ABDE",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":467,"analysis":37},1111571,"桥梁按其上部结构的行车道位置可划分为（ ）。",[457,459,461,463,465],{"key":20,"text":458,"correct":22},"上承式桥",{"key":24,"text":460,"correct":35},"顶承式桥",{"key":27,"text":462,"correct":22},"中承式桥",{"key":30,"text":464,"correct":35},"底承式桥",{"key":33,"text":466,"correct":22},"下承式桥","ACE",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":52,"analysis":37},1111572,"桥梁的下部结构包括（ ）。",[472,474,476,478,480],{"key":20,"text":473,"correct":35},"桥跨结构",{"key":24,"text":475,"correct":22},"桥墩",{"key":27,"text":477,"correct":22},"桥台",{"key":30,"text":479,"correct":22},"基础",{"key":33,"text":481,"correct":35},"桥面结构",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":494,"analysis":37},1111573,"桥梁的桥面系包括桥面铺装（或称行车道铺装）及（ ）等。",[486,488,490,491,492],{"key":20,"text":487,"correct":22},"排水防水系统",{"key":24,"text":489,"correct":22},"栏杆",{"key":27,"text":62,"correct":35},{"key":30,"text":64,"correct":35},{"key":33,"text":493,"correct":22},"灯光照明","ABE",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":36,"analysis":37},1111574,"按桥梁全长和跨径的不同，公路桥梁可划分为（ ）。",[499,501,503,505,507],{"key":20,"text":500,"correct":22},"特大型桥",{"key":24,"text":502,"correct":22},"大型桥",{"key":27,"text":504,"correct":22},"中型桥",{"key":30,"text":506,"correct":22},"小型桥",{"key":33,"text":508,"correct":35},"微型桥",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":521,"analysis":37},1111575,"桥梁基础主要包括（）。",[513,514,516,518,519],{"key":20,"text":164,"correct":22},{"key":24,"text":515,"correct":35},"筏板基础",{"key":27,"text":517,"correct":35},"十字交叉基础",{"key":30,"text":166,"correct":22},{"key":33,"text":520,"correct":22},"沉井基础","ADE",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":36,"analysis":37},1111576,"隧道竣工文件中应包括的量测资料是（ ）。",[526,528,530,532,534],{"key":20,"text":527,"correct":22},"现场监控量测计划",{"key":24,"text":529,"correct":22},"现场监控量测说明",{"key":27,"text":531,"correct":22},"实际测点布置图",{"key":30,"text":533,"correct":22},"经量测变更设计和改变施工方法地段的信息反馈记录",{"key":33,"text":535,"correct":35},"设计测点布置图",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":180,"analysis":37},1111577,"隧道监控量测时，量测计划应根据（ ）等编制。",[540,542,544,546,548],{"key":20,"text":541,"correct":22},"围岩条件.",{"key":24,"text":543,"correct":22},"量测项目",{"key":27,"text":545,"correct":22},"施工方法",{"key":30,"text":547,"correct":35},"监控人员素质",{"key":33,"text":549,"correct":35},"隧道长度",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":452,"analysis":37},1111578,"复合式衬砌隧道的选测项目有（ ）。",[554,556,558,560,562],{"key":20,"text":555,"correct":22},"围岩体内位移",{"key":24,"text":557,"correct":22},"围岩压力",{"key":27,"text":559,"correct":35},"周边位移.",{"key":30,"text":561,"correct":22},"支护衬砌内应力",{"key":33,"text":563,"correct":22},"锚杆轴力",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":578,"analysis":37},1111579,"拱顶下沉的量测可以用（ ）。",[568,570,572,574,576],{"key":20,"text":569,"correct":35},"水平仪",{"key":24,"text":571,"correct":22},"水准仪",{"key":27,"text":573,"correct":22},"钢尺",{"key":30,"text":575,"correct":35},"测杆",{"key":33,"text":577,"correct":35},"罗盘","BC",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":521,"analysis":37},1111580,"复合式衬砌的隧道现场监控量测项目中，（）属于必测项目。",[583,585,587,589,591],{"key":20,"text":584,"correct":22},"周边位移",{"key":24,"text":586,"correct":35},"锚杆或锚索内力及抗拔力",{"key":27,"text":588,"correct":35},"围岩弹性波测试",{"key":30,"text":590,"correct":22},"拱顶下沉",{"key":33,"text":592,"correct":22},"地表下沉",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":180,"analysis":37},1111581,"隧道监控量测时，量测部位和测点布置，应根据（ ）等确定。",[597,599,600,601,602],{"key":20,"text":598,"correct":22},"地质条件",{"key":24,"text":543,"correct":22},{"key":27,"text":545,"correct":22},{"key":30,"text":547,"correct":35},{"key":33,"text":549,"correct":35},{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":111,"analysis":37},1111582,"隧道监控量测中，属于选测的项目是（ ）。",[607,608,610,612,613],{"key":20,"text":555,"correct":22},{"key":24,"text":609,"correct":22},"锚杆内力及抗拔力",{"key":27,"text":611,"correct":22},"地表下沉（洞口段、浅埋段h0＞2b）",{"key":30,"text":590,"correct":35},{"key":33,"text":614,"correct":22},"围岩弹性波",{"id":616,"libraryId":5,"type":15,"typeLabel":16,"stem":617,"options":618,"answer":36,"analysis":37},1111583,"隧道地质超前预报方法主要有（ ）。",[619,621,623,625,627],{"key":20,"text":620,"correct":22},"超前钻探法",{"key":24,"text":622,"correct":22},"地质调查法",{"key":27,"text":624,"correct":22},"TSP法",{"key":30,"text":626,"correct":22},"TGP法",{"key":33,"text":628,"correct":35},"TBM法",{"id":630,"libraryId":5,"type":15,"typeLabel":16,"stem":631,"options":632,"answer":380,"analysis":37},1111584,"下列关于掘进工作面的掏槽眼、辅助眼和周边眼的说法，错误的是（ ）。",[633,635,637,639,641],{"key":20,"text":634,"correct":22},"辅助眼的作用是爆破后使坑道断面达到设计的形状和规格",{"key":24,"text":636,"correct":22},"周边眼的作用是进一步扩大掏槽体积和增大爆破量",{"key":27,"text":638,"correct":35},"掏槽眼的作用是将开挖面上某部位的岩石掏出一.一个槽，以形成新的临空面",{"key":30,"text":640,"correct":35},"辅助眼布置主要是解决间距和最小抵抗线问题",{"key":33,"text":642,"correct":35},"直眼掏槽凿岩作业比较方便，不需随循环进尺的改变而变化掏槽形式",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":380,"analysis":37},1111585,"在隧道施工防排水中，洞内涌水或地下水位较高时可采用的方法有（ ）。",[647,649,651,653,655],{"key":20,"text":648,"correct":22},"井点降水法",{"key":24,"text":650,"correct":22},"深井降水法",{"key":27,"text":652,"correct":35},"暗沟",{"key":30,"text":654,"correct":35},"盲沟",{"key":33,"text":656,"correct":35},"排水管",{"id":658,"libraryId":5,"type":15,"typeLabel":16,"stem":659,"options":660,"answer":494,"analysis":37},1111586,"隧道水害的防治措施包括（ ）。",[661,663,665,667,669],{"key":20,"text":662,"correct":22},"因势利导，给地下水以排走的出路，将水迅速地排到洞外",{"key":24,"text":664,"correct":22},"将流向隧道的水源截断，或尽可能使其水量减少",{"key":27,"text":666,"correct":35},"用各种耐腐蚀材料敷设在混凝土衬砌的表面",{"key":30,"text":668,"correct":35},"分析病害成因，对症整治",{"key":33,"text":670,"correct":22},"堵塞衬砌背后的渗流水，集中引导排出",{"id":672,"libraryId":5,"type":15,"typeLabel":16,"stem":673,"options":674,"answer":452,"analysis":37},1111587,"隧道超欠挖测定方法有（ ）。",[675,677,679,681,683],{"key":20,"text":676,"correct":22},"利用激光束测定",{"key":24,"text":678,"correct":22},"用全站仪测定",{"key":27,"text":680,"correct":35},"用钢卷尺确定",{"key":30,"text":682,"correct":22},"用激光隧道界限测量仪测定",{"key":33,"text":684,"correct":22},"用二次衬砌轮廓钢架作基准测定",{"id":686,"libraryId":5,"type":15,"typeLabel":16,"stem":687,"options":688,"answer":467,"analysis":37},1111588,"隧道施工通风按照风道的类型和通风安装位置，通风方式有（ ）。",[689,691,693,695,697],{"key":20,"text":690,"correct":22},"风管式通风",{"key":24,"text":692,"correct":35},"射流机通风",{"key":27,"text":694,"correct":22},"巷道式通风.",{"key":30,"text":696,"correct":35},"无风道通风",{"key":33,"text":698,"correct":22},"风墙式通风",{"id":700,"libraryId":5,"type":15,"typeLabel":16,"stem":701,"options":702,"answer":152,"analysis":37},1111589,"洞内结构防排水，符合要求的有（ ）。",[703,705,707,709,711],{"key":20,"text":704,"correct":22},"防水板宜采用专用台架",{"key":24,"text":706,"correct":22},"防水板宜选用高分子材料",{"key":27,"text":708,"correct":35},"止水带采用钉子固定",{"key":30,"text":710,"correct":22},"防水板的搭接缝焊接质量应按充气法检查",{"key":33,"text":712,"correct":35},"中心排水管（沟）设在仰拱下时，应在仰拱、底板完成后施工",{"id":714,"libraryId":5,"type":15,"typeLabel":16,"stem":715,"options":716,"answer":578,"analysis":37},1111590,"隧道结构构造，由（ ）两大类组成。",[717,719,721,723,725],{"key":20,"text":718,"correct":35},"洞身衬砌",{"key":24,"text":720,"correct":22},"主体构造物",{"key":27,"text":722,"correct":22},"附属构造物",{"key":30,"text":724,"correct":35},"洞门构造物",{"key":33,"text":726,"correct":35},"通风设施",[728,732,735,738,741,744],{"id":729,"name":730,"category":7,"favorite":731},1,"领导干部任职前廉政法规知识测试题",92,{"id":733,"name":734,"category":7,"favorite":729},595,"建筑结构与设备",{"id":736,"name":737,"category":7,"favorite":729},715,"招标采购专业知识与法律法规",{"id":739,"name":740,"category":7,"favorite":729},848,"市政方向-通用基础",{"id":742,"name":743,"category":7,"favorite":8},534,"BIM工程师",{"id":745,"name":743,"category":7,"favorite":8},535]