[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-27":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":728},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,27,50,1644,[13,38,53,68,83,98,112,126,141,156,170,184,198,213,227,242,257,270,284,298,312,325,337,352,366,381,395,405,419,433,447,462,475,489,503,517,531,545,559,573,587,601,615,629,643,657,672,686,700,714],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1111491,2,"多选题","关于沥青表面处治施工技术的说法，正确的是（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","沥青表面处治可采用道路石油沥青、乳化沥青、煤沥青铺筑",true,{"key":24,"text":25,"correct":26},"B","沥青表面处治适用于一级及一级以下公路的沥青面层",false,{"key":28,"text":29,"correct":26},"C","沥青表面处治的集料最大粒径为处治层的厚度的0.8倍",{"key":31,"text":32,"correct":22},"D","沥青表面处治通常采用层铺法施工",{"key":34,"text":35,"correct":26},"E","沥青表面处治宜选择在春季施工","AD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1111492,"沥青表处路面简称沥青表处，是由沥青和细粒碎石按比例组成的一种薄层路面，下列数据符合薄层厚度的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"2cm",{"key":24,"text":45,"correct":22},"3cm",{"key":28,"text":47,"correct":26},"4cm",{"key":31,"text":49,"correct":26},"5cm",{"key":34,"text":51,"correct":26},"6cm","AB",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1111493,"下列对沥青表处路面的叙述中，不正确的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"造价高、施工复杂",{"key":24,"text":60,"correct":26},"路面薄、行车性能好",{"key":28,"text":62,"correct":22},"适用于一级公路的沥青面层",{"key":31,"text":64,"correct":22},"适用于二级及二级以下公路的沥青面层",{"key":34,"text":66,"correct":22},"是由沥青和细粒碎石按比例组成的一种不大于5cm的薄层路面","ACDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1111494,"沥青混合料在摊铺过程中，当出现离析、边角缺料等现象时应及时采取措施有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"碾压",{"key":24,"text":75,"correct":26},"整平",{"key":28,"text":77,"correct":22},"补洒料",{"key":31,"text":79,"correct":22},"换补料",{"key":34,"text":81,"correct":26},"晒水","CD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1111495,"为确保所摊铺路面做到均匀不间断地摊铺，摊铺机要满足要求有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"在摊铺过程中不准随意变换速度",{"key":24,"text":90,"correct":22},"在摊铺过程中尽量避免中途停顿",{"key":28,"text":92,"correct":22},"摊铺机应均匀行驶，行走速度和拌和站产量相匹配",{"key":31,"text":94,"correct":26},"摊铺机应慢速行驶，行走速度和压路机相匹配",{"key":34,"text":96,"correct":26},"摊铺机应慢速行驶，行走速度和平地机相匹配","ABC",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":82,"analysis":37},1111496,"沥青路面的施工中，沥青混凝土半幅施工不能采用热接缝时，应当采用措施有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":26},"假缝",{"key":24,"text":105,"correct":26},"胀缝",{"key":28,"text":107,"correct":22},"人工顺直刨缝",{"key":31,"text":109,"correct":22},"切缝",{"key":34,"text":111,"correct":26},"拉缝",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":52,"analysis":37},1111497,"沥青路面的施工中，沥青混合料的压实步骤包括（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"初压",{"key":24,"text":119,"correct":22},"复压",{"key":28,"text":121,"correct":26},"反压",{"key":31,"text":123,"correct":26},"横压",{"key":34,"text":125,"correct":26},"配料",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1111498,"热拌沥青混凝土路面施工时，应按施工技术规范要求的频率认真作好各种原材料的检验外、还应作下列（）试验工作。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"施工温度",{"key":24,"text":133,"correct":22},"矿料级配",{"key":28,"text":135,"correct":22},"马歇尔试验",{"key":31,"text":137,"correct":22},"压实度",{"key":34,"text":139,"correct":26},"平整度","ABCD",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},1111499,"沥青混合料在运输过程中出现（ ）时应予以废弃。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"已离析的混合料",{"key":24,"text":148,"correct":22},"硬化在运输车箱内的混合料",{"key":28,"text":150,"correct":26},"在夏季中午高温时运输的混合料",{"key":31,"text":152,"correct":22},"低于规定铺筑温度的混合料",{"key":34,"text":154,"correct":22},"被雨淋的混合料","ABDE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":140,"analysis":37},1111500,"热拌沥青混凝土路面施工时，在监理工程师批准的现场备齐全部机械设备进行试验段铺筑，以确定（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"松铺系数",{"key":24,"text":163,"correct":22},"压实遍数",{"key":28,"text":165,"correct":22},"施工工艺",{"key":31,"text":167,"correct":22},"机械配备",{"key":34,"text":169,"correct":26},"地基回弹模量",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":97,"analysis":37},1111501,"沥青混合料出厂时通常应满足的要求有（ ）。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"无白花料",{"key":24,"text":177,"correct":22},"无粗细料离析",{"key":28,"text":179,"correct":22},"无结块",{"key":31,"text":181,"correct":26},"含一定量的水分",{"key":34,"text":183,"correct":26},"粗细料连接紧密",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":36,"analysis":37},1111502,"沥青混合料摊铺时，应采用走线法施工的结构层有（ ）。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"下面层",{"key":24,"text":191,"correct":26},"底面层",{"key":28,"text":193,"correct":26},"上面层",{"key":31,"text":195,"correct":22},"中面层",{"key":34,"text":197,"correct":26},"表面层",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":212,"analysis":37},1111503,"高速公路和一级公路的沥青层采用的粗集料有（ ）。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"碎石",{"key":24,"text":205,"correct":22},"破碎砾石",{"key":28,"text":207,"correct":26},"筛选砾石",{"key":31,"text":209,"correct":22},"钢渣",{"key":34,"text":211,"correct":26},"矿渣","ABD",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":140,"analysis":37},1111504,"沥青路面垫层的作用主要有（ ）。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"排水",{"key":24,"text":220,"correct":22},"隔水",{"key":28,"text":222,"correct":22},"防冻",{"key":31,"text":224,"correct":22},"防污",{"key":34,"text":226,"correct":26},"补强",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":241,"analysis":37},1111505,"沥青路面结构层可由（ ）组成。",[231,233,235,237,239],{"key":20,"text":232,"correct":22},"面层",{"key":24,"text":234,"correct":22},"垫层",{"key":28,"text":236,"correct":22},"基层",{"key":31,"text":238,"correct":26},"透层",{"key":34,"text":240,"correct":22},"底基层","ABCE",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":256,"analysis":37},1111506,"封层的作用有（ ）。",[246,248,250,252,254],{"key":20,"text":247,"correct":22},"封闭某一层起着保水防水作用",{"key":24,"text":249,"correct":26},"使沥青面层与基层结合良好",{"key":28,"text":251,"correct":22},"起基层与沥青表面层之间的过渡和有效连接作用",{"key":31,"text":253,"correct":22},"路的某一层表面破坏离析松散处的加固补强",{"key":34,"text":255,"correct":26},"可减少结构层厚度","ACD",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":269,"analysis":37},1111507,"沥青路面封层的作用主要包括（ ）。",[261,263,265,266,268],{"key":20,"text":262,"correct":26},"使路面具有防冻、防滑作用",{"key":24,"text":264,"correct":22},"基层在沥青面层铺筑前，要临时开放交通，防止基层因天气或车辆作用出现水毁现象",{"key":28,"text":253,"correct":22},{"key":31,"text":267,"correct":22},"起基层与沥青表面层之间的过渡和有效联结作用",{"key":34,"text":247,"correct":22},"BCDE",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":52,"analysis":37},1111508,"沥青路面施工中，应铺筑封层的有（ ）。",[274,276,278,280,282],{"key":20,"text":275,"correct":22},"有裂缝或已修补的旧沥青路面",{"key":24,"text":277,"correct":22},"需加铺磨耗层改善抗滑性能的旧沥青路面",{"key":28,"text":279,"correct":26},"水泥混凝土路面上铺筑沥青层",{"key":31,"text":281,"correct":26},"半刚性基层上铺筑沥青层",{"key":34,"text":283,"correct":26},"无机结构料基层上铺筑沥青层",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":82,"analysis":37},1111509,"透层油达不到渗透深度要求时的正确做法有（ ）。",[288,290,292,294,296],{"key":20,"text":289,"correct":26},"增加封层",{"key":24,"text":291,"correct":26},"调整喷洒透层油时间",{"key":28,"text":293,"correct":22},"更换透层油稠度",{"key":31,"text":295,"correct":22},"更换透层油品种",{"key":34,"text":297,"correct":26},"增洒粘层",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":97,"analysis":37},1111510,"沥青路面施工中，为使沥青面层与非沥青材料基层结合良好，要求在基层上浇洒的材料有（ ）。",[302,304,306,308,310],{"key":20,"text":303,"correct":22},"乳化沥青",{"key":24,"text":305,"correct":22},"煤沥青",{"key":28,"text":307,"correct":22},"液体沥青",{"key":31,"text":309,"correct":26},"热拌沥青碎石",{"key":34,"text":311,"correct":26},"沥青混凝土",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":52,"analysis":37},1111511,"沥青路面施工中，应浇洒透层沥青的条件有（ ）。",[316,318,320,322,323],{"key":20,"text":317,"correct":22},"沥青路面的级配砂砾、级配碎石基层",{"key":24,"text":319,"correct":22},"水泥、石灰、粉煤灰等无机结合料稳定基层",{"key":28,"text":321,"correct":26},"旧沥青路面层上加铺沥青层",{"key":31,"text":279,"correct":26},{"key":34,"text":324,"correct":26},"旧水泥混凝土路面上铺筑沥青层",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":336,"analysis":37},1111512,"透层是为了使沥青面层与基层结合良好，在基层上浇洒（ ）而形成的透人基层表面的薄层。",[329,330,332,334,335],{"key":20,"text":303,"correct":22},{"key":24,"text":331,"correct":26},"SBS改性沥青",{"key":28,"text":333,"correct":26},"快、中凝液体石油沥青",{"key":31,"text":305,"correct":22},{"key":34,"text":307,"correct":22},"ADE",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":351,"analysis":37},1111513,"涵洞按洞顶填土情况分为（ ）。",[341,343,345,347,349],{"key":20,"text":342,"correct":22},"明涵",{"key":24,"text":344,"correct":26},"无压涵",{"key":28,"text":346,"correct":26},"半压力涵",{"key":31,"text":348,"correct":26},"压力涵",{"key":34,"text":350,"correct":22},"暗涵","AE",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":140,"analysis":37},1111514,"涵洞按建筑材料分为（ ）。",[356,358,360,362,364],{"key":20,"text":357,"correct":22},"钢筋混凝土涵",{"key":24,"text":359,"correct":22},"石涵",{"key":28,"text":361,"correct":22},"砖涵",{"key":31,"text":363,"correct":22},"陶瓷管涵",{"key":34,"text":365,"correct":26},"土涵",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":380,"analysis":37},1111515,"涵洞的附属工程包括（ ）。",[370,372,374,376,378],{"key":20,"text":371,"correct":22},"锥形护坡",{"key":24,"text":373,"correct":22},"洞口铺砌",{"key":28,"text":375,"correct":26},"进口",{"key":31,"text":377,"correct":26},"出口",{"key":34,"text":379,"correct":22},"人工水道","ABE",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":140,"analysis":37},1111516,"预制混凝土圆涵管可采用（ ）。",[385,387,389,391,393],{"key":20,"text":386,"correct":22},"振动制管法",{"key":24,"text":388,"correct":22},"离心法",{"key":28,"text":390,"correct":22},"悬辊法",{"key":31,"text":392,"correct":22},"立式挤压法",{"key":34,"text":394,"correct":26},"三辊轴法",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":404,"analysis":37},1111517,"按水力性能划分，涵洞分为（ ）。",[399,400,401,402,403],{"key":20,"text":342,"correct":26},{"key":24,"text":350,"correct":26},{"key":28,"text":344,"correct":22},{"key":31,"text":346,"correct":22},{"key":34,"text":348,"correct":22},"CDE",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":155,"analysis":37},1111518,"波形钢涵洞施工主要工序有（ ）。",[409,411,413,415,417],{"key":20,"text":410,"correct":22},"基坑开挖",{"key":24,"text":412,"correct":22},"管座基础施工",{"key":28,"text":414,"correct":26},"安装拱模",{"key":31,"text":416,"correct":22},"安装管身",{"key":34,"text":418,"correct":22},"涵洞回填及加固",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":155,"analysis":37},1111519,"关于波形钢涵洞施工的说法，正确的有（ ）。",[423,425,427,429,431],{"key":20,"text":424,"correct":22},"涵管两侧对称水平分层填筑，层铺厚度以15cm为宜",{"key":24,"text":426,"correct":22},"在距波形钢管0.3m范围内的填土中，不得含有尺寸超过80mm的石块",{"key":28,"text":428,"correct":26},"对直径大于2.0m的波形钢管涵，宜在管内路中线处设置临时支撑",{"key":31,"text":430,"correct":22},"管内的临时支撑应在填土不再下沉后方可拆除",{"key":34,"text":432,"correct":22},"管顶填高60cm后，按一般路基压实要求碾压",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":155,"analysis":37},1111520,"关于涵洞回填施工规定的说法，正确的有（ ）。",[437,439,441,443,445],{"key":20,"text":438,"correct":22},"洞身两侧，应对称分层回填压实",{"key":24,"text":440,"correct":22},"填料粒径宜小于150mm",{"key":28,"text":442,"correct":26},"回填土的分层厚度宜为0.2~0.3m",{"key":31,"text":444,"correct":22},"回填土的碾压不得采用大型机械碾压",{"key":34,"text":446,"correct":22},"两侧及顶面回填土时，应采取措施防止压实过程对涵洞产生不利后果",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":461,"analysis":37},1111521,"关于预制涵洞拱圈的安装施工，正确的有（ ）。",[451,453,455,457,459],{"key":20,"text":452,"correct":26},"预制拱圈安装后，成品拱圈吊装孔，应以粘土填塞",{"key":24,"text":454,"correct":22},"预制拱圈成品混凝土强度达到设计强度的85%时，方可搬运安装",{"key":28,"text":456,"correct":26},"预制拱圈块之间的砌筑应采用干砌",{"key":31,"text":458,"correct":22},"预制拱圈成品安装前，应检查成品及拱座、墩、台的尺寸",{"key":34,"text":460,"correct":22},"拱座与拱圈拼装接触面，应先拉毛或凿毛（沉降缝处除外），安装前应浇水湿润，再以M10水泥砂浆砌筑","BDE",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":256,"analysis":37},1111522,"可用于桥涵台背的填料有（ ）。",[466,467,469,471,473],{"key":20,"text":203,"correct":22},{"key":24,"text":468,"correct":26},"种植土",{"key":28,"text":470,"correct":22},"石灰土",{"key":31,"text":472,"correct":22},"水泥稳定土",{"key":34,"text":474,"correct":26},"EPS块",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":155,"analysis":37},1111523,"盖板涵（预制吊装）施工主要工序有（ ）。",[479,481,483,485,487],{"key":20,"text":480,"correct":22},"出入口浆砌",{"key":24,"text":482,"correct":22},"下基础",{"key":28,"text":484,"correct":26},"安装管节",{"key":31,"text":486,"correct":22},"现浇板座",{"key":34,"text":488,"correct":22},"墙身施工",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":336,"analysis":37},1111524,"下列关于桥台台背填筑的方法的叙述中，正确的是（ ）。",[493,495,497,499,501],{"key":20,"text":494,"correct":22},"采用水平分层填筑的方法，人工摊铺为主，分层松铺厚度宜小于20cm",{"key":24,"text":496,"correct":26},"当采用小型低等级夯具时，二级以上公路松铺厚度宜小于15cm",{"key":28,"text":498,"correct":26},"压实尽量使用中型机械",{"key":31,"text":500,"correct":22},"在临近桥台边缘或狭窄地段，则采用小型夯压机械",{"key":34,"text":502,"correct":22},"施工中可采用夯压机械横向碾压的方法",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":97,"analysis":37},1111525,"关于台背及与路堤间的回填施工要求正确的有（ ）。",[507,509,511,513,515],{"key":20,"text":508,"correct":22},"二级以下公路的路堤与回填的联结部，应按设计要求预留台阶",{"key":24,"text":510,"correct":22},"台背回填部分的路床宜与路堤路床同步填筑",{"key":28,"text":512,"correct":22},"桥台背和锥坡的回填施工宜同步进行",{"key":31,"text":514,"correct":26},"台背和涵洞洞身两侧的填土应分层夯实，其压实度不应小于95%",{"key":34,"text":516,"correct":26},"不得采用石灰土或水泥稳定土回填",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":155,"analysis":37},1111526,"涵洞按构造形式不同可分为（ ）。",[521,523,525,527,529],{"key":20,"text":522,"correct":22},"圆管涵",{"key":24,"text":524,"correct":22},"拱涵",{"key":28,"text":526,"correct":26},"板涵",{"key":31,"text":528,"correct":22},"箱涵",{"key":34,"text":530,"correct":22},"盖板涵",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":155,"analysis":37},1111527,"现浇箱涵施工主要工序（ ）。",[535,537,539,541,543],{"key":20,"text":536,"correct":22},"砂砾垫层施工",{"key":24,"text":538,"correct":22},"基础模板安装与混凝土浇筑",{"key":28,"text":540,"correct":26},"盖板吊装",{"key":31,"text":542,"correct":22},"基坑开挖与基础处理",{"key":34,"text":544,"correct":22},"拆模与养护",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":241,"analysis":37},1111528,"圆管涵质量检查项目主要包括（ ）。",[549,551,553,555,557],{"key":20,"text":550,"correct":22},"混凝土强度",{"key":24,"text":552,"correct":22},"轴线偏位",{"key":28,"text":554,"correct":22},"管座宽度与厚度",{"key":31,"text":556,"correct":26},"涵洞顶路基压实度",{"key":34,"text":558,"correct":22},"相邻管节底面错口",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":140,"analysis":37},1111529,"下列关于断桩事故原因分析正确的有（ ）。",[563,565,567,569,571],{"key":20,"text":564,"correct":22},"混凝土坍落度小，导管直径较小，在混凝土浇筑过程中堵塞导管",{"key":24,"text":566,"correct":22},"导管接口渗漏致使泥浆进入导管内，在混凝土内形成夹层",{"key":28,"text":568,"correct":22},"导管埋置深度过深，无法提起或将导管拔断",{"key":31,"text":570,"correct":22},"混凝土不能连续灌注，中断时间超过混凝土的初凝时间",{"key":34,"text":572,"correct":26},"导管底口距离孔底距离较小",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":97,"analysis":37},1111530,"属于钻孔灌注桩断桩可能原因的有（ ）。",[577,579,581,583,585],{"key":20,"text":578,"correct":22},"混凝土和易性差而造成离析卡管",{"key":24,"text":580,"correct":22},"设备故障而引起混凝土浇筑时间过长",{"key":28,"text":582,"correct":22},"搅拌土浇筑间歇时间超过混凝土初凝时间",{"key":31,"text":584,"correct":26},"混凝土浇筑过程中导管埋置深度偏小",{"key":34,"text":586,"correct":26},"石料粒径小",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":155,"analysis":37},1111531,"预拱度偏差防治措施正确的有（ ）。",[591,593,595,597,599],{"key":20,"text":592,"correct":22},"提高支架基础、支架及模板的施工质量",{"key":24,"text":594,"correct":22},"严格控制张拉时的混凝土强度",{"key":28,"text":596,"correct":26},"预制梁存梁时间宜长",{"key":31,"text":598,"correct":22},"及时调整预拱度误差",{"key":34,"text":600,"correct":22},"波纹管的安装定位应准确",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":140,"analysis":37},1111532,"属于钢筋混凝土结构构造裂缝产生原因的有（ ）。",[605,607,609,611,613],{"key":20,"text":606,"correct":22},"水泥安定性不合格",{"key":24,"text":608,"correct":22},"骨料为风化性材料",{"key":28,"text":610,"correct":22},"混凝土搅拌时间过长",{"key":31,"text":612,"correct":22},"骨料含泥料过大",{"key":34,"text":614,"correct":26},"水胶比小的混凝土",{"id":616,"libraryId":5,"type":15,"typeLabel":16,"stem":617,"options":618,"answer":67,"analysis":37},1111533,"桥头跳车正确的防治措施包括（ ）。",[619,621,623,625,627],{"key":20,"text":620,"correct":22},"台后填土回填压实度达到要求",{"key":24,"text":622,"correct":26},"减少台前预压长度",{"key":28,"text":624,"correct":22},"采用砂石料做桥头填料",{"key":31,"text":626,"correct":22},"做好桥头路堤的排水、防水工程",{"key":34,"text":628,"correct":22},"改善地基性能，提高地基承载力",{"id":630,"libraryId":5,"type":15,"typeLabel":16,"stem":631,"options":632,"answer":52,"analysis":37},1111534,"为预防钢筋混凝土结构构造裂缝，大体积混凝土应优选（ ）等低水化热水泥。",[633,635,637,639,641],{"key":20,"text":634,"correct":22},"矿渣水泥",{"key":24,"text":636,"correct":22},"粉煤灰水泥",{"key":28,"text":638,"correct":26},"高强度水泥",{"key":31,"text":640,"correct":26},"铝酸盐水泥",{"key":34,"text":642,"correct":26},"掺早强剂水泥",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":256,"analysis":37},1111535,"钻孔灌注桩断桩的防治措施有（ ）。",[647,649,651,653,655],{"key":20,"text":648,"correct":22},"混凝土坍落度要控制在18～22cm",{"key":24,"text":650,"correct":26},"在灌注过程中，导管的埋置深度一般控制在2.0～4.0m的范围内",{"key":28,"text":652,"correct":22},"在提拔导管时要通过测量混凝土的灌注深度及已拆下导管的长度，认真计算提拔导管的长度",{"key":31,"text":654,"correct":22},"导管使用前，要对导管检漏和抗拉力试验",{"key":34,"text":656,"correct":26},"首批混凝土灌注后要能埋住导管",{"id":658,"libraryId":5,"type":15,"typeLabel":16,"stem":659,"options":660,"answer":671,"analysis":37},1111536,"属于造成预制梁桥预拱度偏差的原因的有（ ）。",[661,663,665,667,669],{"key":20,"text":662,"correct":26},"支架弹性变形混凝土梁挠度的计算有误",{"key":24,"text":664,"correct":22},"施加预应力时间差异",{"key":28,"text":666,"correct":22},"实际预应力超过设计预应力",{"key":31,"text":668,"correct":22},"波纹管竖向偏位过大",{"key":34,"text":670,"correct":26},"支架地基在荷载作用下的沉陷计算有误","BCD",{"id":673,"libraryId":5,"type":15,"typeLabel":16,"stem":674,"options":675,"answer":155,"analysis":37},1111537,"钻孔灌注桩断桩的原因有（ ）。",[676,678,680,682,684],{"key":20,"text":677,"correct":22},"导管拔出混凝土面",{"key":24,"text":679,"correct":22},"导管口处于泥浆层",{"key":28,"text":681,"correct":26},"导管直径较大",{"key":31,"text":683,"correct":22},"导管口处于泥浆与混凝土的混合层",{"key":34,"text":685,"correct":22},"首批灌注的混凝土没有埋住导管",{"id":687,"libraryId":5,"type":15,"typeLabel":16,"stem":688,"options":689,"answer":269,"analysis":37},1111538,"属于桥梁伸缩缝病害原因的有（ ）。",[690,692,694,696,698],{"key":20,"text":691,"correct":26},"交通流量偏小",{"key":24,"text":693,"correct":22},"将伸缩缝的预埋钢筋锚固于刚度薄弱的桥面板中",{"key":28,"text":695,"correct":22},"锚件焊接内在质量",{"key":31,"text":697,"correct":22},"轻微的损害未能及时维修",{"key":34,"text":699,"correct":22},"伸缩设计量不足",{"id":701,"libraryId":5,"type":15,"typeLabel":16,"stem":702,"options":703,"answer":140,"analysis":37},1111539,"下列关于后张法预制粱板的施工正确的是（ ）。",[704,706,708,710,712],{"key":20,"text":705,"correct":22},"规定预制场地平整压实，预压台座坚固不沉陷，确保底模层降不大于2mm，当预制梁跨大手20m是，要按规定设置反拱",{"key":24,"text":707,"correct":22},"梁混凝土浇筑完成后要将表面抹平、拉毛、收浆后适时覆盖，洒水湿养不少于7d，蒸汽养生恒温不宜超过80℃，也可采用喷洒养生剂",{"key":28,"text":709,"correct":22},"预应力筋张拉后，在孔道中冲洗干净，吹除积水，尽早压注水泥浆.",{"key":31,"text":711,"correct":22},"对钢筋施加预应力之前检查构件是否符合质量标准要求，张拉时构件强度无设计规定时不低于设计强度的80%",{"key":34,"text":713,"correct":26},"预应力筋在张拉控制应力达到稳定后方可锚固，锚同时不应外露钢筋，锚具应用封端混凝土保护。",{"id":715,"libraryId":5,"type":15,"typeLabel":16,"stem":716,"options":717,"answer":155,"analysis":37},1111540,"模板设计与加工应确保（ ）。",[718,720,722,724,726],{"key":20,"text":719,"correct":22},"模板应有足够的强度",{"key":24,"text":721,"correct":22},"模板结构尺寸准确",{"key":28,"text":723,"correct":26},"模板外露面美观",{"key":31,"text":725,"correct":22},"模板板面平整",{"key":34,"text":727,"correct":22},"模板接缝严密",[729,733,736,739,742,745],{"id":730,"name":731,"category":7,"favorite":732},1,"领导干部任职前廉政法规知识测试题",92,{"id":734,"name":735,"category":7,"favorite":730},595,"建筑结构与设备",{"id":737,"name":738,"category":7,"favorite":730},715,"招标采购专业知识与法律法规",{"id":740,"name":741,"category":7,"favorite":730},848,"市政方向-通用基础",{"id":743,"name":744,"category":7,"favorite":8},534,"BIM工程师",{"id":746,"name":744,"category":7,"favorite":8},535]