[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":722},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,24,50,1644,[13,38,52,66,80,91,104,119,133,147,162,177,191,206,221,235,250,264,278,292,304,318,332,346,360,374,389,404,418,432,447,461,475,489,503,513,527,541,555,569,583,595,609,624,638,652,666,680,695,709],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1111341,2,"多选题","沿河路基抢修工程常采用抛石，关于它的说法正确的有（ ）。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","抛石防护除特殊情况外，宜在枯水季节施工",true,{"key":24,"text":25,"correct":22},"B","坡度应不陡于抛石石料浸水后的天然休止角",{"key":27,"text":28,"correct":22},"C","石料粒径应大于300mm",{"key":30,"text":31,"correct":22},"D","抛石体边坡坡度和石料粒径应根据水深、流速和波浪情况确定",{"key":33,"text":34,"correct":35},"E","抛石厚度，宜为粒径的3~4倍；用大粒径时，不得小于3倍",false,"ABCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":51,"analysis":37},1111342,"关于抛石防护施工要求的说法，正确的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":35},"宜用大小均一的石块掺杂抛投",{"key":24,"text":45,"correct":22},"抛石的石料粒径应大于300mm",{"key":27,"text":47,"correct":22},"抛石体坡坡度不陡于抛石石料粒浸水后的天然休止角",{"key":30,"text":49,"correct":22},"抛石厚度，宜为粒径的3～4倍",{"key":33,"text":21,"correct":22},"BCDE",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":36,"analysis":37},1111343,"关于锚杆挂网喷射混凝土（砂浆）防护施工要求的说法，正确的有（ ）。",[56,58,60,62,64],{"key":20,"text":57,"correct":22},"锚杆孔深应大于锚固长度200mm",{"key":24,"text":59,"correct":22},"钢筋保护层厚度不宜小于20mm",{"key":27,"text":61,"correct":22},"钢筋网与岩面的间隙宜为30mm",{"key":30,"text":63,"correct":22},"固定锚杆的砂浆应捣固密实",{"key":33,"text":65,"correct":35},"钢筋网与锚杆不宜连接牢固",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":51,"analysis":37},1111344,"支挡构筑物的常用类型有（ ）。",[70,72,74,76,78],{"key":20,"text":71,"correct":35},"护面墙",{"key":24,"text":73,"correct":22},"抗滑桩",{"key":27,"text":75,"correct":22},"边坡锚固",{"key":30,"text":77,"correct":22},"土钉支护",{"key":33,"text":79,"correct":22},"挡土墙",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":90,"analysis":37},1111345,"支挡建筑物用以防止路基变形或支挡路基本体或山体的位移，以保证其稳定性，常用的类型有（ ）。",[84,85,87,88,89],{"key":20,"text":79,"correct":22},{"key":24,"text":86,"correct":35},"间接防护",{"key":27,"text":75,"correct":22},{"key":30,"text":77,"correct":22},{"key":33,"text":73,"correct":22},"ACDE",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":36,"analysis":37},1111346,"属于路基加固工程类型的有（ ）。",[95,97,99,100,102],{"key":20,"text":96,"correct":22},"植物防护",{"key":24,"text":98,"correct":22},"挂网喷护",{"key":27,"text":71,"correct":22},{"key":30,"text":101,"correct":22},"锚杆挡土墙",{"key":33,"text":103,"correct":35},"绿化边坡",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":118,"analysis":37},1111347,"路基防护工程是防治路基病害，保证路基稳定，改善环境景观，保护生态平衡的重要设施。其类型可分为（ ）。",[108,110,112,114,116],{"key":20,"text":109,"correct":35},"石膏防护",{"key":24,"text":111,"correct":22},"支挡构筑物",{"key":27,"text":113,"correct":22},"沿河路基防护",{"key":30,"text":115,"correct":22},"边坡坡面防护",{"key":33,"text":117,"correct":35},"自然防护","BCD",{"id":120,"libraryId":5,"type":15,"typeLabel":16,"stem":121,"options":122,"answer":36,"analysis":37},1111348,"南方某公路路堤边坡上修筑有菱形浆砌片石框格，在框格中间铺有台湾草草坪并配以少量红铁、龙船花、丝兰等植物，该设施的作用有（ ）。",[123,125,127,129,131],{"key":20,"text":124,"correct":22},"防治路基病害",{"key":24,"text":126,"correct":22},"保证路基稳定",{"key":27,"text":128,"correct":22},"改变环境景观",{"key":30,"text":130,"correct":22},"保护生态平衡",{"key":33,"text":132,"correct":35},"治理大型滑坡",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":118,"analysis":37},1111349,"路基边坡坡面防护可以防止和延缓软弱岩土的（ ）。",[137,139,141,143,145],{"key":20,"text":138,"correct":35},"崩塌",{"key":24,"text":140,"correct":22},"碎裂",{"key":27,"text":142,"correct":22},"风化",{"key":30,"text":144,"correct":22},"剥蚀",{"key":33,"text":146,"correct":35},"搬运",{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":161,"analysis":37},1111350,"控制填石路基施工压实质量的施工参数有（ ）。",[151,153,155,157,159],{"key":20,"text":152,"correct":22},"压实功率",{"key":24,"text":154,"correct":22},"碾压速度",{"key":27,"text":156,"correct":22},"压实遍数",{"key":30,"text":158,"correct":35},"压实度",{"key":33,"text":160,"correct":22},"铺筑层厚","ABCE",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":176,"analysis":37},1111351,"关于纵向分层填筑法说法正确的有（ ）。",[166,168,170,172,174],{"key":20,"text":167,"correct":22},"逐层向坡向填筑",{"key":24,"text":169,"correct":35},"逐层向上填筑",{"key":27,"text":171,"correct":35},"填筑时按照横断面全宽分成水平层次",{"key":30,"text":173,"correct":35},"是路基填筑的常用方法",{"key":33,"text":175,"correct":22},"宜用于用推土机从路堑取土填筑距离较短的路堤。","AE",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":190,"analysis":37},1111352,"水平分层填筑法的具体做法是（ ）。",[181,183,185,186,188],{"key":20,"text":182,"correct":35},"从原地面开始水平填筑",{"key":24,"text":184,"correct":22},"按设计断面分成水平层次",{"key":27,"text":169,"correct":22},{"key":30,"text":187,"correct":35},"每填筑一层，经水准仪检测合格后，再填上一层土",{"key":33,"text":189,"correct":35},"宜在山坡上从填方坡脚向上挖成向内倾斜的台阶","BC",{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":205,"analysis":37},1111353,"关于土方路堤填筑要求正确的有（ ）。",[195,197,199,201,203],{"key":20,"text":196,"correct":22},"性质不同的填料，应水平分层、分段填筑，分层压实",{"key":24,"text":198,"correct":22},"同一水平层路基的全宽应采用同一种填料，不得混合填筑",{"key":27,"text":200,"correct":22},"每种填料的填筑层压实后的连续厚度不宜小于500mm",{"key":30,"text":202,"correct":35},"对潮湿或冻融敏感性小的填料应填筑在路基下层",{"key":33,"text":204,"correct":35},"每一填筑层压实后的宽度应等于设计宽度","ABC",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":220,"analysis":37},1111354,"关于路堤填筑方式的说法正确的有（ ）。",[210,212,214,216,218],{"key":20,"text":211,"correct":22},"每种填料的填筑层压实后的连续厚度不宜小于.500mm填筑路床顶最后一层时，压实后的厚度应不小于.100mm",{"key":24,"text":213,"correct":22},"优良土应填在上层，强度较小的土应填在下层",{"key":27,"text":215,"correct":35},"河滩路堤填土，路堤与护道应分别填筑",{"key":30,"text":217,"correct":22},"透水性较小的土填筑于路堤下层，应做2%-4%的双向横坡",{"key":33,"text":219,"correct":35},"透水性较大的土填筑于路堤下层，应做4%的双向横坡","ABD",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":234,"analysis":37},1111355,"关于路堤填筑施工，以下哪些说法是正确的（ ）。",[225,227,229,230,232],{"key":20,"text":226,"correct":35},"同一水平层路基的全宽可采用不同填料填筑",{"key":24,"text":228,"correct":22},"填筑路床顶最后一层时，压实后的厚度应不小于100mm",{"key":27,"text":202,"correct":35},{"key":30,"text":231,"correct":35},"强度较小的填料应填筑在上层",{"key":33,"text":233,"correct":22},"当原地面纵坡大于12%或横坡陡于1：5时，应按设计要求挖台阶","BE",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":249,"analysis":37},1111356,"填筑沿河浸水路堤较适合的填料有（ ）。",[239,241,243,245,247],{"key":20,"text":240,"correct":22},"砂砾石土",{"key":24,"text":242,"correct":35},"亚砂土",{"key":27,"text":244,"correct":35},"亚粘土",{"key":30,"text":246,"correct":22},"碎（砾）石土",{"key":33,"text":248,"correct":35},"粉性土","AD",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":118,"analysis":37},1111357,"选择路堤填料时，不得直接使用的土有（ ）。",[254,256,258,260,262],{"key":20,"text":255,"correct":35},"砂土",{"key":24,"text":257,"correct":22},"有机质土",{"key":27,"text":259,"correct":22},"冻土",{"key":30,"text":261,"correct":22},"强膨胀土",{"key":33,"text":263,"correct":35},"粘土",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":205,"analysis":37},1111358,"在选择路堤填料时,严禁作为填料的土有（ ）。",[268,270,272,274,276],{"key":20,"text":269,"correct":22},"含生活垃圾的土",{"key":24,"text":271,"correct":22},"有机土、含草皮土",{"key":27,"text":273,"correct":22},"含腐殖质的土",{"key":30,"text":275,"correct":35},"盐渍土、黄土、膨胀土",{"key":33,"text":277,"correct":35},"液限大于50、塑性指数大于26的土",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":291,"analysis":37},1111359,"不得直接作为路堤填料，需要应用时，必须采取满足设计要求的技术措施，经检查合格后方可使用的土有（ ）。",[282,284,286,288,289],{"key":20,"text":283,"correct":22},"液限大于50、塑性指数大于26的土、含水量不适宜直接压实的细粒土",{"key":24,"text":285,"correct":22},"泥炭、淤泥、冻土、强膨胀土、有机质土及易溶盐超过允许含量的土",{"key":27,"text":287,"correct":35},"含草皮的土",{"key":30,"text":269,"correct":35},{"key":33,"text":290,"correct":35},"腐殖质的土","AB",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":36,"analysis":37},1111360,"以下哪些土不得直接作为路堤填料。需要应用时，必须采取满足设计要求的技术措施，经检查合格后方可使用（ ）。",[296,297,299,301,302],{"key":20,"text":277,"correct":22},{"key":24,"text":298,"correct":22},"含水量不适宜直接压实的细粒土",{"key":27,"text":300,"correct":22},"淤泥",{"key":30,"text":257,"correct":22},{"key":33,"text":303,"correct":35},"杂填土",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":90,"analysis":37},1111361,"用湿粘土、红粘土和中、弱膨胀土作为填料直接填筑时，应符合（ ）。",[308,310,312,314,316],{"key":20,"text":309,"correct":22},"液限在40%～70%之间、塑性指数在18～26之间",{"key":24,"text":311,"correct":35},"液限大于50%、塑性指数大于26",{"key":27,"text":313,"correct":22},"采用湿土法制作试件，试件的CBR值满足规范的规定",{"key":30,"text":315,"correct":22},"不得作为二级及二级以上公路路床、零填及挖方路基0～0.80m范围内的填料",{"key":33,"text":317,"correct":22},"不得作为三、四级公路上路床、零填及挖方路基0~0.30m范围内的填料",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":205,"analysis":37},1111362,"路堑爆破施工中，确定综合爆破方法的根据有（ ）。",[322,324,326,328,330],{"key":20,"text":323,"correct":22},"石方的集中程度",{"key":24,"text":325,"correct":22},"地质、地形条件",{"key":27,"text":327,"correct":22},"公路路基断面的形状",{"key":30,"text":329,"correct":35},"工人数量",{"key":33,"text":331,"correct":35},"工程造价",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":249,"analysis":37},1111363,"路堑爆破施工中，深孔爆破具有的优点有（ ）。",[336,338,340,342,344],{"key":20,"text":337,"correct":22},"劳动生产率高，一次爆落的方量多，施工进度快",{"key":24,"text":339,"correct":35},"比较灵活",{"key":27,"text":341,"correct":35},"作为其他炮型服务的辅助炮型",{"key":30,"text":343,"correct":22},"爆破时比较安全",{"key":33,"text":345,"correct":35},"作为其他炮型服务的先导炮",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":190,"analysis":37},1111364,"路堑爆破施工中，钢钎炮特征有（ ）。",[350,352,354,356,358],{"key":20,"text":351,"correct":35},"炮眼直径大于7cm",{"key":24,"text":353,"correct":22},"深度小于5m",{"key":27,"text":355,"correct":22},"炮眼直径小于7cm",{"key":30,"text":357,"correct":35},"深度大于5m",{"key":33,"text":359,"correct":35},"用钢钎装药",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":161,"analysis":37},1111365,"用于公路路基的填料应满足的要求有（ ）。",[364,366,368,370,372],{"key":20,"text":365,"correct":22},"压实容易",{"key":24,"text":367,"correct":22},"强度高",{"key":27,"text":369,"correct":22},"挖取方便",{"key":30,"text":371,"correct":35},"密度高",{"key":33,"text":373,"correct":22},"水稳定性好",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":388,"analysis":37},1111366,"路堑爆破施工中，药壶炮的使用条件有（ ）。 A.岩石应在Ⅺ级以下",[378,380,382,384,386],{"key":20,"text":379,"correct":22},"岩石需含少量水分",{"key":24,"text":381,"correct":35},"阶梯高度",{"key":27,"text":383,"correct":22},"小于10～20m，自然地面坡度在70°左右",{"key":30,"text":385,"correct":22},"岩石不含水分",{"key":33,"text":387,"correct":35},"岩石需含大量水分","ACD",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":403,"analysis":37},1111367,"石质路堑施工技术的基本要求包括（ ）。",[393,395,397,399,401],{"key":20,"text":394,"correct":22},"辅助工程量少",{"key":24,"text":396,"correct":22},"保证开挖质量和施工安全",{"key":27,"text":398,"correct":35},"符合施工工期和开挖深度的要求",{"key":30,"text":400,"correct":22},"有利于维护岩体完整和边坡稳定",{"key":33,"text":402,"correct":22},"可以充分发挥施工机械的生产能力","ABDE",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":161,"analysis":37},1111368,"石质路堑常用的爆破方法包括（ ）",[408,410,412,414,416],{"key":20,"text":409,"correct":22},"微差爆破",{"key":24,"text":411,"correct":22},"预裂爆破",{"key":27,"text":413,"correct":22},"光面爆破",{"key":30,"text":415,"correct":35},"深孔爆破",{"key":33,"text":417,"correct":22},"定向爆破",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":291,"analysis":37},1111369,"推土机开挖土质路堑作业时，影响作业效率的主要因素有（ ）环节。",[422,424,426,428,430],{"key":20,"text":423,"correct":22},"切土",{"key":24,"text":425,"correct":22},"运土",{"key":27,"text":427,"correct":35},"卸土",{"key":30,"text":429,"correct":35},"倒退（或折返）",{"key":33,"text":431,"correct":35},"空回",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":446,"analysis":37},1111370,"关于填石路堤基底处理要求正确的有（ ）。",[436,438,440,442,444],{"key":20,"text":437,"correct":35},"路堤修筑范围内，原地面的坑、洞、墓穴等应用块石回填",{"key":24,"text":439,"correct":35},"原地基为耕地或松土时，应先清除有机土、种植土、草皮等，清除深度应达到设计要求，一般不小于50cm",{"key":27,"text":441,"correct":22},"除满足土质路堤地基表层处理要求外，承载力还应满足设计要求",{"key":30,"text":443,"correct":22},"在非岩石地基上，填筑填石路堤前，应按设计要求设过渡层",{"key":33,"text":445,"correct":35},"当路堤原地基横坡陡于1：5时，应设置支挡结构物","CD",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":234,"analysis":37},1111371,"挖掘机开挖土质路堑作业时，其作业方法有（ ）。",[451,453,455,457,459],{"key":20,"text":452,"correct":35},"反向开挖",{"key":24,"text":454,"correct":22},"侧向开挖",{"key":27,"text":456,"correct":35},"斜向开挖",{"key":30,"text":458,"correct":35},"正反向开挖",{"key":33,"text":460,"correct":22},"正向开挖",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":403,"analysis":37},1111372,"关于滑坡地段路基施工要求，正确的有（ ）。",[465,467,469,471,473],{"key":20,"text":466,"correct":22},"滑坡体未处理之前，严禁在滑坡体上增加恒载",{"key":24,"text":468,"correct":22},"采用加填压脚方案整治滑坡时，只能在抗滑段加重反压",{"key":27,"text":470,"correct":35},"滑坡整治宜在春季多雨季节施工，用水方便",{"key":30,"text":472,"correct":22},"采用削坡减载方案整治滑坡时，减载应自上而下进行",{"key":33,"text":474,"correct":22},"施工时应采取措施截断流向滑坡体的地表水、地下水及临时用水",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":205,"analysis":37},1111373,"在对滑坡地段进行开挖时应，采用削坡减载方案整治滑坡时（ ）",[479,481,483,485,487],{"key":20,"text":480,"correct":22},"减载应自上而下进行",{"key":24,"text":482,"correct":22},"严禁超挖或乱挖",{"key":27,"text":484,"correct":22},"严禁爆破减载",{"key":30,"text":486,"correct":35},"减载应自下而上进行",{"key":33,"text":488,"correct":35},"可以超挖",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":36,"analysis":37},1111374,"排除滑坡地下水的设施（ ）。",[493,495,497,499,501],{"key":20,"text":494,"correct":22},"支撑渗沟",{"key":24,"text":496,"correct":22},"边坡渗沟",{"key":27,"text":498,"correct":22},"暗沟",{"key":30,"text":500,"correct":22},"平孔",{"key":33,"text":502,"correct":35},"天沟",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":36,"analysis":37},1111375,"主要用于排除地下水的方法有（ ）。",[507,508,509,510,511],{"key":20,"text":494,"correct":22},{"key":24,"text":498,"correct":22},{"key":27,"text":496,"correct":22},{"key":30,"text":500,"correct":22},{"key":33,"text":512,"correct":35},"边沟",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":291,"analysis":37},1111376,"不宜用滑坡减重来处理的滑坡有（ ）。",[517,519,521,523,525],{"key":20,"text":518,"correct":22},"牵引式滑坡",{"key":24,"text":520,"correct":22},"具有膨胀性质的滑坡",{"key":27,"text":522,"correct":35},"顺层滑坡",{"key":30,"text":524,"correct":35},"大型滑坡",{"key":33,"text":526,"correct":35},"推动式滑坡",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":205,"analysis":37},1111377,"滑坡防治的工程措施类别主要有（ ）。",[531,533,535,537,539],{"key":20,"text":532,"correct":22},"排水",{"key":24,"text":534,"correct":22},"力学平衡",{"key":27,"text":536,"correct":22},"改变滑带土",{"key":30,"text":538,"correct":35},"降温",{"key":33,"text":540,"correct":35},"换填",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":234,"analysis":37},1111378,"关于滑坡排水的说法，正确的有（ ）。",[545,547,549,551,553],{"key":20,"text":546,"correct":35},"必须在滑动面以内修筑1～2条环形截水沟",{"key":24,"text":548,"correct":22},"应平整夯实滑坡体表面的土层",{"key":27,"text":550,"correct":35},"地下水可采用暗沟排出或地下水进行封闭",{"key":30,"text":552,"correct":35},"坡面上有裂缝时应直接用黏质土回填夯实",{"key":33,"text":554,"correct":22},"树枝状排水沟的主要作用是排除滑体坡面上的径流",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":205,"analysis":37},1111379,"粒料桩施工中桩体可采用的材料有（ ）。",[559,561,563,565,567],{"key":20,"text":560,"correct":22},"砂",{"key":24,"text":562,"correct":22},"碎石",{"key":27,"text":564,"correct":22},"砂砾",{"key":30,"text":566,"correct":35},"生石灰",{"key":33,"text":568,"correct":35},"粉煤灰",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":36,"analysis":37},1111380,"粒料桩的施工工艺程序有（ ）。",[573,575,577,579,581],{"key":20,"text":574,"correct":22},"振冲器就位对中",{"key":24,"text":576,"correct":22},"清孔",{"key":27,"text":578,"correct":22},"关机停水",{"key":30,"text":580,"correct":22},"加料振密",{"key":33,"text":582,"correct":35},"强制搅拌",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":190,"analysis":37},1111381,"粉喷桩施工中固化剂宜采用的材料有（ ）。",[587,589,591,592,593],{"key":20,"text":588,"correct":35},"粗砂",{"key":24,"text":590,"correct":22},"水泥",{"key":27,"text":566,"correct":22},{"key":30,"text":568,"correct":35},{"key":33,"text":594,"correct":35},"石屑",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":205,"analysis":37},1111382,"真空预压处理软基施工中，可停止抽气的条件有（ ）。",[599,601,603,605,607],{"key":20,"text":600,"correct":22},"连续5个昼夜实测沉降速率小于或等于0.5mm\u002Fd",{"key":24,"text":602,"correct":22},"满足工程对沉降、承载力的要求",{"key":27,"text":604,"correct":22},"地基固结度达到设计要求的80%以上",{"key":30,"text":606,"correct":35},"连续24h实测沉降速率为0mm\u002Fd",{"key":33,"text":608,"correct":35},"真空泵空抽时达到95kPa以上的真空吸力",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":623,"analysis":37},1111383,"袋装砂井施工中桩体可采用的材料有（ ）。",[613,615,617,619,621],{"key":20,"text":614,"correct":22},"聚丙烯编织料制成的袋",{"key":24,"text":616,"correct":35},"石粉",{"key":27,"text":618,"correct":22},"渗透率高的风干中粗砂",{"key":30,"text":620,"correct":35},"细砂",{"key":33,"text":622,"correct":35},"粉砂","AC",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":90,"analysis":37},1111384,"关于软基处理中竖向排水体的说法，正确的有（ ）。",[628,630,632,634,636],{"key":20,"text":629,"correct":22},"竖向排水体可采用袋装砂井和塑料排水板",{"key":24,"text":631,"correct":35},"袋装砂井宜采用矩形套管",{"key":27,"text":633,"correct":22},"竖向排水体可按正方形或等边三角形布置",{"key":30,"text":635,"correct":22},"袋装砂井和塑料排水板可采用沉管式打桩机施工",{"key":33,"text":637,"correct":22},"塑料排水板宜采用矩形套管，也可采用圆形套管",{"id":639,"libraryId":5,"type":15,"typeLabel":16,"stem":640,"options":641,"answer":190,"analysis":37},1111385,"稳定斜坡上地基表层的处理，应符合的要求有（ ）。",[642,644,646,648,650],{"key":20,"text":643,"correct":35},"地面横坡水平时，可直接在天然地面上填筑路堤",{"key":24,"text":645,"correct":22},"地面横坡缓于1：5时，清除地表草皮、腐殖土后，可直接在天然地面上填筑路堤",{"key":27,"text":647,"correct":22},"地面横坡为1：5～1：2.5时，原地面应挖台阶，台阶宽度不应小于2m",{"key":30,"text":649,"correct":35},"地面横坡为1：5～1：1时，原地面应挖台阶，台阶宽度不应小于1m",{"key":33,"text":651,"correct":35},"地面横坡为1:5～1:2.5时，原地面应挖台阶，台阶宽度不应小于1.5m",{"id":653,"libraryId":5,"type":15,"typeLabel":16,"stem":654,"options":655,"answer":220,"analysis":37},1111386,"关于原地基处理要求正确的有（ ）。",[656,658,660,662,664],{"key":20,"text":657,"correct":22},"原地面为坑，洞，穴等，应在清除沉积物后，用合格填料分层回填，分层压实，压实度符合规定",{"key":24,"text":659,"correct":22},"地面横坡缓于1:5时，清除地表草皮、腐殖土后，可直接在天然地面上填筑路堤",{"key":27,"text":661,"correct":35},"地面横坡为1:5-1:2.5时，原地面应挖台阶，台阶宽度不应小于3m",{"key":30,"text":663,"correct":22},"应将地基表层碾压密实",{"key":33,"text":665,"correct":35},"如对地基表层土进行超挖、分层回填压实，其处理深度小于重型汽车荷载作用的工作区深度",{"id":667,"libraryId":5,"type":15,"typeLabel":16,"stem":668,"options":669,"answer":291,"analysis":37},1111387,"当路堤原地基横坡陡于1:5时，原地基处理正确方式有（ ）。",[670,672,674,676,678],{"key":20,"text":671,"correct":22},"原地基应挖成台阶",{"key":24,"text":673,"correct":22},"台阶宽度不小于2m并予以夯实",{"key":27,"text":675,"correct":35},"原地基应削坡以放缓边坡",{"key":30,"text":677,"correct":35},"原地面铺透水性好的材料",{"key":33,"text":679,"correct":35},"原地面铺水泥砂浆",{"id":681,"libraryId":5,"type":15,"typeLabel":16,"stem":682,"options":683,"answer":694,"analysis":37},1111388,"对于原地基处理的要求的说法正确的有（ ）。",[684,686,688,690,692],{"key":20,"text":685,"correct":22},"二级及二级以上公路路堤和填方高度小于1m的公路路堤，应将路基基底范围内的树根全部挖除并将坑穴填平夯实；取土坑范围内的树根应全部挖除。",{"key":24,"text":687,"correct":22},"当地下水影响路堤稳定时，应采取拦截引排地下水或在路堤底部填筑渗水性好的材料等措施。地下水位较高时，应按设计要求进行处理。",{"key":27,"text":689,"correct":35},"地面横坡缓于1.:4时，清除地表草皮、腐殖土后，可直接在天然地面上填筑路堤。",{"key":30,"text":691,"correct":35},"地面横坡陡于1:5地段的陡坡路堤，必须检算路堤整体沿基底及基底下软弱层滑动的稳定性，抗滑稳定系数不得小于规范规定，否则应采取改善基底条件或设置支挡结构物等防滑措施。",{"key":33,"text":693,"correct":22},"地面横坡为1:3～1:2.5时，原地面应挖台阶，台阶宽度不应小于2m。当基岩面上的覆盖层较薄时，宜先清除覆盖层再挖台阶；当覆盖层较厚且稳定时，可予保留。","ABE",{"id":696,"libraryId":5,"type":15,"typeLabel":16,"stem":697,"options":698,"answer":220,"analysis":37},1111389,"土质路堤地表层处理中，需将树根全部挖除的范围有（ ）。",[699,701,703,705,707],{"key":20,"text":700,"correct":22},"二级及二级以上公路路堤基底范围内",{"key":24,"text":702,"correct":22},"高度小于1m的公路路堤基底范围内",{"key":27,"text":704,"correct":35},"高度大于1m的公路路堤基底范围内",{"key":30,"text":706,"correct":22},"取土坑范围内",{"key":33,"text":708,"correct":35},"弃土场范围",{"id":710,"libraryId":5,"type":15,"typeLabel":16,"stem":711,"options":712,"answer":51,"analysis":37},1111390,"关于土质路堤地基表层处理要求的说法，正确的有（ ）。",[713,715,716,718,720],{"key":20,"text":714,"correct":35},"二级与二级以上公路路堤和填方高度小于10m的公路路堤，应将路基基底范围内的树根全部挖除并将坑穴填平夯实",{"key":24,"text":659,"correct":22},{"key":27,"text":717,"correct":22},"地面横坡为1:5～1:2.5时，原地面应挖台阶，台阶宽度不应小于2m",{"key":30,"text":719,"correct":22},"地面横坡陡于1:2.5地段的陡坡路基，必须检算路堤整体沿基底及基底下软弱层滑动的稳定性，抗滑稳定系数不得小于规范规定",{"key":33,"text":721,"correct":22},"在一般土质地段，高速公路、一级公路和二级公路基底的压实度（重型）不应小于90%",[723,727,730,733,736,739],{"id":724,"name":725,"category":7,"favorite":726},1,"领导干部任职前廉政法规知识测试题",92,{"id":728,"name":729,"category":7,"favorite":724},595,"建筑结构与设备",{"id":731,"name":732,"category":7,"favorite":724},715,"招标采购专业知识与法律法规",{"id":734,"name":735,"category":7,"favorite":724},848,"市政方向-通用基础",{"id":737,"name":738,"category":7,"favorite":8},534,"BIM工程师",{"id":740,"name":738,"category":7,"favorite":8},535]