[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":721},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,23,50,1644,[13,38,53,68,83,97,112,126,141,155,170,184,199,213,228,242,255,270,284,298,312,323,336,351,365,380,395,410,424,439,453,467,481,495,509,521,536,550,560,571,583,594,609,623,637,651,665,679,693,707],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1111291,2,"多选题","关于一般分包的说法中，错误的有（）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","分包单位由业主或监理工程师选择",true,{"key":24,"text":25,"correct":26},"B","分包合同须事先征得监理工程师的书面批准",false,{"key":28,"text":29,"correct":26},"C","承包商不能将全部工程分包出去",{"key":31,"text":32,"correct":22},"D","若非分包商原因造成分包商的损失，分包商有权向监理工程师提出索赔要求",{"key":34,"text":35,"correct":22},"E","承包商在分包合同中可以转移部分责任义务给分包商，因此监理工程师应相应解除承包商承担的该部分责任和义务","ADE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1111292,"施工机械不变费用包括（）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"折旧费",{"key":24,"text":45,"correct":26},"机驾人员工资",{"key":28,"text":47,"correct":22},"维修费",{"key":31,"text":49,"correct":26},"车船使用费",{"key":34,"text":51,"correct":22},"安装拆卸及辅助设施费","ACE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1111293,"公路工程进度计划的检查结果可以通过（）体现和分析。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"横道图法",{"key":24,"text":60,"correct":26},"控制图",{"key":28,"text":62,"correct":22},"网络计划图",{"key":31,"text":64,"correct":22},"S曲线",{"key":34,"text":66,"correct":22},"香蕉曲线","ACDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1111294,"施工方案优化主要包括（）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"方法优化",{"key":24,"text":75,"correct":22},"顺序优化",{"key":28,"text":77,"correct":22},"作业组织形式的优化",{"key":31,"text":79,"correct":22},"劳动组织优化",{"key":34,"text":81,"correct":26},"资源利用的优化","ABCD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":67,"analysis":37},1111295,"沥青混凝土拌合站需要设置的标识牌主要内容包括（）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"材料标识牌",{"key":24,"text":90,"correct":26},"材料单价",{"key":28,"text":92,"correct":22},"混凝土配合比设计",{"key":31,"text":94,"correct":22},"消防保卫牌",{"key":34,"text":96,"correct":22},"操作规程",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1111296,"关于拌合站水泥混凝土拌合设备的要求，正确的有（）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"拌合设备应采用质量法自动计量设备",{"key":24,"text":104,"correct":22},"减水剂应采用全自动电子称量设备",{"key":28,"text":106,"correct":26},"拌合用水应采用流量计计量",{"key":31,"text":108,"correct":22},"混凝土拌合应采用强制式拌合机",{"key":34,"text":110,"correct":26},"缓凝剂应采用流量计计量","ABD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":67,"analysis":37},1111297,"材料的单价包括（）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"材料采购单价",{"key":24,"text":119,"correct":26},"场内运输损耗",{"key":28,"text":121,"correct":22},"采购及保管费",{"key":31,"text":123,"correct":22},"运杂费",{"key":34,"text":125,"correct":22},"场外运输损耗",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1111298,"从项目管理的角度出发，标后预算总费用可划分为（）。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"项目预算总成本",{"key":24,"text":133,"correct":22},"上缴企业费用",{"key":28,"text":135,"correct":22},"税金",{"key":31,"text":137,"correct":26},"工程建设其他费用",{"key":34,"text":139,"correct":26},"设备工具器具及家具购置费","ABC",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":82,"analysis":37},1111299,"有关路基土石方施工安全要求正确的有（）。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"取土场底部应平顺并设有排水设施，周围设置警示标志和防护设施",{"key":24,"text":148,"correct":22},"地面横坡陡于1：10时，取土坑应设在路堤上部",{"key":28,"text":150,"correct":22},"取土坑与路基坡脚表面应设1%～2%向外倾斜的横坡",{"key":31,"text":152,"correct":22},"路基范围内暂时不能迁移的结构物应预留台阶，并设警示标志",{"key":34,"text":154,"correct":26},"土方开挖必须自下而上顺序放坡进行，严禁挖空底脚",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},1111300,"在生产事故应急救援预案中，应急响应分级的依据主要有（）。",[159,161,163,165,167],{"key":20,"text":160,"correct":26},"事故发生所在地行政区域",{"key":24,"text":162,"correct":22},"事故危害程度",{"key":28,"text":164,"correct":22},"事故影响范围",{"key":31,"text":166,"correct":26},"发生事故的工程合同金额",{"key":34,"text":168,"correct":22},"单位控制事态的能力","BCE",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":67,"analysis":37},1111301,"施工单位在工程中使用（）前，应当组织有关单位进行验收，或者委托具有相应资质的检验检测机构进行验收。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"翻模",{"key":24,"text":177,"correct":26},"施工测量仪器",{"key":28,"text":179,"correct":22},"整体提升式脚手架",{"key":31,"text":181,"correct":22},"滑模、爬模",{"key":34,"text":183,"correct":22},"自行设计的挂篮",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},1111302,"水泥混凝土桥面铺装实测项目中，属于关键项目的有（）。",[188,190,192,194,196],{"key":20,"text":189,"correct":26},"横坡度",{"key":24,"text":191,"correct":22},"平整度",{"key":28,"text":193,"correct":22},"强度",{"key":31,"text":195,"correct":22},"厚度",{"key":34,"text":197,"correct":26},"中线平面偏位","BCD",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":67,"analysis":37},1111303,"成本控制的方法有（）。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"以目标成本控制成本支出",{"key":24,"text":206,"correct":26},"以成本计划编制控制成本支出",{"key":28,"text":208,"correct":22},"以施工方案控制资源消耗",{"key":31,"text":210,"correct":22},"用净值法进行工期成本的同步控制",{"key":34,"text":212,"correct":22},"运用目标管理控制工程成本",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":227,"analysis":37},1111304,"计日工是指在工程实施过程中，业主有一些临时性的或新增加的项目需要按计日使用人工和（）所需的费用。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"材料",{"key":24,"text":220,"correct":26},"延长工期",{"key":28,"text":222,"correct":26},"风险",{"key":31,"text":224,"correct":26},"资金周转",{"key":34,"text":226,"correct":22},"施工机械","AE",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":67,"analysis":37},1111305,"工程量清单中有标价的单价或总额包括了工、料、机、管理、利润、缺陷修复、税金等费用，以及合同中明示或暗示的所有（）。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"责任",{"key":24,"text":235,"correct":26},"权利",{"key":28,"text":237,"correct":22},"义务",{"key":31,"text":239,"correct":22},"保险",{"key":34,"text":241,"correct":22},"一般风险",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":82,"analysis":37},1111306,"施工机械使用费中的不变费用包括（）。",[246,247,249,251,253],{"key":20,"text":43,"correct":22},{"key":24,"text":248,"correct":22},"大修理费",{"key":28,"text":250,"correct":22},"经常修理费",{"key":31,"text":252,"correct":22},"安装拆卸及辅助设置费",{"key":34,"text":254,"correct":26},"养路费及车船使用税",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":269,"analysis":37},1111307,"专项应急预案是为应对（）制定的专项性工作方案。",[259,261,263,265,267],{"key":20,"text":260,"correct":22},"事故类别",{"key":24,"text":262,"correct":22},"危险源",{"key":28,"text":264,"correct":26},"装置",{"key":31,"text":266,"correct":26},"场所",{"key":34,"text":268,"correct":22},"生产设施","ABE",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":82,"analysis":37},1111308,"专项施工方案的内容有（）。",[274,276,278,280,282],{"key":20,"text":275,"correct":22},"工程概况与编制依据",{"key":24,"text":277,"correct":22},"施工计划",{"key":28,"text":279,"correct":22},"施工工艺技术",{"key":31,"text":281,"correct":22},"施工安全保证措施",{"key":34,"text":283,"correct":26},"工程估算及附图",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":82,"analysis":37},1111309,"对专项风险等级在Ⅲ级及以上的施工，应明确重大风险源的（）。",[288,290,292,294,296],{"key":20,"text":289,"correct":22},"监测",{"key":24,"text":291,"correct":22},"控制",{"key":28,"text":293,"correct":22},"预警措施",{"key":31,"text":295,"correct":22},"应急预案",{"key":34,"text":297,"correct":26},"评估",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":67,"analysis":37},1111310,"根据《公路工程施工安全技术规范》，需编制专项施工方案的大型临时工程有（）。",[302,304,306,308,310],{"key":20,"text":303,"correct":22},"围堰工程",{"key":24,"text":305,"correct":26},"施工便涵",{"key":28,"text":307,"correct":22},"挂篮",{"key":31,"text":309,"correct":22},"便桥",{"key":34,"text":311,"correct":22},"水上作业平台",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":111,"analysis":37},1111311,"级配碎石基层质量检测应实测（）。",[316,318,319,321,322],{"key":20,"text":317,"correct":22},"横坡",{"key":24,"text":191,"correct":22},{"key":28,"text":320,"correct":26},"渗水系数",{"key":31,"text":195,"correct":22},{"key":34,"text":197,"correct":26},{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":335,"analysis":37},1111312,"土方路基在质量检验的检测项目有（）。",[327,329,331,333,334],{"key":20,"text":328,"correct":22},"边坡坡度",{"key":24,"text":330,"correct":22},"弯沉",{"key":28,"text":332,"correct":26},"边坡平顺度",{"key":31,"text":195,"correct":26},{"key":34,"text":193,"correct":26},"AB",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":350,"analysis":37},1111313,"在薄壁墩与实心墩施工中，其控制要点不同之处有（）。",[340,342,344,346,348],{"key":20,"text":341,"correct":22},"墩身与承台联结处混凝土裂缝控制",{"key":24,"text":343,"correct":26},"模板接缝错台控制",{"key":28,"text":345,"correct":22},"墩顶实心段混凝土裂缝控制",{"key":31,"text":347,"correct":26},"墩顶支座预埋件位置、数量控制",{"key":34,"text":349,"correct":26},"墩身锚固钢筋预埋质量控制","AC",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":335,"analysis":37},1111314,"下列行为中，属于转包的有（）。",[355,357,359,361,363],{"key":20,"text":356,"correct":22},"承包人将承包的全部工程发包给他人的",{"key":24,"text":358,"correct":22},"承包人将承包的全部工程肢解后以分包的名义分别发包给他人的",{"key":28,"text":360,"correct":26},"承包人将工程分包给不具备相应资格的企业或者个人的",{"key":31,"text":362,"correct":26},"分包人以他人名义承揽分包工程的",{"key":34,"text":364,"correct":26},"分包合同未报发包人备案的",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":379,"analysis":37},1111315,"公路工程竣工验收必须具备的条件有（）。",[369,371,373,375,377],{"key":20,"text":370,"correct":22},"经过交工验收各标段均达到合格以上的工程",{"key":24,"text":372,"correct":22},"对未完工程或交工验收时提出的修复、补救工程已处理完毕，并经监理工程师和质量监督部门检验合格",{"key":28,"text":374,"correct":22},"按国家《基本建设项目档案资料管理暂行规定》和相关要求已编制完成竣工文件",{"key":31,"text":376,"correct":26},"施工单位机械设备全部退场",{"key":34,"text":378,"correct":22},"施工、监理、设计、建设、监督等单位已编写完成汇报材料","ABCE",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":394,"analysis":37},1111316,"下列关于市场主体行为管理说法中，错误的有（）。",[384,386,388,390,392],{"key":20,"text":385,"correct":26},"施工、监理单位依法确定属于项目施工应具备的条件",{"key":24,"text":387,"correct":22},"项目法人可要求更改合同工期",{"key":28,"text":389,"correct":22},"监理工作可进行分包",{"key":31,"text":391,"correct":26},"所有分包合同都须经监理审查",{"key":34,"text":393,"correct":26},"任何单位和个人不得指定分包","BC",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":409,"analysis":37},1111317,"公路建设市场信用包括公路建设从业单位的（）。",[399,401,403,405,407],{"key":20,"text":400,"correct":22},"不良行为信息",{"key":24,"text":402,"correct":22},"表彰奖励类良好行为信息",{"key":28,"text":404,"correct":26},"自有及租赁设备基本情况",{"key":31,"text":406,"correct":22},"资质、资格情况",{"key":34,"text":408,"correct":22},"信用评价信息","ABDE",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":36,"analysis":37},1111318,"公路工程交工验收应具备的条件包括（）。",[414,416,418,420,422],{"key":20,"text":415,"correct":22},"监理单位对工程质量评定合格",{"key":24,"text":417,"correct":26},"通车试运营已满2年",{"key":28,"text":419,"correct":26},"工程决算编制完成",{"key":31,"text":421,"correct":22},"合同约定的各项内容已全部完成",{"key":34,"text":423,"correct":22},"施工单位、监理单位已完成本合同段的工作总结",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":438,"analysis":37},1111319,"关于公路工程竣（交）工验收的说法，正确的有（）。",[428,430,432,434,436],{"key":20,"text":429,"correct":26},"竣工验收委员会由交通运输主管部门、项目法人、质量监督机构等单位代表组成",{"key":24,"text":431,"correct":22},"通车试运营2年以上方可进行竣工验收",{"key":28,"text":433,"correct":26},"竣工验收质量等级评定分为合格和不合格",{"key":31,"text":435,"correct":22},"通过交工验收的合同段，项目法人应及时颁发“公路工程交工验收证书”",{"key":34,"text":437,"correct":22},"批准的项目建议书是竣工验收的重要依据","BDE",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":269,"analysis":37},1111320,"下列属于项目负责人履行的职责有（ ）。",[443,445,447,449,451],{"key":20,"text":444,"correct":22},"建立项目安全生产责任制，实施相应的考核与奖惩",{"key":24,"text":446,"correct":22},"组织制定项目安全生产教育和培训计划",{"key":28,"text":448,"correct":26},"检查施工现场的安全生产状况，做好检查记录",{"key":31,"text":450,"correct":26},"制止和纠正违章指挥、违章操作和违反纪律的行为",{"key":34,"text":452,"correct":22},"及时如实报告生产安全事故并组织自救",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":379,"analysis":37},1111321,"可承担单跨100m桥梁工程的施工的企业包括（ ）。",[457,459,461,463,465],{"key":20,"text":458,"correct":22},"公路工程施工总承包特级",{"key":24,"text":460,"correct":22},"桥梁工程专业承包一级",{"key":28,"text":462,"correct":22},"桥梁工程专业承包二级",{"key":31,"text":464,"correct":26},"桥梁工程专业承包三级",{"key":34,"text":466,"correct":22},"公路工程施工总承包一级",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":140,"analysis":37},1111322,"路基施工检测时，常用的弯沉值测试方法有（ ）。",[471,473,475,477,479],{"key":20,"text":472,"correct":22},"贝克曼梁法",{"key":24,"text":474,"correct":22},"自动弯沉仪法",{"key":28,"text":476,"correct":22},"落锤弯沉仪法",{"key":31,"text":478,"correct":26},"核子密度湿度仪法",{"key":34,"text":480,"correct":26},"触探仪法",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":198,"analysis":37},1111323,"下列关于落锤弯沉仪法特点的叙述中，正确的有（ ）。",[485,487,489,491,493],{"key":20,"text":486,"correct":26},"属于静态测试",{"key":24,"text":488,"correct":22},"能反算路面的回弹模量",{"key":28,"text":490,"correct":22},"属于动态弯沉",{"key":31,"text":492,"correct":22},"能快速连续测定",{"key":34,"text":494,"correct":26},"检测速度慢",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":140,"analysis":37},1111324,"在压实度现场密度的测定方法中，关于核子密度湿度仪法叙述有误的是（ ）。",[499,501,503,505,507],{"key":20,"text":500,"correct":22},"适用于细粒土的密度测试",{"key":24,"text":502,"correct":22},"测定时，测试员打开仪器应退出3m之外",{"key":28,"text":504,"correct":22},"利用灌砂测定现场挖坑的体积，并计算其密度",{"key":31,"text":506,"correct":26},"利用放射性元素测定路面材料的密实度和含水量",{"key":34,"text":508,"correct":26},"用直接透射法测定时，应将放射源棒放入已预先打好的孔内",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":269,"analysis":37},1111325,"可以用于长度为2600M的土方填方路段，填方高度在0.5～3M之间，沿线设涵洞、倒虹吸等构筑物的现场压实度测定的方法有（ ）。",[513,515,517,518,520],{"key":20,"text":514,"correct":22},"灌砂法",{"key":24,"text":516,"correct":22},"环刀法",{"key":28,"text":472,"correct":26},{"key":31,"text":519,"correct":26},"落锺仪法",{"key":34,"text":478,"correct":22},{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":535,"analysis":37},1111326,"路基施工中，测定土的最佳含水量通常的方法有（ ）。",[525,527,529,531,533],{"key":20,"text":526,"correct":22},"击实试验",{"key":24,"text":528,"correct":26},"辗压实验",{"key":28,"text":530,"correct":22},"振动台法",{"key":31,"text":532,"correct":22},"表面振动击实仪法",{"key":34,"text":534,"correct":26},"固结仪法","ACD",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":335,"analysis":37},1111327,"某山区高速公路，横断面边桩放样的方法有（ ）。",[540,542,544,546,548],{"key":20,"text":541,"correct":22},"渐近法",{"key":24,"text":543,"correct":22},"坐标法",{"key":28,"text":545,"correct":26},"图解法",{"key":31,"text":547,"correct":26},"计算法",{"key":34,"text":549,"correct":26},"偏角法",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":269,"analysis":37},1111328,"路基施工中，中线放样的方法有（ ）。",[554,556,557,558,559],{"key":20,"text":555,"correct":22},"切线支距法",{"key":24,"text":549,"correct":22},{"key":28,"text":541,"correct":26},{"key":31,"text":545,"correct":26},{"key":34,"text":543,"correct":22},{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":438,"analysis":37},1111329,"路基施工的测量方法中，中线测量的方法有（ ）。",[564,566,567,569,570],{"key":20,"text":565,"correct":26},"导线法",{"key":24,"text":555,"correct":22},{"key":28,"text":568,"correct":26},"闭合法",{"key":31,"text":549,"correct":22},{"key":34,"text":543,"correct":22},{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":582,"analysis":37},1111330,"公路工程施工测量方法传统法放样包括（ ）",[575,576,577,579,580],{"key":20,"text":543,"correct":26},{"key":24,"text":555,"correct":22},{"key":28,"text":578,"correct":26},"直线法",{"key":31,"text":549,"correct":22},{"key":34,"text":581,"correct":26},"偏转法","BD",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":335,"analysis":37},1111331,"某山区高速公路，中线放样的方法有（ ）。",[587,589,590,591,592],{"key":20,"text":588,"correct":22},"GPS-RTK法",{"key":24,"text":543,"correct":22},{"key":28,"text":541,"correct":26},{"key":31,"text":549,"correct":26},{"key":34,"text":593,"correct":26},"支距法",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":608,"analysis":37},1111332,"采用灌砂法进行压实密度检测，需要的仪器有（ ）。",[598,600,602,604,606],{"key":20,"text":599,"correct":26},"环刀",{"key":24,"text":601,"correct":22},"含水量测定器具",{"key":28,"text":603,"correct":22},"基板",{"key":31,"text":605,"correct":22},"灌砂筒",{"key":34,"text":607,"correct":22},"天平","BCDE",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":409,"analysis":37},1111333,"预防路基网裂措施有（ ）。",[613,615,617,619,621],{"key":20,"text":614,"correct":22},"保证设备匹配合理",{"key":24,"text":616,"correct":22},"控制填土最佳含水量时碾压",{"key":28,"text":618,"correct":26},"选用塑性指数大的土填筑路基",{"key":31,"text":620,"correct":22},"掺加石灰改性处理措施",{"key":34,"text":622,"correct":22},"掺加水泥改性处理措施",{"id":624,"libraryId":5,"type":15,"typeLabel":16,"stem":625,"options":626,"answer":379,"analysis":37},1111334,"某平原地区路基填筑，为预防路基边坡病害，可采取的措施有（ ）。",[627,629,631,633,635],{"key":20,"text":628,"correct":22},"酌情控制填土速率",{"key":24,"text":630,"correct":22},"路基填筑过程中严格控制有效宽度",{"key":28,"text":632,"correct":22},"加强地表水、地下水的排除",{"key":31,"text":634,"correct":26},"采用纵向水平分层法施工",{"key":34,"text":636,"correct":22},"掺加稳定剂提高路基层位强度",{"id":638,"libraryId":5,"type":15,"typeLabel":16,"stem":639,"options":640,"answer":379,"analysis":37},1111335,"路基行车带压实度不足的原因有（ ）。",[641,643,645,647,649],{"key":20,"text":642,"correct":22},"不同类别土混填",{"key":24,"text":644,"correct":22},"填土颗粒过大（>10cm）",{"key":28,"text":646,"correct":22},"含水量偏离最佳含水量",{"key":31,"text":648,"correct":26},"压实遍数过多",{"key":34,"text":650,"correct":22},"碾压不均匀，局部有漏压现象",{"id":652,"libraryId":5,"type":15,"typeLabel":16,"stem":653,"options":654,"answer":438,"analysis":37},1111336,"导致路基压实度不能满足质量标准要求，甚至局部出现“弹簧”现象的原因是（ ）。",[655,657,659,661,663],{"key":20,"text":656,"correct":26},"对填土掺加生石灰",{"key":24,"text":658,"correct":22},"压路机吨位偏小",{"key":28,"text":660,"correct":26},"碾压轮印重叠",{"key":31,"text":662,"correct":22},"含水量大于最佳含水量",{"key":34,"text":664,"correct":22},"没有对上一层表面浮土或松软层进行处治",{"id":666,"libraryId":5,"type":15,"typeLabel":16,"stem":667,"options":668,"answer":608,"analysis":37},1111337,"加筋土挡土墙的施工主要工序有（ ）。",[669,671,673,675,677],{"key":20,"text":670,"correct":26},"肋柱安装",{"key":24,"text":672,"correct":22},"填料填筑与压实",{"key":28,"text":674,"correct":22},"地基处理",{"key":31,"text":676,"correct":22},"筋带铺设",{"key":34,"text":678,"correct":22},"基槽（坑.）开挖",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":582,"analysis":37},1111338,"加筋土挡土墙的组成有（ ）。",[683,685,687,689,691],{"key":20,"text":684,"correct":26},"墙身",{"key":24,"text":686,"correct":22},"墙面板",{"key":28,"text":688,"correct":26},"基础",{"key":31,"text":690,"correct":22},"拉筋",{"key":34,"text":692,"correct":26},"排水设施",{"id":694,"libraryId":5,"type":15,"typeLabel":16,"stem":695,"options":696,"answer":82,"analysis":37},1111339,"重力式挡土墙墙背形式可分为（ ）。",[697,699,701,703,705],{"key":20,"text":698,"correct":22},"俯斜",{"key":24,"text":700,"correct":22},"仰斜",{"key":28,"text":702,"correct":22},"衡重式",{"key":31,"text":704,"correct":22},"凸形折线",{"key":34,"text":706,"correct":26},"锚杆式",{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":409,"analysis":37},1111340,"重力式挡土墙的优点有（ ）。",[711,713,715,717,719],{"key":20,"text":712,"correct":22},"适应性强",{"key":24,"text":714,"correct":22},"就地取材",{"key":28,"text":716,"correct":26},"墙身截面大",{"key":31,"text":718,"correct":22},"施工方便",{"key":34,"text":720,"correct":22},"形式简单",[722,726,729,732,735,738],{"id":723,"name":724,"category":7,"favorite":725},1,"领导干部任职前廉政法规知识测试题",92,{"id":727,"name":728,"category":7,"favorite":723},595,"建筑结构与设备",{"id":730,"name":731,"category":7,"favorite":723},715,"招标采购专业知识与法律法规",{"id":733,"name":734,"category":7,"favorite":723},848,"市政方向-通用基础",{"id":736,"name":737,"category":7,"favorite":8},534,"BIM工程师",{"id":739,"name":737,"category":7,"favorite":8},535]