[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":739},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,22,50,1644,[13,38,52,67,82,97,112,127,142,156,171,186,201,215,230,244,258,273,288,302,316,329,344,358,372,386,400,414,428,443,457,471,485,500,514,528,542,556,570,584,598,612,626,640,654,668,682,697,711,725],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1111240,2,"多选题","符合下列情况之一时，应在沥青面层上铺筑上封层（）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","需加铺磨耗层改善抗滑性能的旧沥青路面",true,{"key":24,"text":25,"correct":26},"B","半刚性基层上铺筑沥青层",false,{"key":28,"text":29,"correct":22},"C","沥青面层空隙较大，透水严重",{"key":31,"text":32,"correct":26},"D","在铺筑基层后，不能及时铺筑沥青面层，且须开放交通",{"key":34,"text":35,"correct":26},"E","水泥混凝土路面上铺筑沥青层","AC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":36,"analysis":37},1111241,"桥下净空高度是（）至桥跨结构最下缘间的距离。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"设计洪水位",{"key":24,"text":45,"correct":26},"低水位",{"key":28,"text":47,"correct":22},"计算通航水位",{"key":31,"text":49,"correct":26},"高水位",{"key":34,"text":51,"correct":26},"桥下线路路面",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":66,"analysis":37},1111242,"预应力筋的下料，应采用（）切断。",[56,58,60,62,64],{"key":20,"text":57,"correct":22},"切断机",{"key":24,"text":59,"correct":22},"砂轮锯",{"key":28,"text":61,"correct":26},"电弧",{"key":31,"text":63,"correct":26},"电焊抢",{"key":34,"text":65,"correct":26},"乙炔-氧气","AB",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1111243,"锚具夹具进场时，除型号、规格外，还需进行（）验收。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"外观检查",{"key":24,"text":74,"correct":22},"硬度检验",{"key":28,"text":76,"correct":22},"静载锚固性能试验",{"key":31,"text":78,"correct":26},"伸长率",{"key":34,"text":80,"correct":26},"强度","ABC",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1111244,"锚锭施工进行温度控制，防止混凝土开裂的措施有（）。",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"采用高水化热品种的水泥",{"key":24,"text":89,"correct":22},"降低水泥用量、减少水化热，掺入质量符合要求的粉煤灰和缓凝型外掺剂",{"key":28,"text":91,"correct":22},"降低混凝土入仓温度",{"key":31,"text":93,"correct":22},"在混凝土结构中布置冷却水管",{"key":34,"text":95,"correct":22},"采用分层施工","BCDE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1111245,"预应力混凝土张拉用的千斤顶与压力表应配套标定、配套使用，其重新进行标定的条件包括（）。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"使用时间超过3个月",{"key":24,"text":104,"correct":22},"张拉次数超过300次",{"key":28,"text":106,"correct":22},"使用过程中千斤顶或压力表出现异常情况",{"key":31,"text":108,"correct":22},"千斤顶检修或更换配件后",{"key":34,"text":110,"correct":26},"千斤顶表面锈蚀","BCD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1111246,"下列情形中，可能导致钻孔灌注桩断桩的有（）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"集料级配差，混凝土和易性差",{"key":24,"text":119,"correct":22},"导管埋深过大，管口混凝土已凝固",{"key":28,"text":121,"correct":22},"混凝土浇筑时间超过混凝土初凝时间",{"key":31,"text":123,"correct":22},"混凝土浇筑过程中导管埋置深度偏小",{"key":34,"text":125,"correct":26},"在钢筋笼制作时，采用对焊连接钢筋","ABCD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1111247,"对模板、支架和拱架拆除的技术要求，描述正确的是（）。",[131,133,135,137,139],{"key":20,"text":132,"correct":26},"模板拆除应按先支先拆，后支后拆的顺序，拆时严禁抛扔",{"key":24,"text":134,"correct":26},"对预应力混凝土结构，模板应在预应力张拉完成后拆除",{"key":28,"text":136,"correct":22},"卸落支架和拱架应在纵向应对称均衡卸落，在横向应同时一起卸落",{"key":31,"text":138,"correct":22},"简支梁、连续梁宜从跨中向支座依次循环卸落",{"key":34,"text":140,"correct":22},"悬臂梁应先卸挂梁及悬臂的支架，再卸无铰跨内的支架。","CDE",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":36,"analysis":37},1111248,"关于普通钢筋焊接施工的说法，正确的有（）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"接头采用搭接电弧焊时，应使接合钢筋轴线一致",{"key":24,"text":149,"correct":26},"接头搭接双面焊时，两钢筋不得弯折，应直接紧贴焊接",{"key":28,"text":151,"correct":22},"焊接接头应设置在弯矩、剪力较小断面",{"key":31,"text":153,"correct":26},"接头应集中布置在内力较小的同一断面内",{"key":34,"text":155,"correct":26},"单面焊缝的长度不应小于5d（d为钢筋直径）",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},1111249,"每批钢绞线应分批验收，验收时除应对其质量证明书、包装、标志和规格等进行检查外，还应检查（）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"表面质量",{"key":24,"text":163,"correct":26},"运输方式",{"key":28,"text":165,"correct":22},"直径偏差",{"key":31,"text":167,"correct":26},"单价",{"key":34,"text":169,"correct":22},"力学性能试验","ACE",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},1111250,"关于桥梁混凝土施工的说法，正确的是（）。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"从各种组成材料中引入的氯离子含量大于规定限值时，宜在混凝土中采取掺加阻锈剂、增加保护层厚度等措施防腐",{"key":24,"text":178,"correct":26},"钢筋混凝土结构应优先选用氯盐类混凝土外加剂",{"key":28,"text":180,"correct":22},"混凝土抗压强度评定试件应采用标准条件养护",{"key":31,"text":182,"correct":22},"应在搅拌地点与浇筑地点分别取样检测混凝土拌合物的坍落度",{"key":34,"text":184,"correct":26},"泵送混凝土适配的坍落度值应为入泵时的坍落度","ACD",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":200,"analysis":37},1111251,"旋挖钻机一般使用的地质层包括（）。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"黏土层",{"key":24,"text":193,"correct":26},"微风化玄武岩层",{"key":28,"text":195,"correct":26},"微风化花岗岩层",{"key":31,"text":197,"correct":22},"淤泥土层",{"key":34,"text":199,"correct":22},"碎石土层","ADE",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":200,"analysis":37},1111252,"针对断桩事故，可采取的防治措施有（）。",[205,207,209,211,213],{"key":20,"text":206,"correct":22},"关键设备要有备用以保证混凝土连续灌注",{"key":24,"text":208,"correct":26},"混凝土坍落度要控制在10～14cm",{"key":28,"text":210,"correct":26},"在混凝土中加入减水剂",{"key":31,"text":212,"correct":22},"保证首批混凝土灌注后能埋住导管至少1m",{"key":34,"text":214,"correct":22},"尽量采用大直径导管",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":229,"analysis":37},1111253,"下列关于悬臂浇筑施工错误的说法（）。",[219,221,223,225,227],{"key":20,"text":220,"correct":26},"0号、1号块的施工一般采用扇形托架浇筑",{"key":24,"text":222,"correct":26},"临时固结一般采用在支座两侧临时加预应力筋",{"key":28,"text":224,"correct":22},"合龙顺序应按设计要求办理，设计无要求时，一般先中跨，后次中跨，再边跨。",{"key":31,"text":226,"correct":26},"悬臂浇筑混凝土过程中应对桥梁的中轴线、高程进行测量观测和控制",{"key":34,"text":228,"correct":22},"悬臂浇筑法解除固结采用动态破碎方法","CE",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":81,"analysis":37},1111254,"关于台背及与路堤间的回填施工要求正确的有（）。",[234,236,238,240,242],{"key":20,"text":235,"correct":22},"二级以下公路的路堤与回填的联结部，应按设计要求预留台阶",{"key":24,"text":237,"correct":22},"台背回填部分的路床宜与路堤路床同步填筑",{"key":28,"text":239,"correct":22},"桥台背和锥坡的回填施工宜同步进行",{"key":31,"text":241,"correct":26},"台背和涵洞洞身两侧的填土应分层夯实，其压实度不应小于95%",{"key":34,"text":243,"correct":26},"不得采用石灰土或水泥稳定土回填",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":170,"analysis":37},1111255,"为保证悬臂浇筑钢筋混凝土箱梁梁底高程在设计范围内，下列说法正确的有（）。",[248,250,252,254,256],{"key":20,"text":249,"correct":22},"对挂篮预压消除非弹性变形",{"key":24,"text":251,"correct":26},"选在一天中温度变化较大的时间段进行挠度观测",{"key":28,"text":253,"correct":22},"在0号块上建立相对坐标系，并定期复核",{"key":31,"text":255,"correct":26},"选择先中跨、后边跨的合龙顺序",{"key":34,"text":257,"correct":22},"严格控制施工中不平衡荷载大小与分布",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":272,"analysis":37},1111256,"预应力混凝土梁桥上部结构逐孔施工的方法有（）。",[262,264,266,268,270],{"key":20,"text":263,"correct":22},"移动模架法",{"key":24,"text":265,"correct":26},"悬臂浇筑法",{"key":28,"text":267,"correct":26},"支架现浇法",{"key":31,"text":269,"correct":26},"悬臂拼装法",{"key":34,"text":271,"correct":22},"整孔吊装法","AE",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":287,"analysis":37},1111257,"悬臂拼装法施工中，0号块和1号块之间采用湿接缝处理主要是为了控制该跨节段的（）。",[277,279,281,283,285],{"key":20,"text":278,"correct":26},"挠度",{"key":24,"text":280,"correct":22},"标高",{"key":28,"text":282,"correct":26},"截面尺寸",{"key":31,"text":284,"correct":22},"拼装方向",{"key":34,"text":286,"correct":26},"施工不平衡荷载","BD",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":96,"analysis":37},1111258,"悬臂浇筑法施工刚构桥的挂篮由悬吊系统和（）组成。",[292,294,296,298,300],{"key":20,"text":293,"correct":26},"拱架",{"key":24,"text":295,"correct":22},"主桁架",{"key":28,"text":297,"correct":22},"锚固系统与平衡重",{"key":31,"text":299,"correct":22},"行走系统",{"key":34,"text":301,"correct":22},"工作平台底模架",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":111,"analysis":37},1111259,"能够利用支座上的卸载弯矩来减少跨中弯矩，让梁内力分配更加合理的有（）。",[306,308,310,312,314],{"key":20,"text":307,"correct":26},"简支梁",{"key":24,"text":309,"correct":22},"悬臂梁",{"key":28,"text":311,"correct":22},"固端梁",{"key":31,"text":313,"correct":22},"连续梁",{"key":34,"text":315,"correct":26},"斜拉桥",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":126,"analysis":37},1111260,"模板安装完毕后，应检查（）指标。",[320,322,324,326,328],{"key":20,"text":321,"correct":22},"平面位置",{"key":24,"text":323,"correct":22},"顶部标高",{"key":28,"text":325,"correct":22},"节点联系",{"key":31,"text":327,"correct":22},"纵横向稳定性",{"key":34,"text":80,"correct":26},{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":343,"analysis":37},1111261,"明挖扩大基础施工，其基础的定位放样工作是根据（），推算出基础边线的定位点。",[333,335,337,339,341],{"key":20,"text":334,"correct":26},"基坑中心线",{"key":24,"text":336,"correct":22},"桥梁中心线",{"key":28,"text":338,"correct":26},"基坑高程",{"key":31,"text":340,"correct":26},"桥梁的高度",{"key":34,"text":342,"correct":22},"墩台的纵横轴线","BE",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":96,"analysis":37},1111262,"关于先张法预应力筋张拉操作时的施工要点的说法，正确的有（）。",[348,350,352,354,356],{"key":20,"text":349,"correct":26},"张拉时，同一构件内预应力钢丝、钢绞线不允许出现断丝",{"key":24,"text":351,"correct":22},"横梁须有足够的刚度，受力后挠度应不大于2mm",{"key":28,"text":353,"correct":22},"用横梁整批张拉时，千斤顶应对称布置，防止活动横梁倾斜",{"key":31,"text":355,"correct":22},"张拉时，工作人员不得站在台座两端或进入台座",{"key":34,"text":357,"correct":22},"张拉时，沿台座长度方向每隔4～5m应放一防护架",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":200,"analysis":37},1111263,"关于桥梁“桥头跳车质量通病”防治措施的说法，正确的有（）。",[362,364,366,368,370],{"key":20,"text":363,"correct":22},"路堤施工留有必要的自然固结沉降期",{"key":24,"text":365,"correct":26},"加大台背填土的含水量",{"key":28,"text":367,"correct":26},"桥台基坑采用大型压实机械压实",{"key":31,"text":369,"correct":22},"做好桥头路堤的排水、防水工程",{"key":34,"text":371,"correct":22},"设置桥头搭板",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":170,"analysis":37},1111264,"关于明挖扩大基础施工的说法，正确的有（）。",[376,378,380,382,384],{"key":20,"text":377,"correct":22},"当坑壁不稳定时，应设挡板支撑，稳定坑壁",{"key":24,"text":379,"correct":26},"土质较差且有严重流沙现象时，可设集水坑排水",{"key":28,"text":381,"correct":22},"当基坑为不稳定强风化岩质地基时，可用锚杆挂网喷射混凝土护坡",{"key":31,"text":383,"correct":26},"坑壁边缘的挖掘机作业距坑边缘不少0.5m",{"key":34,"text":385,"correct":22},"采用简易钢板桩进行基坑支护时，基坑开挖深度不宜大于4m",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":36,"analysis":37},1111265,"分段吊装施工连续梁的逐孔施工中，接头位置可以设在（）处。",[390,392,394,396,398],{"key":20,"text":391,"correct":22},"桥墩处",{"key":24,"text":393,"correct":26},"跨中",{"key":28,"text":395,"correct":22},"1\u002F5跨径",{"key":31,"text":397,"correct":26},"1\u002F4跨径",{"key":34,"text":399,"correct":26},"1\u002F2跨径",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":200,"analysis":37},1111266,"地下连续墙适用于（）基础。",[404,406,408,410,412],{"key":20,"text":405,"correct":22},"地下挡土墙",{"key":24,"text":407,"correct":26},"岩溶土层",{"key":28,"text":409,"correct":26},"地下承压水高的土层",{"key":31,"text":411,"correct":22},"竖向和侧向荷载的基础",{"key":34,"text":413,"correct":22},"挡水围堰",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":126,"analysis":37},1111267,"钻孔灌注桩施工中，应先埋设护筒，护筒的作用包括（）。",[418,420,422,424,426],{"key":20,"text":419,"correct":22},"保护孔口地面",{"key":24,"text":421,"correct":22},"隔离地表水",{"key":28,"text":423,"correct":22},"防止坍孔",{"key":31,"text":425,"correct":22},"钻头导向",{"key":34,"text":427,"correct":26},"增大承载能力",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":442,"analysis":37},1111268,"下列后张法预制梁的施工步骤中错误的有（）。",[432,434,436,438,440],{"key":20,"text":433,"correct":22},"梁板的振捣以插入式为主，附着式为辅",{"key":24,"text":435,"correct":26},"张拉机具应配套使用，配套定期标定",{"key":28,"text":437,"correct":22},"预应力张拉以应力控制为主，理论伸长量作为校核",{"key":31,"text":439,"correct":22},"预应力张拉，孔道冲洗后，立即压浆",{"key":34,"text":441,"correct":22},"采用单端压浆，直到另一端流出水泥浆即可","ACDE",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":272,"analysis":37},1111269,"确定套箱围堰的套箱顶标高应考虑（）。",[447,449,451,453,455],{"key":20,"text":448,"correct":22},"浪高",{"key":24,"text":450,"correct":26},"封底混凝土厚度",{"key":28,"text":452,"correct":26},"承台高度",{"key":31,"text":454,"correct":26},"水的浮力",{"key":34,"text":456,"correct":22},"施工期间可能出现的最高水位",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":343,"analysis":37},1111270,"桥梁冬季施工时，施工底模板、支架应考虑的荷载包括（）。",[461,463,465,467,469],{"key":20,"text":462,"correct":26},"汽车荷载",{"key":24,"text":464,"correct":22},"模板、支架及施工人员、材料、机具的重量",{"key":28,"text":466,"correct":26},"新浇筑混凝土对侧模板的压力",{"key":31,"text":468,"correct":26},"倾倒混凝土时产生的水平荷载",{"key":34,"text":470,"correct":22},"可能产生的雪荷载、冬季保温设施荷载",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":170,"analysis":37},1111271,"关于钢筋混凝土梁桥支架施工的说法，正确的有（）。",[475,477,479,481,483],{"key":20,"text":476,"correct":22},"支架预拱度设置应考虑地基的非弹性沉陷",{"key":24,"text":478,"correct":26},"支架应根据荷载大小确定是否需要预压",{"key":28,"text":480,"correct":22},"支架预拱度一般按二次抛物线设置",{"key":31,"text":482,"correct":26},"支架荷载除梁体混凝土重量外，再加上施工荷载及风力作用即可",{"key":34,"text":484,"correct":22},"支架预拱度设置时应考虑张拉上拱的影响",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":499,"analysis":37},1111272,"波形钢涵洞施工主要工序有（）。",[489,491,493,495,497],{"key":20,"text":490,"correct":22},"基坑开挖",{"key":24,"text":492,"correct":22},"防水层施工",{"key":28,"text":494,"correct":26},"安装拱模",{"key":31,"text":496,"correct":22},"安装管身",{"key":34,"text":498,"correct":22},"砌筑圬工基础或现浇混凝土管座基础","ABDE",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":126,"analysis":37},1111274,"隧道光面爆破的主要参数包括（）。",[504,506,508,510,512],{"key":20,"text":505,"correct":22},"周边眼间距",{"key":24,"text":507,"correct":22},"爆破层厚度",{"key":28,"text":509,"correct":22},"周边眼密集系数",{"key":31,"text":511,"correct":22},"周边眼线装药密度",{"key":34,"text":513,"correct":26},"一次爆破断面形状",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":111,"analysis":37},1111275,"适用于双车道公路隧道Ⅴ级围岩地段的施工方法有（）。",[518,520,522,524,526],{"key":20,"text":519,"correct":26},"全断面法",{"key":24,"text":521,"correct":22},"台阶法",{"key":28,"text":523,"correct":22},"环形开挖预留核心土法",{"key":31,"text":525,"correct":22},"侧壁导坑法",{"key":34,"text":527,"correct":26},"中导洞法",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":343,"analysis":37},1111276,"隧道结构是由主体构造物和附属构造物两大类组成，其主体构造物的目的是（）。",[532,534,536,538,540],{"key":20,"text":533,"correct":26},"为运营管理，维修养护隧道",{"key":24,"text":535,"correct":22},"为了保持岩体的稳定",{"key":28,"text":537,"correct":26},"为给水排水、供配电方便",{"key":31,"text":539,"correct":26},"为通风、照明、通信、安全提供保障",{"key":34,"text":541,"correct":22},"为行车安全而修建的人工永久建筑物",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":81,"analysis":37},1111277,"棚式明洞外边墙可以采用（）结构。",[546,548,550,552,554],{"key":20,"text":547,"correct":22},"钢架式",{"key":24,"text":549,"correct":22},"柱式",{"key":28,"text":551,"correct":22},"墙式",{"key":31,"text":553,"correct":26},"连拱式",{"key":34,"text":555,"correct":26},"加筋式",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":81,"analysis":37},1111278,"洞门墙应根据实际需要设置（）。",[560,562,564,566,568],{"key":20,"text":561,"correct":22},"泄水孔",{"key":24,"text":563,"correct":22},"伸缩缝",{"key":28,"text":565,"correct":22},"沉降缝",{"key":31,"text":567,"correct":26},"结构缝",{"key":34,"text":569,"correct":26},"施工缝",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":126,"analysis":37},1111279,"物理勘探法包括有（）。",[574,576,578,580,582],{"key":20,"text":575,"correct":22},"弹性波反射法",{"key":24,"text":577,"correct":22},"地质雷达法",{"key":28,"text":579,"correct":22},"陆地声纳法",{"key":31,"text":581,"correct":22},"红外探测法",{"key":34,"text":583,"correct":26},"超前导洞法",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":126,"analysis":37},1111280,"拱式明洞可分为（）。",[588,590,592,594,596],{"key":20,"text":589,"correct":22},"路堑对称型",{"key":24,"text":591,"correct":22},"路堑偏压型",{"key":28,"text":593,"correct":22},"半路堑偏压型",{"key":31,"text":595,"correct":22},"半路堑单压型",{"key":34,"text":597,"correct":26},"半路堑挡土型",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":111,"analysis":37},1111281,"复合式衬砌隧道的必测项目有（）。",[602,604,606,608,610],{"key":20,"text":603,"correct":26},"围岩体内位移",{"key":24,"text":605,"correct":22},"地表下沉",{"key":28,"text":607,"correct":22},"周边位移",{"key":31,"text":609,"correct":22},"拱顶下沉",{"key":34,"text":611,"correct":26},"锚杆轴力及抗拔力",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":170,"analysis":37},1111282,"路段视频监控系统一般由摄像机、（）等组成。",[616,618,620,622,624],{"key":20,"text":617,"correct":22},"传输通道",{"key":24,"text":619,"correct":26},"会议电视终端装置",{"key":28,"text":621,"correct":22},"监控分中心的视频监视装置",{"key":31,"text":623,"correct":26},"便携式投影机",{"key":34,"text":625,"correct":22},"监控分中心的存储及管理装置",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":111,"analysis":37},1111283,"能标识出道路里程和用地限界的交通设施有（）。",[630,632,634,636,638],{"key":20,"text":631,"correct":26},"交通标志、交通标线",{"key":24,"text":633,"correct":22},"里程标",{"key":28,"text":635,"correct":22},"百米桩",{"key":31,"text":637,"correct":22},"公路界碑",{"key":34,"text":639,"correct":26},"防眩光设施",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":36,"analysis":37},1111284,"公路工程施工项目经理部的组织结构模式，目前主要采用的有（）。",[644,646,648,650,652],{"key":20,"text":645,"correct":22},"直线式",{"key":24,"text":647,"correct":26},"职能式",{"key":28,"text":649,"correct":22},"直线职能式",{"key":31,"text":651,"correct":26},"矩阵式",{"key":34,"text":653,"correct":26},"行列式",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":287,"analysis":37},1111285,"施工方案中资源利用优化主要包括（）。",[658,660,662,664,666],{"key":20,"text":659,"correct":26},"施工方法",{"key":24,"text":661,"correct":22},"物资采购与供应计划",{"key":28,"text":663,"correct":26},"劳动组织",{"key":31,"text":665,"correct":22},"机械需要计划",{"key":34,"text":667,"correct":26},"施工顺序",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":499,"analysis":37},1111286,"根据《公路工程标准施工招标文件》，下列各项构成合同文件的有（）。",[672,674,676,678,680],{"key":20,"text":673,"correct":22},"合同协议书及各种合同附件",{"key":24,"text":675,"correct":22},"投标函及投标函附录",{"key":28,"text":677,"correct":26},"招标文件",{"key":31,"text":679,"correct":22},"中标通知书",{"key":34,"text":681,"correct":22},"已标价工程量清单",{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":696,"analysis":37},1111287,"施工总体部署是施工组织设计的重要内容之一，其主要内容有（）。",[686,688,690,692,694],{"key":20,"text":687,"correct":22},"建立施工管理机构",{"key":24,"text":689,"correct":22},"划分施工任务",{"key":28,"text":691,"correct":26},"编制资源供应计划",{"key":31,"text":693,"correct":22},"安排施工顺序",{"key":34,"text":695,"correct":26},"制定季节性施工技术措施","ABD",{"id":698,"libraryId":5,"type":15,"typeLabel":16,"stem":699,"options":700,"answer":185,"analysis":37},1111288,"属于开工准备阶段测量任务的是（）。",[701,703,705,707,709],{"key":20,"text":702,"correct":22},"施工控制网建立",{"key":24,"text":704,"correct":26},"施工控制网复测",{"key":28,"text":706,"correct":22},"地形地貌复核测量",{"key":31,"text":708,"correct":22},"设计控制桩贯通复测",{"key":34,"text":710,"correct":26},"安全监控测量",{"id":712,"libraryId":5,"type":15,"typeLabel":16,"stem":713,"options":714,"answer":343,"analysis":37},1111289,"根据《公路工程施工安全技术规范》，下面需要组织专家论证的是（）。",[715,717,719,721,723],{"key":20,"text":716,"correct":26},"开挖深度4m的基坑",{"key":24,"text":718,"correct":22},"深度15m人工挖孔桩",{"key":28,"text":720,"correct":26},"水深8m的围堰",{"key":31,"text":722,"correct":26},"悬臂浇筑法挂篮",{"key":34,"text":724,"correct":22},"长度大于100m的偏压棚洞",{"id":726,"libraryId":5,"type":15,"typeLabel":16,"stem":727,"options":728,"answer":66,"analysis":37},1111290,"安全生产事故隐患排查的两项达标包括（）。",[729,731,733,735,737],{"key":20,"text":730,"correct":22},"施工人员管理达标",{"key":24,"text":732,"correct":22},"施工现场安全防护达标",{"key":28,"text":734,"correct":26},"机械配置达标",{"key":31,"text":736,"correct":26},"材料检验达标",{"key":34,"text":738,"correct":26},"方案编制达标",[740,744,747,750,753,756],{"id":741,"name":742,"category":7,"favorite":743},1,"领导干部任职前廉政法规知识测试题",92,{"id":745,"name":746,"category":7,"favorite":741},595,"建筑结构与设备",{"id":748,"name":749,"category":7,"favorite":741},715,"招标采购专业知识与法律法规",{"id":751,"name":752,"category":7,"favorite":741},848,"市政方向-通用基础",{"id":754,"name":755,"category":7,"favorite":8},534,"BIM工程师",{"id":757,"name":755,"category":7,"favorite":8},535]