[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":713},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,21,50,1644,[13,34,46,58,70,82,94,106,118,130,148,158,173,188,203,218,233,248,263,278,293,307,322,336,350,365,377,391,405,420,434,448,463,473,488,502,516,531,545,559,573,586,601,615,629,643,657,671,685,699],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1111189,1,"单选题","关于连续梁桥与简支梁桥的受力特点，下列说法正确的是()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","连续梁支座位置弯矩为正弯矩",false,{"key":24,"text":25,"correct":22},"B","简支梁跨中弯矩为负弯矩",{"key":27,"text":28,"correct":22},"C","连续梁支座位置弯矩均为零",{"key":30,"text":31,"correct":32},"D","简支梁支座位置弯矩均为零",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1111190,"公路隧道明洞顶的填土厚度应不小于()m。",[38,40,42,44],{"key":20,"text":39,"correct":22},"1",{"key":24,"text":41,"correct":32},"2",{"key":27,"text":43,"correct":22},"3",{"key":30,"text":45,"correct":22},"4",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1111191,"公路工程材料的验收程序依次为()。",[50,52,54,56],{"key":20,"text":51,"correct":32},"验收准备→核对证件→检验实物→办理入库",{"key":24,"text":53,"correct":22},"市场调研→检验实物→核对证件→办理入库",{"key":27,"text":55,"correct":22},"市场调研→合同签订→核对证件→办理入库",{"key":30,"text":57,"correct":22},"合同签订→检验实物→报告批复→办理入库",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1111192,"预应力后张法张拉施工时，工具锚（夹具）、千斤顶和工作锚（锚具）正确的安装顺序是()。",[62,64,66,68],{"key":20,"text":63,"correct":32},"工作锚→千斤顶→工具锚",{"key":24,"text":65,"correct":22},"工具锚→千斤顶→工作锚",{"key":27,"text":67,"correct":22},"工具锚→工作锚→千斤顶",{"key":30,"text":69,"correct":22},"工作锚→工具锚→千斤顶",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1111193,"路基施工准备工作中，横断面复测主要是测量横断面的()。",[74,76,78,80],{"key":20,"text":75,"correct":32},"地面线",{"key":24,"text":77,"correct":22},"边桩位置",{"key":27,"text":79,"correct":22},"边坡坡度",{"key":30,"text":81,"correct":22},"占地宽度",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},1111194,"针对高处坠落事故，属于致害物的是()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"高处洞口未加设盖板",{"key":24,"text":89,"correct":22},"脚手架面未铺满脚手板",{"key":27,"text":91,"correct":22},"高处作业未佩戴安全带",{"key":30,"text":93,"correct":32},"掉落的施工人员受自身重力作用伤害",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1111195,"某大桥0号桥台混凝土工程量为100m3，按配合比设计，浇筑该桥台混凝土需用卵石80m3，若材料损耗率为2%，则该桥台施工中的卵石用量为()m3。",[98,100,102,104],{"key":20,"text":99,"correct":22},"78.4",{"key":24,"text":101,"correct":22},"80",{"key":27,"text":103,"correct":32},"81.6",{"key":30,"text":105,"correct":22},"83.2",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1111196,"下列选项中，不属于桥梁工程施工周转料的是（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"钢模",{"key":24,"text":113,"correct":22},"脚手架",{"key":27,"text":115,"correct":32},"移动模架",{"key":30,"text":117,"correct":22},"塔吊使用的轻轨",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},1111197,"下列周转材料摊销方法中，适用于脚手架摊销的是()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"定额摊销法",{"key":24,"text":125,"correct":22},"一次摊销法",{"key":27,"text":127,"correct":22},"分次摊销法",{"key":30,"text":129,"correct":32},"分期摊销法",{"id":131,"libraryId":5,"type":132,"typeLabel":133,"stem":134,"options":135,"answer":147,"analysis":33},1111198,2,"多选题","下面属于较好的路基填料的是（）。",[136,138,140,142,144],{"key":20,"text":137,"correct":32},"砾类土",{"key":24,"text":139,"correct":22},"重黏土",{"key":27,"text":141,"correct":22},"膨胀性岩石",{"key":30,"text":143,"correct":22},"易溶性岩石",{"key":145,"text":146,"correct":32},"E","砂类土","AE",{"id":149,"libraryId":5,"type":132,"typeLabel":133,"stem":150,"options":151,"answer":157,"analysis":33},1111199,"在土质路基填筑施工中，不同透水性质材料正确的组合方案有（）。",[152,153,154,155,156],{"key":20,"text":20,"correct":32},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":32},{"key":30,"text":30,"correct":32},{"key":145,"text":145,"correct":22},"ACD",{"id":159,"libraryId":5,"type":132,"typeLabel":133,"stem":160,"options":161,"answer":172,"analysis":33},1111200,"关于路基冬期施工的说法，正确的有（）。",[162,164,166,168,170],{"key":20,"text":163,"correct":32},"冬期填筑的路堤，每层每侧应超填并压实",{"key":24,"text":165,"correct":32},"挖填方交界处，填土低于1m的路堤都不应在冬期填筑",{"key":27,"text":167,"correct":22},"当路堤填至路床底面时，应碾压密实后停止填筑",{"key":30,"text":169,"correct":32},"当天填的土必须当天完成碾压",{"key":145,"text":171,"correct":32},"挖方边坡不应一次挖到设计线","ABDE",{"id":174,"libraryId":5,"type":132,"typeLabel":133,"stem":175,"options":176,"answer":187,"analysis":33},1111201,"路基加宽施工应满足的要求有（）。",[177,179,181,183,185],{"key":20,"text":178,"correct":22},"应按设计拆除老路路缘石、旧路肩并注意不扰动旧路的边坡防护",{"key":24,"text":180,"correct":32},"严禁将边坡清挖物作为新路堤填料",{"key":27,"text":182,"correct":32},"老路堤与新路堤交界的坡面挖除清理的法向厚度不宜小于0.3m",{"key":30,"text":184,"correct":32},"拓宽部分的路堤采用非透水性填料时，应在地基表面按设计铺设垫层",{"key":145,"text":186,"correct":22},"拓宽路堤的填料宜选用细粒土","BCD",{"id":189,"libraryId":5,"type":132,"typeLabel":133,"stem":190,"options":191,"answer":202,"analysis":33},1111202,"关于边沟施工的说法，正确的有（）。",[192,194,196,198,200],{"key":20,"text":193,"correct":32},"边沟设置于挖方地段和填土高度小于边沟深度的填方地段",{"key":24,"text":195,"correct":32},"边沟沟底纵坡应衔接平顺",{"key":27,"text":197,"correct":22},"曲线外侧边沟应适当加深，其增加值应大于超高值",{"key":30,"text":199,"correct":22},"土质地段的边沟纵坡大于0.3%时应采取加固措施",{"key":145,"text":201,"correct":32},"路堤靠山一侧的坡脚应设置不渗水的边沟","ABE",{"id":204,"libraryId":5,"type":132,"typeLabel":133,"stem":205,"options":206,"answer":217,"analysis":33},1111203,"路基改建施工，高路堤地基处治施工中为了确保路基稳定、减少路基工后沉降，对高路堤拓宽可采取（）等处理措施，并配合填筑轻型材料。",[207,209,211,213,215],{"key":20,"text":208,"correct":32},"粉喷桩",{"key":24,"text":210,"correct":32},"砂桩",{"key":27,"text":212,"correct":32},"塑料排水体",{"key":30,"text":214,"correct":32},"碎石桩",{"key":145,"text":216,"correct":22},"换填砂石","ABCD",{"id":219,"libraryId":5,"type":132,"typeLabel":133,"stem":220,"options":221,"answer":232,"analysis":33},1111204,"预防高填方路基沉降路堤的措施有（）。",[222,224,226,228,230],{"key":20,"text":223,"correct":32},"施工时应考虑高填方路基早开工，避免填筑速度过快",{"key":24,"text":225,"correct":22},"在谷底采用大块块石抛填",{"key":27,"text":227,"correct":32},"施工时要严格分层填筑，控制分层的厚度，并充分压实",{"key":30,"text":229,"correct":22},"下雨天进行填筑，让雨水充分浸润路基后再碾压",{"key":145,"text":231,"correct":32},"加强对基底的压实或对地基进行加固处理，当地基位于斜坡和谷底时，应做挖台阶处理","ACE",{"id":234,"libraryId":5,"type":132,"typeLabel":133,"stem":235,"options":236,"answer":247,"analysis":33},1111206,"某山区高速公路，横断面边桩放样的方法有（）。",[237,239,241,243,245],{"key":20,"text":238,"correct":32},"渐近法",{"key":24,"text":240,"correct":32},"坐标法",{"key":27,"text":242,"correct":22},"图解法",{"key":30,"text":244,"correct":22},"计算法",{"key":145,"text":246,"correct":22},"偏角法","AB",{"id":249,"libraryId":5,"type":132,"typeLabel":133,"stem":250,"options":251,"answer":262,"analysis":33},1111207,"关于土方路堤填筑要求正确说法有（）。",[252,254,256,258,260],{"key":20,"text":253,"correct":32},"性质不同的填料，应水平分层、分段填筑，分层压实",{"key":24,"text":255,"correct":32},"同一水平层路基的全宽应采用同一种填料，不得混合填筑",{"key":27,"text":257,"correct":22},"填方分几个作业段施工时，如能交替填筑，则应分层相互交替搭接，搭接长度不小于1m",{"key":30,"text":259,"correct":32},"每种填料的松铺厚度应通过试验确定",{"key":145,"text":261,"correct":22},"每一填筑层压实后的宽度应等于设计宽度","ABD",{"id":264,"libraryId":5,"type":132,"typeLabel":133,"stem":265,"options":266,"answer":277,"analysis":33},1111208,"填石路堤施工时应该注意的要点是（）。",[267,269,271,273,275],{"key":20,"text":268,"correct":32},"二级及二级以上公路的填石路堤应分层填筑、分层压实",{"key":24,"text":270,"correct":32},"在填石路堤顶面与细粒土填土层之间应按设计要求设过渡层",{"key":27,"text":272,"correct":32},"压实机械宜选用自重不小于18t的振动压路机",{"key":30,"text":274,"correct":22},"应该将软质石料与硬质石料混合均匀，混合填筑",{"key":145,"text":276,"correct":32},"岩性相差较大的填料应分层或分段填筑","ABCE",{"id":279,"libraryId":5,"type":132,"typeLabel":133,"stem":280,"options":281,"answer":292,"analysis":33},1111209,"关于滑坡地段路基施工技术要点的说法，正确的有（）。",[282,284,286,288,290],{"key":20,"text":283,"correct":32},"迅速排除地面汇水及地下水",{"key":24,"text":285,"correct":32},"减轻滑体作业机械重力、土体重力和振动",{"key":27,"text":287,"correct":32},"在干旱季节内尽快完成滑坡地带的施工",{"key":30,"text":289,"correct":22},"牵引式滑坡处治宜采用滑坡减重法",{"key":145,"text":291,"correct":22},"具有膨胀土性质的滑坡处治宜采用滑坡减重法","ABC",{"id":294,"libraryId":5,"type":132,"typeLabel":133,"stem":295,"options":296,"answer":217,"analysis":33},1111210,"排除滑坡地下水的设施（）。",[297,299,301,303,305],{"key":20,"text":298,"correct":32},"支撑渗沟",{"key":24,"text":300,"correct":32},"边坡渗沟",{"key":27,"text":302,"correct":32},"暗沟",{"key":30,"text":304,"correct":32},"平孔",{"key":145,"text":306,"correct":22},"天沟",{"id":308,"libraryId":5,"type":132,"typeLabel":133,"stem":309,"options":310,"answer":321,"analysis":33},1111211,"适于采用管式渗沟的条件有（）。",[311,313,315,317,319],{"key":20,"text":312,"correct":22},"地下水引水较短",{"key":24,"text":314,"correct":32},"地下水引水较长",{"key":27,"text":316,"correct":32},"流量较大的地区",{"key":30,"text":318,"correct":22},"流量较小的地区",{"key":145,"text":320,"correct":22},"排除淤泥中的地下水","BC",{"id":323,"libraryId":5,"type":132,"typeLabel":133,"stem":324,"options":325,"answer":187,"analysis":33},1111212,"填石渗沟、管式渗沟和洞式渗沟均具有结构有（）。",[326,328,330,332,334],{"key":20,"text":327,"correct":22},"垫层",{"key":24,"text":329,"correct":32},"排水层",{"key":27,"text":331,"correct":32},"反滤层",{"key":30,"text":333,"correct":32},"封闭层",{"key":145,"text":335,"correct":22},"挡水层",{"id":337,"libraryId":5,"type":132,"typeLabel":133,"stem":338,"options":339,"answer":292,"analysis":33},1111213,"某二级公路，路段地基软土厚度1m左右，可用（ ）进行软土处理较合适。",[340,342,344,346,348],{"key":20,"text":341,"correct":32},"换填垫层",{"key":24,"text":343,"correct":32},"抛石挤淤",{"key":27,"text":345,"correct":32},"稳定剂处理",{"key":30,"text":347,"correct":22},"粒料桩",{"key":145,"text":349,"correct":22},"CFG桩",{"id":351,"libraryId":5,"type":132,"typeLabel":133,"stem":352,"options":353,"answer":364,"analysis":33},1111214,"下列材料，可用于防止路面反射裂缝的有（ ）。",[354,356,358,360,362],{"key":20,"text":355,"correct":22},"油毛毡",{"key":24,"text":357,"correct":22},"塑料布",{"key":27,"text":359,"correct":32},"土工布",{"key":30,"text":361,"correct":22},"聚丙乙烯拉筋带",{"key":145,"text":363,"correct":32},"土工格栅","CE",{"id":366,"libraryId":5,"type":132,"typeLabel":133,"stem":367,"options":368,"answer":292,"analysis":33},1111215,"土方路堤施工需要的机械有（ ）。 A.铲运机",[369,371,373,375],{"key":20,"text":370,"correct":32},"平地机",{"key":24,"text":372,"correct":32},"装卸机",{"key":27,"text":374,"correct":32},"冲击钻机",{"key":30,"text":376,"correct":22},"龙门式起重机",{"id":378,"libraryId":5,"type":132,"typeLabel":133,"stem":379,"options":380,"answer":187,"analysis":33},1111216,"路基施工中，深孔爆破的判断依据有（ ）。",[381,383,385,387,389],{"key":20,"text":382,"correct":22},"炮孔成水平或略有倾斜",{"key":24,"text":384,"correct":32},"孔径大于75mm",{"key":27,"text":386,"correct":32},"深度在5m以上",{"key":30,"text":388,"correct":32},"采用延长药包",{"key":145,"text":390,"correct":22},"采用一次烘膛",{"id":392,"libraryId":5,"type":132,"typeLabel":133,"stem":393,"options":394,"answer":217,"analysis":33},1111217,"锚杆挡土墙的锚固工序主要有（ ）。",[395,397,399,401,403],{"key":20,"text":396,"correct":32},"养护",{"key":24,"text":398,"correct":32},"钻孔",{"key":27,"text":400,"correct":32},"灌浆",{"key":30,"text":402,"correct":32},"插入锚杆",{"key":145,"text":404,"correct":22},"勾缝",{"id":406,"libraryId":5,"type":132,"typeLabel":133,"stem":407,"options":408,"answer":419,"analysis":33},1111218,"关于工程防护施工中的说法，正确的有（ ）。",[409,411,413,415,417],{"key":20,"text":410,"correct":22},"喷射混凝土宜自上而下进行",{"key":24,"text":412,"correct":22},"浆砌片石护坡，宜在路堤沉降前施工，防止产生不均匀沉降",{"key":27,"text":414,"correct":32},"喷射混凝土初凝后，应立即养护，养护期一般为7～10d",{"key":30,"text":416,"correct":32},"锚杆孔深应大于锚固长度200mm",{"key":145,"text":418,"correct":32},"铺设钢筋网前宜在岩面喷射一层混凝土","CDE",{"id":421,"libraryId":5,"type":132,"typeLabel":133,"stem":422,"options":423,"answer":172,"analysis":33},1111219,"某二级公路K9+550～K9+600段的路基右侧有一滑坡体，施工单位采取了下列滑坡防治措施，其中正确的有（ ）。",[424,426,428,430,432],{"key":20,"text":425,"correct":32},"整平滑坡表面的积水坑，并封堵裂缝",{"key":24,"text":427,"correct":32},"在滑坡体以外修筑环形截水沟",{"key":27,"text":429,"correct":22},"在滑坡体上部堆放砂袋",{"key":30,"text":431,"correct":32},"修筑抗滑桩进行支挡",{"key":145,"text":433,"correct":32},"填方路堤发生的滑坡，可采用反压土方或修建挡土墙等方法处理",{"id":435,"libraryId":5,"type":132,"typeLabel":133,"stem":436,"options":437,"answer":247,"analysis":33},1111220,"地基隔离墙按作用与功能可分为（ ）。",[438,440,442,444,446],{"key":20,"text":439,"correct":32},"防渗型隔离墙",{"key":24,"text":441,"correct":32},"支挡型隔离墙",{"key":27,"text":443,"correct":22},"锚杆隔离墙",{"key":30,"text":445,"correct":22},"加筋土隔离墙",{"key":145,"text":447,"correct":22},"重力式隔离墙",{"id":449,"libraryId":5,"type":132,"typeLabel":133,"stem":450,"options":451,"answer":462,"analysis":33},1111221,"关于垫层施工的说法，错误的有（ ）。",[452,454,456,458,460],{"key":20,"text":453,"correct":32},"垫层的最佳含水率8%～12%，与施工方法无关",{"key":24,"text":455,"correct":22},"粉煤灰垫层严禁在浸水状态下施工",{"key":27,"text":457,"correct":32},"地面有起伏坡度时，应水平分层铺筑",{"key":30,"text":459,"correct":22},"灰土垫层压实后3d内不得受水浸泡",{"key":145,"text":461,"correct":22},"粉煤灰垫层验收后，应及时填筑路堤或封层","AC",{"id":464,"libraryId":5,"type":132,"typeLabel":133,"stem":465,"options":466,"answer":217,"analysis":33},1111222,"路基横断面边桩放样方法有（ ）。",[467,468,469,470,471],{"key":20,"text":242,"correct":32},{"key":24,"text":244,"correct":32},{"key":27,"text":238,"correct":32},{"key":30,"text":240,"correct":32},{"key":145,"text":472,"correct":22},"切线支距法",{"id":474,"libraryId":5,"type":132,"typeLabel":133,"stem":475,"options":476,"answer":487,"analysis":33},1111223,"路基压实度的现场测定方法有（ ）。",[477,479,481,483,485],{"key":20,"text":478,"correct":22},"重型击实法",{"key":24,"text":480,"correct":32},"灌砂法",{"key":27,"text":482,"correct":22},"表面振动压实仪法",{"key":30,"text":484,"correct":32},"环刀法",{"key":145,"text":486,"correct":32},"核子密度湿度仪法","BDE",{"id":489,"libraryId":5,"type":132,"typeLabel":133,"stem":490,"options":491,"answer":187,"analysis":33},1111224,"关于水泥稳定土基层路拌法的说法，正确的有（）。",[492,494,496,498,500],{"key":20,"text":493,"correct":22},"摊铺土之前只需通过计算确定土的松铺系数",{"key":24,"text":495,"correct":32},"摊铺土应在摊铺水泥的前一天进行",{"key":27,"text":497,"correct":32},"如已平整的土含水量过小，应在土层上洒水闷料",{"key":30,"text":499,"correct":32},"细粒土应经一夜闷料",{"key":145,"text":501,"correct":22},"对于二级公路，土与水泥的干拌可采用农用旋耕机作机与平地配合进行",{"id":503,"libraryId":5,"type":132,"typeLabel":133,"stem":504,"options":505,"answer":202,"analysis":33},1111225,"关于沥青混合料的说法，正确的有（）。",[506,508,510,512,514],{"key":20,"text":507,"correct":32},"压路机采用2～3台双轮双振压路机及2～3台重量不小于16t胶轮压路机组成",{"key":24,"text":509,"correct":32},"采用雾状喷水法，以保证沥青混合料碾压过程中不粘轮",{"key":27,"text":511,"correct":22},"在当天成型的路面上，不得停放各种机械设备或车辆",{"key":30,"text":513,"correct":22},"初压应采用钢轮压路机紧跟摊铺机碾压",{"key":145,"text":515,"correct":32},"压路机不得在未碾压成型路段上转向、掉头、加水或停留",{"id":517,"libraryId":5,"type":132,"typeLabel":133,"stem":518,"options":519,"answer":530,"analysis":33},1111226,"水泥稳定土基层裂缝的防治方法有（）。",[520,522,524,526,528],{"key":20,"text":521,"correct":22},"提高水泥用量比例",{"key":24,"text":523,"correct":32},"应严格集料中黏土含量",{"key":27,"text":525,"correct":32},"应严格控制加水量",{"key":30,"text":527,"correct":32},"碎石级配应接近要求级配范围的中值",{"key":145,"text":529,"correct":32},"养护结束后应及时铺筑下封层","BCDE",{"id":532,"libraryId":5,"type":132,"typeLabel":133,"stem":533,"options":534,"answer":202,"analysis":33},1111227,"不宜用于二级和二级以上公路高级路面基层的有（）。",[535,537,539,541,543],{"key":20,"text":536,"correct":32},"水泥稳定细粒土",{"key":24,"text":538,"correct":32},"水泥稳定煤矸石",{"key":27,"text":540,"correct":22},"水泥稳定碎石土",{"key":30,"text":542,"correct":22},"水泥稳定砂砾",{"key":145,"text":544,"correct":32},"石灰稳定碎石",{"id":546,"libraryId":5,"type":132,"typeLabel":133,"stem":547,"options":548,"answer":277,"analysis":33},1111228,"下列属于无机结合料基层养护方式的有（）。",[549,551,553,555,557],{"key":20,"text":550,"correct":32},"洒水养护",{"key":24,"text":552,"correct":32},"土工布覆盖",{"key":27,"text":554,"correct":32},"撒铺乳化沥青",{"key":30,"text":556,"correct":22},"铺设干砂",{"key":145,"text":558,"correct":32},"薄膜覆盖",{"id":560,"libraryId":5,"type":132,"typeLabel":133,"stem":561,"options":562,"answer":172,"analysis":33},1111229,"沥青混合料在运输过程中出现（）时应予以废弃。",[563,565,567,569,571],{"key":20,"text":564,"correct":32},"已离析的混合料",{"key":24,"text":566,"correct":32},"硬化在运输车箱内的混合料",{"key":27,"text":568,"correct":22},"在夏季中午高温时运输的混合料",{"key":30,"text":570,"correct":32},"低于规定铺筑温度的混合料",{"key":145,"text":572,"correct":32},"被雨淋的混合料",{"id":574,"libraryId":5,"type":132,"typeLabel":133,"stem":575,"options":576,"answer":585,"analysis":33},1111230,"路面基层排水施工时，排水基层下必须设置（）。",[577,579,580,582,583],{"key":20,"text":578,"correct":22},"透水层",{"key":24,"text":331,"correct":32},{"key":27,"text":581,"correct":22},"防水层",{"key":30,"text":329,"correct":22},{"key":145,"text":584,"correct":32},"不透水垫层","BE",{"id":587,"libraryId":5,"type":132,"typeLabel":133,"stem":588,"options":589,"answer":600,"analysis":33},1111231,"无机结合料稳定基层施工中，对原材料的技术要求不正确的有（）。",[590,592,594,596,598],{"key":20,"text":591,"correct":22},"高速公路和一级公路的基层，应采用磨细消石灰",{"key":24,"text":593,"correct":22},"高速公路和一级公路用石灰（磨细消石灰）宜不低于Ⅱ级技术要求",{"key":27,"text":595,"correct":22},"水泥强度等级为32.5或42.5",{"key":30,"text":597,"correct":32},"高速公路使用等外石灰时，有效氧化钙含量应在20%以上",{"key":145,"text":599,"correct":32},"水泥初凝时间大于3h，终凝时间大于6h且小于12h","DE",{"id":602,"libraryId":5,"type":132,"typeLabel":133,"stem":603,"options":604,"answer":217,"analysis":33},1111232,"无机结合料施工过程中，如果下承层发现弹簧现象，可用（）措施进行处理。",[605,607,609,611,613],{"key":20,"text":606,"correct":32},"晾晒",{"key":24,"text":608,"correct":32},"换填",{"key":27,"text":610,"correct":32},"掺石灰",{"key":30,"text":612,"correct":32},"掺水泥",{"key":145,"text":614,"correct":22},"重型碾压",{"id":616,"libraryId":5,"type":132,"typeLabel":133,"stem":617,"options":618,"answer":172,"analysis":33},1111233,"煤矸石、高炉矿渣、钢渣用于修筑基层或底基层之前应崩解稳定，为评价混合料性能，宜采用的试验有（）。",[619,621,623,625,627],{"key":20,"text":620,"correct":32},"强度试验",{"key":24,"text":622,"correct":32},"模量试验",{"key":27,"text":624,"correct":22},"级配试验",{"key":30,"text":626,"correct":32},"温度收缩试验",{"key":145,"text":628,"correct":32},"干湿收缩试验",{"id":630,"libraryId":5,"type":132,"typeLabel":133,"stem":631,"options":632,"answer":147,"analysis":33},1111234,"马歇尔试验可测定沥青混合料的指标有（）。",[633,635,637,639,641],{"key":20,"text":634,"correct":32},"稳定度",{"key":24,"text":636,"correct":22},"针入度",{"key":27,"text":638,"correct":22},"压实度",{"key":30,"text":640,"correct":22},"延度",{"key":145,"text":642,"correct":32},"流值",{"id":644,"libraryId":5,"type":132,"typeLabel":133,"stem":645,"options":646,"answer":202,"analysis":33},1111235,"计算现场拌合工程量时，应考虑（）因素。",[647,649,651,653,655],{"key":20,"text":648,"correct":32},"结构层宽度",{"key":24,"text":650,"correct":32},"结构层厚度",{"key":27,"text":652,"correct":22},"运输车辆的吨位",{"key":30,"text":654,"correct":22},"湿密度",{"key":145,"text":656,"correct":32},"干密度",{"id":658,"libraryId":5,"type":132,"typeLabel":133,"stem":659,"options":660,"answer":247,"analysis":33},1111236,"水泥混凝土面层摊铺时的施工缝宜设置的部位有（）。",[661,663,665,667,669],{"key":20,"text":662,"correct":32},"胀缝处",{"key":24,"text":664,"correct":32},"缩缝处",{"key":27,"text":666,"correct":22},"横缝处",{"key":30,"text":668,"correct":22},"假缝处",{"key":145,"text":670,"correct":22},"切缝处",{"id":672,"libraryId":5,"type":132,"typeLabel":133,"stem":673,"options":674,"answer":292,"analysis":33},1111237,"石灰稳定土底基层裂缝的预防措施有（）。",[675,677,679,681,683],{"key":20,"text":676,"correct":32},"石灰土成型后应及时洒水养生",{"key":24,"text":678,"correct":32},"加强剂量控制，使石灰剂量准确",{"key":27,"text":680,"correct":32},"施工用土中适量掺加粉煤灰",{"key":30,"text":682,"correct":22},"在石灰土层中设置伸缩缝",{"key":145,"text":684,"correct":22},"含水量提高2个百分点",{"id":686,"libraryId":5,"type":132,"typeLabel":133,"stem":687,"options":688,"answer":202,"analysis":33},1111238,"生产配合比设计应包括下列技术内容的有（）。",[689,691,693,695,697],{"key":20,"text":690,"correct":32},"确定料仓供料比例",{"key":24,"text":692,"correct":32},"确定水泥稳定材料的容许延迟时间",{"key":27,"text":694,"correct":22},"选择级配范围",{"key":30,"text":696,"correct":22},"确定结合料类型",{"key":145,"text":698,"correct":32},"确定混合料的最佳含水率、最大干密度",{"id":700,"libraryId":5,"type":132,"typeLabel":133,"stem":701,"options":702,"answer":600,"analysis":33},1111239,"级配砾石可以适用的条件有（ ）。",[703,705,707,709,711],{"key":20,"text":704,"correct":22},"一级公路的基层",{"key":24,"text":706,"correct":22},"高速公路的基层",{"key":27,"text":708,"correct":22},"二级公路的基层",{"key":30,"text":710,"correct":32},"轻交通的二级公路基层",{"key":145,"text":712,"correct":32},"三级公路的基层",[714,717,720,723,726,729],{"id":15,"name":715,"category":7,"favorite":716},"领导干部任职前廉政法规知识测试题",92,{"id":718,"name":719,"category":7,"favorite":15},595,"建筑结构与设备",{"id":721,"name":722,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":724,"name":725,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":727,"name":728,"category":7,"favorite":8},534,"BIM工程师",{"id":730,"name":728,"category":7,"favorite":8},535]