[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":619},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,2,50,1644,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,393,405,417,429,441,453,465,477,489,501,513,525,537,549,561,573,585,597,609],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1110221,1,"单选题","关于沥青路面施工安全要求的说法，错误的是（）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","洒布车行驶中不得使用加热系统",false,{"key":24,"text":25,"correct":22},"B","拌和站应配备消防设施",{"key":27,"text":28,"correct":22},"C","不得在石料溢流管、升起的料斗下方站立或同行",{"key":30,"text":31,"correct":32},"D","沥青罐内检查应采用明火照明",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1110222,"可以预防沥青混凝土路面横向接缝病害的措施是（）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"尽量采用平接缝，边缘处理成垂直面",{"key":24,"text":41,"correct":22},"碾压的温度越低越好",{"key":27,"text":43,"correct":22},"摊铺机起步速度要快",{"key":30,"text":45,"correct":22},"压路机先进行纵向碾压，再横向碾压",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1110223,"有轻度车辙、龟裂，磨耗层损坏较小的旧沥青路面最适合采用（）修复。",[50,52,54,56],{"key":20,"text":51,"correct":22},"现场冷再生法",{"key":24,"text":53,"correct":32},"整形再生法",{"key":27,"text":55,"correct":22},"复拌再生法",{"key":30,"text":57,"correct":22},"厂拌热再生法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1110224,"由连续密级配矿料组成的沥青混合料结构为（）。",[62,64,66,68],{"key":20,"text":63,"correct":32},"密实悬浮结构",{"key":24,"text":65,"correct":22},"骨架空隙结构",{"key":27,"text":67,"correct":22},"密实骨架结构",{"key":30,"text":69,"correct":22},"连续级配结构",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1110225,"下列情况中应浇洒透层沥青的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":32},"沥青路面的级配砂砾、级配碎石基层",{"key":24,"text":77,"correct":22},"旧沥青路面层上加铺沥青层",{"key":27,"text":79,"correct":22},"水泥混凝土路面上铺筑沥青面层",{"key":30,"text":81,"correct":22},"有裂缝或已修补的旧沥青路面",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1110226,"填隙碎石的施工工艺包括：①运输和摊铺粗碎石；②撒布填隙料；③初压；④再次撒布填隙料；⑤振动压实。施工完后，拟检测如下项目：压实度、弯沉值、平整度、构造深度等。其施工工艺流程正确的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"①→②→③→④→⑤",{"key":24,"text":89,"correct":32},"①→③→②→⑤→④→⑤",{"key":27,"text":91,"correct":22},"①→③→②→④→⑤",{"key":30,"text":93,"correct":22},"①→②→③→⑤→④→⑤",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1110227,"沥青碎石玛蹄脂混合料属于（）结构。",[98,100,102,104],{"key":20,"text":99,"correct":22},"密实-悬浮",{"key":24,"text":101,"correct":32},"密实-骨架",{"key":27,"text":103,"correct":22},"骨架-空隙",{"key":30,"text":105,"correct":22},"骨架-悬浮",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},1110228,"沥青混凝土路面不平整的防治措施不包括（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"合理选择碾压速度",{"key":24,"text":113,"correct":22},"保证摊铺机均匀连续作业",{"key":27,"text":115,"correct":22},"合理确定初压温度",{"key":30,"text":117,"correct":32},"采用一台摊铺机分幅作业",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1110229,"沥青表面处治通常采用（）施工。",[122,124,126,128],{"key":20,"text":123,"correct":22},"厂拌法",{"key":24,"text":125,"correct":22},"平行作业法",{"key":27,"text":127,"correct":32},"层铺法",{"key":30,"text":129,"correct":22},"中心站法",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1110230,"关于填隙碎石的说法，正确的是（）。",[134,136,138,140],{"key":20,"text":135,"correct":32},"填隙碎石层上为薄沥青面层时，宜使集料的棱角外露3～5mm",{"key":24,"text":137,"correct":22},"填隙碎石基层碾压完成后，如要开放交通，应限制车速",{"key":27,"text":139,"correct":22},"应由近到远将集料按计算的距离卸置于下承层上，应严格控制卸料距离",{"key":30,"text":141,"correct":22},"湿法施工时，宜待结构层稍变干燥后，用重型压路机碾压",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1110231,"关于水泥稳定土路拌法碾压施工的做法，正确的是（）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"拌合均匀后，应用钢轮压路机快速碾压一遍",{"key":24,"text":149,"correct":32},"同日施工的两工作段的衔接处，前一段拌合整形后留5～8m与后一段再加水泥重新拌合后一起碾压",{"key":27,"text":151,"correct":22},"当必须分两幅施工时，纵缝必须斜接，不得垂直相接",{"key":30,"text":153,"correct":22},"应先采用重型压路机后采用轻型压路机进行碾压",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1110232,"下列关于沥青混合料摊铺的有关说法错误的是（）。",[158,160,162,164],{"key":20,"text":159,"correct":32},"中面层采用平衡梁法施工，表面层采用走线法施工",{"key":24,"text":161,"correct":22},"摊铺过程中不准随意变换速度，尽量避免中途停顿",{"key":27,"text":163,"correct":22},"摊铺温度可以根据气温变化进行调节",{"key":30,"text":165,"correct":22},"梯进式施工时，两幅需要有30～60mm的搭接",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1110233,"下列关于滑模摊铺机铺筑的说法，错误的是（）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"滑模摊铺高速公路、一级公路时，应采用单向坡双线基准线",{"key":24,"text":173,"correct":32},"多风季节施工，宜增大基准线桩间距",{"key":27,"text":175,"correct":22},"振捣棒下缘位置应位于挤压底板最低点以上",{"key":30,"text":177,"correct":22},"滑模摊铺机起步时，应先开启振捣棒，再开动滑模机平稳推进摊铺",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1110234,"水泥路面碎石化施工时，表面凹处在10cm×10cm以上的应利用（）找平，以保证加铺沥青面层的平整度。",[182,184,186,188],{"key":20,"text":183,"correct":32},"沥青混合料",{"key":24,"text":185,"correct":22},"密级配碎石",{"key":27,"text":187,"correct":22},"乳化沥青",{"key":30,"text":189,"correct":22},"水泥混凝土",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},1110235,"适用任何场合和层次、各个等级的路面沥青是（）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"改性沥青",{"key":24,"text":197,"correct":22},"阳离子乳化沥青",{"key":27,"text":199,"correct":32},"A级道路石油沥青",{"key":30,"text":201,"correct":22},"B级道路石油沥青",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1110236,"关于粘层油施工的技术要点，说法正确的是（）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"气温低于0°时不得喷洒",{"key":24,"text":209,"correct":32},"路面潮湿时不得喷洒",{"key":27,"text":211,"correct":22},"喷洒粘层油后，严禁所有车辆通行",{"key":30,"text":213,"correct":22},"喷洒表面用水洗刷后，应尽快喷洒",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1110237,"关于透层油施工，说法正确的是（）。",[218,220,222,224],{"key":20,"text":219,"correct":32},"透层油的黏度通过调节稀释剂的用量或乳化沥青的浓度得到适宜的黏度",{"key":24,"text":221,"correct":22},"用于级配碎石的透层油宜紧接在基层碾压成型后喷洒",{"key":27,"text":223,"correct":22},"喷洒过量的透层油立即用水冲洗",{"key":30,"text":225,"correct":22},"在无机结合料基层上洒布透层油时，宜在铺筑沥青层前1～2h洒布",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1110238,"对于地下水位较高、且有重载交通行驶的路面，为隔绝地下水上升影响路面稳定性，应在路基顶面设置（）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"反滤层",{"key":24,"text":233,"correct":32},"垫层",{"key":27,"text":235,"correct":22},"稀浆封层",{"key":30,"text":237,"correct":22},"透层",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":30,"analysis":33},1110239,"对无机稳定基层的要求，正确的是（）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"对水泥稳定类基层，应在2d之内完成碾压",{"key":24,"text":245,"correct":22},"混合料的初凝时间作为施工控制时间",{"key":27,"text":247,"correct":22},"取混合料的容许延迟时间作为施工控制时间",{"key":30,"text":249,"correct":32},"石灰稳定类材料宜在当天碾压完成，最长不应超过4d",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":30,"analysis":33},1110240,"关于水泥混凝土路面施工中，说法错误的是（）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"摊铺前应对基层表面进行洒水湿润",{"key":24,"text":257,"correct":22},"模板拆除应在混凝土抗压强度达到8MPa时方可进行",{"key":27,"text":259,"correct":22},"施工缝宜设在胀缝或缩缝处",{"key":30,"text":261,"correct":32},"搅拌楼的配备，优先选配间歇式搅拌楼，严禁使用连续搅拌楼",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1110241,"关于洒水闷料的说法，错误的是（）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"采用高效率路拌机械时，宜一次洒够水量",{"key":24,"text":269,"correct":32},"闷料的含水量应较最佳含水量高2～3百分点",{"key":27,"text":271,"correct":22},"中、粗粒材料视其中细粒材料的含量，可缩短闷料时间",{"key":30,"text":273,"correct":22},"对综合稳定材料，应将石灰和土拌合后一起闷料",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1110242,"关于SMA施工的说法，错误的是（）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"SMA的碾压遵循“紧跟、慢压、高频、低幅”的原则",{"key":24,"text":281,"correct":32},"SMA面层施工宜使用胶轮压路机或组合式压路机碾压",{"key":27,"text":283,"correct":22},"复压工作区间严格分开，降低压路机工作区段长度，保证在足够高温度下进行压实作业",{"key":30,"text":285,"correct":22},"摊铺前必须将工作面清扫干净，如用水冲，必须晒干后才能进行下一步作业",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1110243,"反映沥青混合料受水损害时抵抗剥落能力的指标是（）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"稳定度",{"key":24,"text":293,"correct":32},"残留稳定度",{"key":27,"text":295,"correct":22},"流值",{"key":30,"text":297,"correct":22},"饱和度",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},1110247,"支架高度大于（）m时，其顶部和底部均应设置水平剪力撑。",[302,304,306,308],{"key":20,"text":303,"correct":22},"4.5",{"key":24,"text":305,"correct":32},"4.8",{"key":27,"text":307,"correct":22},"5",{"key":30,"text":309,"correct":22},"8",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":30,"analysis":33},1110248,"卸落浆砌石拱桥的拱架，须待砂浆强度达到设计强度标准值的（）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"70%",{"key":24,"text":317,"correct":22},"75%",{"key":27,"text":319,"correct":22},"80%",{"key":30,"text":321,"correct":32},"85%",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":30,"analysis":33},1110249,"桥梁钢筋的纵向焊接有条件应尽量采用（）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"电弧焊",{"key":24,"text":329,"correct":22},"电渣压力焊",{"key":27,"text":331,"correct":22},"气压焊",{"key":30,"text":333,"correct":32},"闪光对焊",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":30,"analysis":33},1110250,"关于大体积混凝土施工的说法，正确的是（）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"大体积混凝土进行配合比设计及质量评定时，可按28d龄期的抗压强度控制",{"key":24,"text":341,"correct":22},"大体积混凝土的温度控制应遵循外降内保的原则进行",{"key":27,"text":343,"correct":22},"宜采取改善粗集料级配、提高掺合料和粗集料的含量、提高水胶比等措施",{"key":30,"text":345,"correct":32},"宜选用低水化热和凝结时间长的水泥品种",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":30,"analysis":33},1110251,"高强度混凝土水泥不得使用（）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"硅酸盐水泥",{"key":24,"text":353,"correct":22},"普通硅酸盐水泥",{"key":27,"text":355,"correct":22},"出厂时间2个月的硅酸盐水泥",{"key":30,"text":357,"correct":32},"立窑水泥",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},1110252,"一般适用于松散、中密砂土、粘性土的沉入桩施工方法（）。",[362,364,366,368],{"key":20,"text":363,"correct":32},"锤击沉桩法",{"key":24,"text":365,"correct":22},"振动沉桩法",{"key":27,"text":367,"correct":22},"射水沉桩法",{"key":30,"text":369,"correct":22},"静力压桩法",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},1110253,"钻孔灌注桩施工中，用钻具旋转切削土体钻进，泥浆泵将泥浆压进泥浆笼头，并通过钻杆中心从喷头钻入钻孔内的钻孔方法是（）。",[374,376,378,380],{"key":20,"text":375,"correct":32},"正循环回转钻孔法",{"key":24,"text":377,"correct":22},"反循环回转钻孔法",{"key":27,"text":379,"correct":22},"螺旋钻孔法",{"key":30,"text":381,"correct":22},"冲抓钻孔法",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},1110254,"桥梁桩基础正循环回转钻孔施工中，护壁泥浆循环路径包括：①桩；②钻杆中心；③钻头口；④泥浆泵笼头；⑤泥浆沉淀池。则泥浆循环的正确的是（）。",[386,387,389,391],{"key":20,"text":87,"correct":22},{"key":24,"text":388,"correct":32},"④→②→③→①→⑤",{"key":27,"text":390,"correct":22},"②→③→④→①→⑤",{"key":30,"text":392,"correct":22},"⑤→①→③→②→④",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":20,"analysis":33},1110255,"下列预应力张拉要求中，错误的有（）。",[397,399,401,403],{"key":20,"text":398,"correct":32},"有几套张拉设备时，可根据现场情况随机组合使用",{"key":24,"text":400,"correct":22},"进行张拉作业前，必须对千斤顶进行标定",{"key":27,"text":402,"correct":22},"当梁体混凝土强度达到设计规定的张拉强度时，方可进行张拉",{"key":30,"text":404,"correct":22},"预应力筋锚固后的外露长度不宜小于30mm，且不应小于1.5倍预应力筋直径。",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":30,"analysis":33},1110256,"关于先张法预应力钢筋张拉施工的说法，错误的是（）。",[409,411,413,415],{"key":20,"text":410,"correct":22},"多根钢筋张拉时，其初应力要保持一致",{"key":24,"text":412,"correct":22},"热轧带肋钢筋张拉程序一般为：0→初应力→1.05σcon（持荷5min）→0.9σcon→σcon（锚固）",{"key":27,"text":414,"correct":22},"张拉时，张拉力方向与预应力钢材在一条直线上",{"key":30,"text":416,"correct":32},"同一构件内预应力钢筋断筋数量不得超过1%",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":20,"analysis":33},1110257,"属于桥梁附属设施的是（）。",[421,423,425,427],{"key":20,"text":422,"correct":32},"锥形护坡",{"key":24,"text":424,"correct":22},"桥墩",{"key":27,"text":426,"correct":22},"桥跨结构",{"key":30,"text":428,"correct":22},"基础",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":30,"analysis":33},1110258,"某高速公路有一座单跨拱桥，其净跨径为l0，计算跨径为l，净矢高为f0，计算矢高为f，则该拱桥的矢跨比为（）。",[433,435,437,439],{"key":20,"text":434,"correct":22},"f0\u002Fl0",{"key":24,"text":436,"correct":22},"f0\u002Fl",{"key":27,"text":438,"correct":22},"f\u002Fl0",{"key":30,"text":440,"correct":32},"f\u002Fl",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":20,"analysis":33},1110259,"拱式桥与同跨径的梁式桥相比，其弯矩和变形要小很多，原因在于（）。",[445,447,449,451],{"key":20,"text":446,"correct":32},"水平力",{"key":24,"text":448,"correct":22},"竖向力",{"key":27,"text":450,"correct":22},"剪力",{"key":30,"text":452,"correct":22},"弯矩",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":27,"analysis":33},1110260,"桥梁结构模板支架设计应考虑的荷载包括：①模板、支架和拱架自重；②新浇筑混凝土、钢筋混凝土或其他圬工结构物的重力；③施工人员和施工材料、机具等行走、运输或堆放的荷载；④振捣混凝土时产生的荷载；⑤新浇筑混凝土对侧面模板的压力；⑥倾倒混凝土时产生的水平荷载；⑦其他可能产生的荷载。其中现浇钢筋混凝土连续梁支架设计强度计算的荷载组合是（）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"①+②+⑤+⑥+⑦",{"key":24,"text":460,"correct":22},"①+②+③+⑥+⑦",{"key":27,"text":462,"correct":32},"①+②+③+④+⑦",{"key":30,"text":464,"correct":22},"②+③+④+⑥+⑦",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":30,"analysis":33},1110261,"在对预应力筋进行拉伸试验中，应同时测定其（）。",[469,471,473,475],{"key":20,"text":470,"correct":22},"硬度",{"key":24,"text":472,"correct":22},"抗剪强度",{"key":27,"text":474,"correct":22},"密度",{"key":30,"text":476,"correct":32},"弹性模量",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":20,"analysis":33},1110262,"桥梁混凝土浇筑时，若施工缝为斜面，则施工缝应（）。",[481,483,485,487],{"key":20,"text":482,"correct":32},"浇筑成或凿成台阶状",{"key":24,"text":484,"correct":22},"设置止水带",{"key":27,"text":486,"correct":22},"及时修整抹光",{"key":30,"text":488,"correct":22},"补插拉杆",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":24,"analysis":33},1110263,"预应力张拉的实际伸长值ΔL=ΔL1+ΔL2其中ΔL2指的是（）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"0到初应力的实际值",{"key":24,"text":496,"correct":32},"0到初应力的推算值",{"key":27,"text":498,"correct":22},"初应力至最后张拉应力的实测值",{"key":30,"text":500,"correct":22},"初应力至最后张拉应力的推算值",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":24,"analysis":33},1110264,"关于明挖扩大基础基坑开挖的说法，错误的是（）。",[505,507,509,511],{"key":20,"text":506,"correct":22},"基坑顶缘四周适当距离处应设置截水沟",{"key":24,"text":508,"correct":32},"开挖机械距离基坑边缘应大于0.5m",{"key":27,"text":510,"correct":22},"基坑开挖经过不同土层时，边坡坡度可分层而异，视情况留平台",{"key":30,"text":512,"correct":22},"基坑自开挖起，应尽量连续施工直至基础完成",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":27,"analysis":33},1110265,"关于桥梁桩基使用冲击钻成孔的说法，正确的是（）。",[517,519,521,523],{"key":20,"text":518,"correct":22},"不适合于有孤石的砂砾石层",{"key":24,"text":520,"correct":22},"开始钻进宜快不宜慢",{"key":27,"text":522,"correct":32},"钻进过程中一定要保持护筒内的水头",{"key":30,"text":524,"correct":22},"遇有倾斜岩石，不得采用冲击钻钻进",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},1110266,"对高度大于30m的桥墩，在钢筋安装时宜设置（）。",[529,531,533,535],{"key":20,"text":530,"correct":22},"缆风绳",{"key":24,"text":532,"correct":32},"劲性骨架",{"key":27,"text":534,"correct":22},"横向保护钢筋",{"key":30,"text":536,"correct":22},"加劲梁",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":30,"analysis":33},1110267,"预应力混凝土连续梁桥施工中，计算后张法预应力筋的下料长度应考虑的因素（）。",[541,543,545,547],{"key":20,"text":542,"correct":22},"梁的跨径、锚夹具长度、千斤顶长度、盖梁宽度",{"key":24,"text":544,"correct":22},"梁的长度、锚夹具长度、千斤顶长度、预应力筋外露工作长度",{"key":27,"text":546,"correct":22},"盖梁宽度、梁的长度、锚夹具长度、千斤顶长度",{"key":30,"text":548,"correct":32},"预应力孔道曲线长度、预应力筋外露工作长度、锚夹具长度、千斤顶长度",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":24,"analysis":33},1110268,"关于悬臂浇筑施工，说法不正确的是（）。",[553,555,557,559],{"key":20,"text":554,"correct":22},"挂篮试拼后，要进行荷载试验",{"key":24,"text":556,"correct":32},"临时固结在条件成熟时，需采用动态破碎的方法，解除固结",{"key":27,"text":558,"correct":22},"桥墩两侧悬臂施工应平衡、对称，实际不平衡重量不能超过一个梁段的底板自重",{"key":30,"text":560,"correct":22},"悬臂浇筑前端顶底板的标高，应根据挂篮前端的垂直变形及预拱度设置",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":24,"analysis":33},1110269,"关于预应力管的说法，错误的是（）。",[565,567,569,571],{"key":20,"text":566,"correct":22},"所有管道均应设压浆孔",{"key":24,"text":568,"correct":32},"应在管道最低点设排气孔",{"key":27,"text":570,"correct":22},"必要时在管道最低点设排水孔",{"key":30,"text":572,"correct":22},"管道应采用定位钢筋固定安装",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":24,"analysis":33},1110270,"适用于无水或浅水河滩，地形相对平坦，孔数较多的中型梁板安装的吊装方法（）。",[577,579,581,583],{"key":20,"text":578,"correct":22},"自行式吊机架设法",{"key":24,"text":580,"correct":32},"跨墩龙门架架设法",{"key":27,"text":582,"correct":22},"简易型钢导梁架设法",{"key":30,"text":584,"correct":22},"联合架桥机架设法",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":30,"analysis":33},1110271,"在浇筑箱梁顶板和翼板混凝土时，为防止混凝土开裂，浇筑顺序应为（）。",[589,591,593,595],{"key":20,"text":590,"correct":22},"从内侧向外侧分两次完成",{"key":24,"text":592,"correct":22},"从内侧向外侧一次完成",{"key":27,"text":594,"correct":22},"从外侧向内侧分两次完成",{"key":30,"text":596,"correct":32},"从外侧向内侧一次完成",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":27,"analysis":33},1110272,"预应力张拉一般按0→σ→105%σcon（持荷5min）→σcon（锚固），其中σ的涵义为（）。",[601,603,605,607],{"key":20,"text":602,"correct":22},"锚固应力",{"key":24,"text":604,"correct":22},"控制应力",{"key":27,"text":606,"correct":32},"初始应力",{"key":30,"text":608,"correct":22},"持荷应力",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":24,"analysis":33},1110273,"圬工拱桥主拱圈以承受（）为主。",[613,614,616,617],{"key":20,"text":452,"correct":22},{"key":24,"text":615,"correct":32},"轴向力",{"key":27,"text":450,"correct":22},{"key":30,"text":618,"correct":22},"扭矩",[620,623,626,629,632,635],{"id":15,"name":621,"category":7,"favorite":622},"领导干部任职前廉政法规知识测试题",92,{"id":624,"name":625,"category":7,"favorite":15},595,"建筑结构与设备",{"id":627,"name":628,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":630,"name":631,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":633,"name":634,"category":7,"favorite":8},534,"BIM工程师",{"id":636,"name":634,"category":7,"favorite":8},535]