[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-19":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":614},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,19,50,1644,[13,34,46,58,70,82,94,106,115,127,139,150,162,174,186,198,208,220,232,244,256,266,278,290,302,314,326,338,350,362,374,386,398,410,422,434,446,458,470,482,494,506,518,530,542,554,566,578,590,602],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1111087,1,"单选题","下列设施中，不属于交通标志的是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","里程标",false,{"key":24,"text":25,"correct":26},"B","隔离栅",true,{"key":28,"text":29,"correct":22},"C","公路界碑",{"key":31,"text":32,"correct":22},"D","作业区指示牌","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1111088,"（2019年）关于标线施工技术要求的说法，错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"标线工程正式开工前，应进行标线车自动行驶试验",{"key":24,"text":41,"correct":22},"在正式划标线前，应保证路面表面清洁干燥",{"key":28,"text":43,"correct":22},"应根据设计图纸行放样",{"key":31,"text":45,"correct":22},"通过划线机的行驶速度控制好标线厚度",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1111089,"隧道照明控制系统对洞内照明强度调节的主要依据是（ ）。（2017年真题）",[50,52,54,56],{"key":20,"text":51,"correct":22},"洞外的照度和噪声值变化",{"key":24,"text":53,"correct":26},"洞外的照度和交通量变化",{"key":28,"text":55,"correct":22},"洞内粉尘含量和交通量变化",{"key":31,"text":57,"correct":22},"洞外的照度和粉尘含量变化",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1111090,"新建水泥混凝土路面验收时，不需要检验()。",[62,64,66,68],{"key":20,"text":63,"correct":26},"弯沉",{"key":24,"text":65,"correct":22},"厚度",{"key":28,"text":67,"correct":22},"平整度",{"key":31,"text":69,"correct":22},"摩擦系数",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1111091,"对于钢筋混凝土立柱局部出现的麻面现象，一般应进行()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"装饰",{"key":24,"text":77,"correct":26},"整修",{"key":28,"text":79,"correct":22},"返工",{"key":31,"text":81,"correct":22},"综合处理",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1111092,"工程质量检验评分应以()为单元，采用百分制进行。",[86,88,90,92],{"key":20,"text":87,"correct":22},"单项工程",{"key":24,"text":89,"correct":22},"单位工程",{"key":28,"text":91,"correct":22},"分部工程",{"key":31,"text":93,"correct":26},"分项工程",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1111093,"某公路挡土墙的分项工程质量评定得分为72分，根据《公路工程质量检验评定标准》的规定，该分项工程评定的质量等级应为()。",[98,100,102,104],{"key":20,"text":99,"correct":26},"不合格",{"key":24,"text":101,"correct":22},"合格",{"key":28,"text":103,"correct":22},"中等",{"key":31,"text":105,"correct":22},"良好",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1111094,"某公路收费站的出口车道设备施工分项工程质量评定为89分，根据《公路工程质量检验评定标准》的规定，该分项工程质量等级应为()。",[110,111,112,113],{"key":20,"text":99,"correct":26},{"key":24,"text":101,"correct":22},{"key":28,"text":103,"correct":22},{"key":31,"text":114,"correct":22},"优良",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":20,"analysis":33},1111095,"下列分项工程质量评分中，不合格的是（）。",[119,121,123,125],{"key":20,"text":120,"correct":26},"闭路电视监视系统85分",{"key":24,"text":122,"correct":22},"路缘石85分",{"key":28,"text":124,"correct":22},"浆砌排水沟80分",{"key":31,"text":126,"correct":22},"软土地基78分",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":28,"analysis":33},1111096,"（2018年）下列后张法预应力筋质量检验的实测项目中，属于关键项目的是（ ）。",[131,133,135,137],{"key":20,"text":132,"correct":22},"管道坐标",{"key":24,"text":134,"correct":22},"管道间距",{"key":28,"text":136,"correct":26},"张拉伸长率",{"key":31,"text":138,"correct":22},"断丝滑丝数",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":24,"analysis":33},1111097,"下列水泥稳定料粒基层质量检验的实测项目中，属于关键项目的是（ ）。（2017年真题）",[143,144,146,148],{"key":20,"text":67,"correct":22},{"key":24,"text":145,"correct":26},"压实度",{"key":28,"text":147,"correct":22},"纵断高程",{"key":31,"text":149,"correct":22},"横坡",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":24,"analysis":33},1111098,"（2020年真题）根据《公路工程质量检验评定标准（第一册，土建工程）》，一般项目的合格率应不低于（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"75%",{"key":24,"text":157,"correct":26},"80%",{"key":28,"text":159,"correct":22},"85%",{"key":31,"text":161,"correct":22},"90%",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":28,"analysis":33},1111099,"计算劳动量的公式如下：D=Q\u002F C，其中C的含义是()。",[166,168,170,172],{"key":20,"text":167,"correct":22},"工程数量",{"key":24,"text":169,"correct":22},"时间定额",{"key":28,"text":171,"correct":26},"产量定额",{"key":31,"text":173,"correct":22},"每天班次",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":28,"analysis":33},1111100,"下列流水施工参数中，属于空间参数的是()。",[178,180,182,184],{"key":20,"text":179,"correct":22},"组织间歇",{"key":24,"text":181,"correct":22},"流水强度",{"key":28,"text":183,"correct":26},"工作面",{"key":31,"text":185,"correct":22},"施工过程数",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":31,"analysis":33},1111101,"可以反映出关键工序和关键路线的公路工程进度计划形式是()。",[190,192,194,196],{"key":20,"text":191,"correct":22},"横道图",{"key":24,"text":193,"correct":22},"工程管理曲线",{"key":28,"text":195,"correct":22},"斜率图",{"key":31,"text":197,"correct":26},"网络图",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":31,"analysis":33},1111102,"在流水作业法施工的参数中，属于工艺参数的是()。",[202,203,205,207],{"key":20,"text":183,"correct":22},{"key":24,"text":204,"correct":22},"施工段",{"key":28,"text":206,"correct":22},"技术间歇",{"key":31,"text":181,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":24,"analysis":33},1111103,"某路面工程需要突击性施工以尽可能缩短施工工期，最宜采用的施工组织方法是()。",[212,214,216,218],{"key":20,"text":213,"correct":22},"顺序作业法",{"key":24,"text":215,"correct":26},"平行作业法",{"key":28,"text":217,"correct":22},"等节拍流水作业法",{"key":31,"text":219,"correct":22},"无节拍流水作业法",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":20,"analysis":33},1111104,"在工程管理曲线中，当实际支付线低于计划线时，表明()。",[224,226,228,230],{"key":20,"text":225,"correct":26},"进度延误",{"key":24,"text":227,"correct":22},"进度提前",{"key":28,"text":229,"correct":22},"成本节约",{"key":31,"text":231,"correct":22},"成本超支",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":20,"analysis":33},1111105,"（2018年）单代号网络图中，箭线一般用来表示（ ）。",[236,238,240,242],{"key":20,"text":237,"correct":26},"工作之间的逻辑关系",{"key":24,"text":239,"correct":22},"一项工作",{"key":28,"text":241,"correct":22},"一项工作的持续时间",{"key":31,"text":243,"correct":22},"工作之间的搭接时距",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":31,"analysis":33},1111106,"进度计划调整过程中，压缩关键工作持续时间可采用的管理措施是（ ）。（2017年真题）",[248,250,252,254],{"key":20,"text":249,"correct":22},"优化工作控制流程",{"key":24,"text":251,"correct":22},"改进施工方法",{"key":28,"text":253,"correct":22},"提供加快进度所需资金",{"key":31,"text":255,"correct":26},"采用信息技术进行计划调整",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":28,"analysis":33},1111107,"（2020年真题）在施工过程基本组织方法中，可以科学地利用工作面，实现不同专业队之间平行施工的是（ ）。",[260,261,262,264],{"key":20,"text":213,"correct":22},{"key":24,"text":215,"correct":22},{"key":28,"text":263,"correct":26},"流水作业法",{"key":31,"text":265,"correct":22},"平行顺序作业法",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":20,"analysis":33},1111108,"属于一个大型公路工程项目中“单位工程”的是()。",[270,272,274,276],{"key":20,"text":271,"correct":26},"路基",{"key":24,"text":273,"correct":22},"桥梁下部",{"key":28,"text":275,"correct":22},"桥梁承台",{"key":31,"text":277,"correct":22},"钻孔桩",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":24,"analysis":33},1111109,"（2019年）公路工程施工项目经理部是代表施工企业履行工程承包合同的主体，是最终产品质量责任的承担者，要代表企业对（ ）全面负责。",[282,284,286,288],{"key":20,"text":283,"correct":22},"监理单位",{"key":24,"text":285,"correct":26},"业主",{"key":28,"text":287,"correct":22},"质量监督机构",{"key":31,"text":289,"correct":22},"交通运输主管部门",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":20,"analysis":33},1111110,"（2019年）公路工程施工项目经理部的组织结构模式一般有四种，即直线式、职能式、矩阵式和（ ）。",[294,296,298,300],{"key":20,"text":295,"correct":26},"直线职能式",{"key":24,"text":297,"correct":22},"顶层设计式",{"key":28,"text":299,"correct":22},"代建制度",{"key":31,"text":301,"correct":22},"联合组建式",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":24,"analysis":33},1111111,"（2018年）关于钢筋加工场的说法，错误的是（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":22},"钢筋应垫高堆放，离地20 cm以上，下部支点以保证钢筋不变形为原则",{"key":24,"text":309,"correct":26},"顶棚及架构原则上应采用木结构搭设",{"key":28,"text":311,"correct":22},"钢筋加工场应做硬化处理",{"key":31,"text":313,"correct":22},"场地四周应设置排水沟",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":31,"analysis":33},1111112,"（2018年）关于公路工程施工特种作业人员管理的说法，错误的是（ ）。",[318,320,322,324],{"key":20,"text":319,"correct":22},"特种作业人员应具有初中及以上学历",{"key":24,"text":321,"correct":22},"特种作业人员应当参加年度安全教育培训或继续教育，每年不得少于24h",{"key":28,"text":323,"correct":22},"用人单位应与持有资格证书的特种作业人员订立劳动合同",{"key":31,"text":325,"correct":26},"用人单位应当面口头告知特种作业人员违章操作的危害",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":31,"analysis":33},1111113,"下列专项施工方案实施说法中，错误的是()。",[330,332,334,336],{"key":20,"text":331,"correct":22},"施工单位技术负责人应当定期巡查专项施工方案实施情况",{"key":24,"text":333,"correct":22},"施工单位指定的安全生产管理人员发现不按照专项施工方案施工的，应要求立即整改，整改合格后才能进入下一道工序",{"key":28,"text":335,"correct":22},"专项施工方案实施前，应向施工、技术等人员进行安全技术交底",{"key":31,"text":337,"correct":26},"施工单位可根据现场情况及时调整专项施工方案",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":28,"analysis":33},1111114,"危险源的风险评价通常采用D=1×E×C来进行判断，该种方法称为()。",[342,344,346,348],{"key":20,"text":343,"correct":22},"头脑风暴法",{"key":24,"text":345,"correct":22},"德尔菲法",{"key":28,"text":347,"correct":26},"作业条件危险性评价法",{"key":31,"text":349,"correct":22},"事故树法",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":20,"analysis":33},1111115,"施工单位应当对工程项目的施工安全重大危险源在施工现场人员集中显要位置予以公示，公示的内容不包括（）。",[354,356,358,360],{"key":20,"text":355,"correct":26},"重大危险源安全评价责任单位名称",{"key":24,"text":357,"correct":22},"施工安全重大危险源名称",{"key":28,"text":359,"correct":22},"注意事项及保障措施",{"key":31,"text":361,"correct":22},"可能导致发生的事故类别",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":31,"analysis":33},1111116,"针对危险性较大的工程编制的专项施工方案必须由()进行现场监督实施。",[366,368,370,372],{"key":20,"text":367,"correct":22},"技术负责人",{"key":24,"text":369,"correct":22},"班组负责人",{"key":28,"text":371,"correct":22},"监理工程师",{"key":31,"text":373,"correct":26},"专职安全生产管理人员",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":28,"analysis":33},1111117,"（2018年）某桥墩承台顶面与地面平齐，标高为+3．27m，墩顶高为+20．15m，墩顶处施工属于（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":22},"Ⅰ级高处作业",{"key":24,"text":381,"correct":22},"Ⅱ级高处作业",{"key":28,"text":383,"correct":26},"Ⅲ级高处作业",{"key":31,"text":385,"correct":22},"Ⅳ级高处作业",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":28,"analysis":33},1111119,"危险源风险评价LEC法的公式为D=L×E× C，其中E的含义是（ ）。（2017年真题）",[390,392,394,396],{"key":20,"text":391,"correct":22},"项目重要程度分值",{"key":24,"text":393,"correct":22},"事故发生的可能性分值",{"key":28,"text":395,"correct":26},"暴露于危险环境的频繁程度分值",{"key":31,"text":397,"correct":22},"事故造成的后果分值",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":24,"analysis":33},1111120,"（2020年真题）关于高处作业安全管理的措施，正确的是（ ）。",[402,404,406,408],{"key":20,"text":403,"correct":22},"安全绳不宜用作悬吊绳",{"key":24,"text":405,"correct":26},"高处作业人员应定期进行体检",{"key":28,"text":407,"correct":22},"作业面与水平安全网之间的高差不得超过5.0m",{"key":31,"text":409,"correct":22},"安全网的有效长度不应大于2.5m",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":28,"analysis":33},1111121,"为保证施工现场环境和卫生符合要求，施工现场封闭围挡高度不得小于()。",[414,416,418,420],{"key":20,"text":415,"correct":22},"1.4m",{"key":24,"text":417,"correct":22},"1.6m",{"key":28,"text":419,"correct":26},"1.8m",{"key":31,"text":421,"correct":22},"2.0m",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":20,"analysis":33},1111122,"（2019年）贝雷便桥架设常用悬臂推出法，推出时倾覆稳定性系数应不小于（ ）。",[426,428,430,432],{"key":20,"text":427,"correct":26},"1.2",{"key":24,"text":429,"correct":22},"1.3",{"key":28,"text":431,"correct":22},"1.5",{"key":31,"text":433,"correct":22},"2.0",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":31,"analysis":33},1111123,"（2019年）稳定土拌和设备按生产能力分为小型、中型、大型和特大型四种，大型稳定土拌和设备的生产能力是（ ）。",[438,440,442,444],{"key":20,"text":439,"correct":22},"200~300t\u002Fh",{"key":24,"text":441,"correct":22},"200~400t\u002Fh",{"key":28,"text":443,"correct":22},"400~500t\u002Fh",{"key":31,"text":445,"correct":26},"400~600t\u002Fh",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":28,"analysis":33},1111125,"根据《公路工程标准施工招标文件》，以下情形不会被否决的是()。",[450,452,454,456],{"key":20,"text":451,"correct":22},"投标报价或调整函中报价超过招标人公布的投标控制价上限（如有）",{"key":24,"text":453,"correct":22},"在评标时，发现有评标办法前附表约定需要否决的情形",{"key":28,"text":455,"correct":26},"投标报价大写金额与小写金额不相符，但投标人同意修正",{"key":31,"text":457,"correct":22},"投标人未在投标函上填写投标总价",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":31,"analysis":33},1111126,"根据《中华人民共和国招标投标法实施条例》，关于联合体投标的说法，错误的是()。",[462,464,466,468],{"key":20,"text":463,"correct":22},"联合体协议书应明确联合体牵头人和各方权利义务",{"key":24,"text":465,"correct":22},"由同一专业的单位组成的联合体，按照资质等级较低的单位确定资质等级",{"key":28,"text":467,"correct":22},"联合体各方在同一招标项目中以自己的名义单独投标或者参加其他联合体投标的，相关投标均无效",{"key":31,"text":469,"correct":26},"资格预审后联合体增减、更换成员的，投标联合体应重新提交共同投标协议并经招标人批准后方可投标",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":24,"analysis":33},1111127,"关于施工临时用电的说法，错误的是()。",[474,476,478,480],{"key":20,"text":475,"correct":22},"必须采用TN-S接地、接零保护系统",{"key":24,"text":477,"correct":26},"必须采用两级配电系统",{"key":28,"text":479,"correct":22},"分配电箱装设在用电设备或负荷相对集中的区域",{"key":31,"text":481,"correct":22},"每台用电设备应有各自专用的开关箱",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":31,"analysis":33},1111128,"关于高处电焊作业的说法，错误的是()。",[486,488,490,492],{"key":20,"text":487,"correct":22},"作业人员应持证上岗",{"key":24,"text":489,"correct":22},"作业人员应系安全绳",{"key":28,"text":491,"correct":22},"作业场所必须准备消防器材",{"key":31,"text":493,"correct":26},"作业下方若有易燃物品，必须采取覆盖等隔离措施",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":31,"analysis":33},1111129,"炮孔深度超过10m的石方爆破必须采用()。",[498,500,502,504],{"key":20,"text":499,"correct":22},"火花起爆",{"key":24,"text":501,"correct":22},"导爆绳起爆",{"key":28,"text":503,"correct":22},"火雷管起爆",{"key":31,"text":505,"correct":26},"电力起爆",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":24,"analysis":33},1111130,"关于隧道施工洞内运输的说法，错误的是()。",[510,512,514,516],{"key":20,"text":511,"correct":22},"装运大体积料具时，应有专人指挥",{"key":24,"text":513,"correct":26},"应选用汽油作燃料的车辆",{"key":28,"text":515,"correct":22},"装碴机操作时，其回转范围内不得有人通过",{"key":31,"text":517,"correct":22},"人车应分道通行",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":24,"analysis":33},1111131,"根据《公路工程施工安全技术规程》规定，人工挖孔桩允许的最大深度为()。",[522,524,526,528],{"key":20,"text":523,"correct":22},"10m",{"key":24,"text":525,"correct":26},"15m",{"key":28,"text":527,"correct":22},"18m",{"key":31,"text":529,"correct":22},"20m",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":20,"analysis":33},1111132,"配电箱、开关箱的导线进口和出口应设在箱体的()。",[534,536,538,540],{"key":20,"text":535,"correct":26},"下底面",{"key":24,"text":537,"correct":22},"上顶面",{"key":28,"text":539,"correct":22},"侧面",{"key":31,"text":541,"correct":22},"背面",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":24,"analysis":33},1111133,"正常情况下，配电箱、开关箱在使用过程中的停电先后顺序是()。",[546,548,550,552],{"key":20,"text":547,"correct":22},"总配电箱→分配电箱→开关箱",{"key":24,"text":549,"correct":26},"开关箱→分配电箱→总配电箱",{"key":28,"text":551,"correct":22},"分配电箱→总开关箱→开关箱",{"key":31,"text":553,"correct":22},"总开关箱→分配电箱→开关箱",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":31,"analysis":33},1111134,"挖孔桩孔内有岩层需要爆破时，应采用()爆破。",[558,560,562,564],{"key":20,"text":559,"correct":22},"药壶炮",{"key":24,"text":561,"correct":22},"猫洞炮",{"key":28,"text":563,"correct":22},"深孔炮",{"key":31,"text":565,"correct":26},"浅眼炮",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":20,"analysis":33},1111135,"关于挖孔桩基础施工安全控制要点的说法，正确的是()。",[570,572,574,576],{"key":20,"text":571,"correct":26},"孔内照明应使用36V电压的灯具",{"key":24,"text":573,"correct":22},"相邻两孔中，一孔进行浇筑混凝土作业时，另一孔的挖孔人员应降低作业强度",{"key":28,"text":575,"correct":22},"人工挖孔最深不得超过20m",{"key":31,"text":577,"correct":22},"孔内有岩层需要爆破时，应采取深孔爆破法",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":28,"analysis":33},1111136,"关于公路工程地下作业安全技术要点的说法，错误的是()。",[582,584,586,588],{"key":20,"text":583,"correct":22},"可采用湿式凿岩机进行机械凿岩",{"key":24,"text":585,"correct":22},"爆破加工房应设在洞口50m以外的安全地点",{"key":28,"text":587,"correct":26},"应使用金属炮棍装药",{"key":31,"text":589,"correct":22},"必须由原爆破人员按规定处理“盲炮”",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":24,"analysis":33},1111137,"关于沥青路面施工安全要求的说法，错误的是()。",[594,596,598,600],{"key":20,"text":595,"correct":22},"施工现场应配有医务人员",{"key":24,"text":597,"correct":26},"摊铺时，摊铺机下坡严禁换挡，上坡可换挡",{"key":28,"text":599,"correct":22},"不许站在运输车后用铣等工具往下捅沥青混合料",{"key":31,"text":601,"correct":22},"可用柴油清洗摊铺机",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":31,"analysis":33},1111138,"关于技术交底的说法，错误的是（）。",[606,608,610,612],{"key":20,"text":607,"correct":22},"技术交底工作应分级进行、分级管理",{"key":24,"text":609,"correct":22},"项目经理部的技术交底工作由项目经理组织，项目总工程师主持实施",{"key":28,"text":611,"correct":22},"工长（技术负责人）负责组织向本责任区内的班组交底",{"key":31,"text":613,"correct":26},"项目经理部的技术交底工作由项目总工程师组织，工长主持实施",[615,618,621,624,627,630],{"id":15,"name":616,"category":7,"favorite":617},"领导干部任职前廉政法规知识测试题",92,{"id":619,"name":620,"category":7,"favorite":15},595,"建筑结构与设备",{"id":622,"name":623,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":625,"name":626,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":628,"name":629,"category":7,"favorite":8},534,"BIM工程师",{"id":631,"name":629,"category":7,"favorite":8},535]