[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,17,50,1644,[13,34,44,56,68,80,92,104,116,128,140,152,164,176,188,199,211,223,235,247,259,271,283,295,307,319,331,343,355,367,379,391,403,415,427,439,451,463,475,487,499,511,522,534,546,558,570,582,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1110987,1,"单选题","反映沥青混合料受水损害时抵抗剥落能力的指标是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","稳定度",false,{"key":24,"text":25,"correct":26},"B","残留稳定度",true,{"key":28,"text":29,"correct":22},"C","流值",{"key":31,"text":32,"correct":22},"D","饱和度","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1110988,"马歇尔稳定度试验中，当沥青混合料试件达到最大荷载时，其压缩变形量称为()。",[38,39,41,42],{"key":20,"text":21,"correct":22},{"key":24,"text":40,"correct":22},"沥青饱和度",{"key":28,"text":29,"correct":26},{"key":31,"text":43,"correct":22},"最大荷载值",{"id":45,"libraryId":5,"type":15,"typeLabel":16,"stem":46,"options":47,"answer":31,"analysis":33},1110989,"在测定无机结合料稳定土的7d无侧限抗压强度试验中，室内制备试件的干密度应按照()控制。",[48,50,52,54],{"key":20,"text":49,"correct":22},"100%压实密度",{"key":24,"text":51,"correct":22},"97%压实密度",{"key":28,"text":53,"correct":22},"95%压实密度",{"key":31,"text":55,"correct":26},"工地预期的压实密度",{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":24,"analysis":33},1110990,"（2018年）水泥混凝土抗折强度的试验步骤包括：①试件的成型和养护；②标记试件；③试件外观检查、修整；④加载试验；⑤整理试验数据，提供试验报告，正确的顺序为（ ）。",[60,62,64,66],{"key":20,"text":61,"correct":22},"①→②→③→④→⑤",{"key":24,"text":63,"correct":26},"①→③→②→④→⑤",{"key":28,"text":65,"correct":22},"①→③→④→②→⑤",{"key":31,"text":67,"correct":22},"①→②→④→③→⑤",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":24,"analysis":33},1110991,"（2019年）无机结合料稳定土的无侧限抗压强度试验的试件为（ ）。",[72,74,76,78],{"key":20,"text":73,"correct":22},"100mm×100mm×100mm的立方体",{"key":24,"text":75,"correct":26},"高：直径=1：1的圆柱体",{"key":28,"text":77,"correct":22},"高：直径=2：1的圆柱体",{"key":31,"text":79,"correct":22},"150mm×150mm×150mm的立方体",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":28,"analysis":33},1110992,"水泥混凝土路面浇筑后，若表面没有及时覆盖和养护，在炎热或大风天气下，表面游离水蒸发过快，体积急剧收缩，容易产生()。",[84,86,88,90],{"key":20,"text":85,"correct":22},"横向裂缝",{"key":24,"text":87,"correct":22},"纵向裂缝",{"key":28,"text":89,"correct":26},"龟裂",{"key":31,"text":91,"correct":22},"断板",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":31,"analysis":33},1110993,"防止水泥稳定碎石基层出现裂缝病害的正确措施是()。",[96,98,100,102],{"key":20,"text":97,"correct":22},"适当增加水泥稳定碎石混合料的水泥用量",{"key":24,"text":99,"correct":22},"碎石级配应接近要求级配范围的高值",{"key":28,"text":101,"correct":22},"养护结束后不能急于铺筑下封层",{"key":31,"text":103,"correct":26},"混合料碾压成型后应及时洒水养护",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":24,"analysis":33},1110994,"适用于各级公路基层和底基层的材料是()。",[108,110,112,114],{"key":20,"text":109,"correct":22},"泥结碎石",{"key":24,"text":111,"correct":26},"级配碎石",{"key":28,"text":113,"correct":22},"泥灰结碎石",{"key":31,"text":115,"correct":22},"填隙碎石",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":28,"analysis":33},1110995,"无机结合料稳定土基层摊铺完成后，紧跟摊铺机及时碾压的设备宜选用()。",[120,122,124,126],{"key":20,"text":121,"correct":22},"重型振动压路机",{"key":24,"text":123,"correct":22},"三轮压路机",{"key":28,"text":125,"correct":26},"轻型两轮压路机",{"key":31,"text":127,"correct":22},"轮胎压路机",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":20,"analysis":33},1110996,"粒料基层横向宽度范围的碾压方向应是()。",[132,134,136,138],{"key":20,"text":133,"correct":26},"由低向高",{"key":24,"text":135,"correct":22},"由路肩向路中心",{"key":28,"text":137,"correct":22},"由内侧向外侧",{"key":31,"text":139,"correct":22},"由外侧向内侧",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":20,"analysis":33},1110997,"（2018年）不能用于二级和二级以上公路高级路面基层的是（ ）。",[144,146,148,150],{"key":20,"text":145,"correct":26},"水泥稳定细粒土",{"key":24,"text":147,"correct":22},"水泥稳定煤矸石",{"key":28,"text":149,"correct":22},"水泥稳定碎石土",{"key":31,"text":151,"correct":22},"水泥稳定砂砾",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":20,"analysis":33},1110998,"（2018年）二级公路无机结合料稳定碎石基层施工中，其拌合工艺和摊铺工艺推荐采用（ ）。",[156,158,160,162],{"key":20,"text":157,"correct":26},"集中厂拌和摊铺机摊铺",{"key":24,"text":159,"correct":22},"人工路拌和摊铺机摊铺",{"key":28,"text":161,"correct":22},"人工路拌和推土机摊铺",{"key":31,"text":163,"correct":22},"集中厂拌和推土机摊铺",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":28,"analysis":33},1110999,"（2019年）关于填隙碎石基层施工技术要求的说法，错误的是（ ）。",[168,170,172,174],{"key":20,"text":169,"correct":22},"填隙碎石层上为薄沥青面层时，碾压后宜使集料的棱角外露3~5mm",{"key":24,"text":171,"correct":22},"填隙料应干燥",{"key":28,"text":173,"correct":26},"宜采用胶轮压路机静压，碾压时，表面集料间应留有空隙",{"key":31,"text":175,"correct":22},"填隙碎石基层未洒透层沥青或未铺封层时，不得开放交通",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":31,"analysis":33},1111000,"机结合料稳定材料组成设计流程正确的是（ ）",[180,182,184,186],{"key":20,"text":181,"correct":22},"施工参数确定→生产配合比设计→目标配合比设计→原材料检验",{"key":24,"text":183,"correct":22},"施工参数确定→目标配合比设计→生产配合比设计→原材料检验",{"key":28,"text":185,"correct":22},"原材料检验→生产配合比设计→目标合比设计→施工参数确定",{"key":31,"text":187,"correct":26},"原材料检验→目标配合比设计→生产配合比设计→施工参数确定",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":28,"analysis":33},1111001,"关于填隙碎石施的说法，错误的是（ ）。（2017年真题）",[192,194,195,197],{"key":20,"text":193,"correct":22},"单层填隙碎石的压实厚度宜为公称最大粒径的1.5～2.0倍",{"key":24,"text":171,"correct":22},{"key":28,"text":196,"correct":26},"填隙碎石施工，应采用胶轮压路机",{"key":31,"text":198,"correct":22},"填隙碎石碾压后，表面集料间的空隙应填满，但表面应看得见集料",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":28,"analysis":33},1111002,"（2020年真题）采用圆柱体试件测试水泥稳定碎石（最大粒径31.5mm）的无侧限抗压强度，制备试件的尺寸应是（ ）。",[203,205,207,209],{"key":20,"text":204,"correct":22},"直径100mm，高：直径=1：1",{"key":24,"text":206,"correct":22},"直径100mm，高：直径=1.5：1",{"key":28,"text":208,"correct":26},"直径150mm，高：直径=1：1",{"key":31,"text":210,"correct":22},"直径150mm，高：直径=1.5：1",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":31,"analysis":33},1111003,"公路面层水泥混凝土可采用矿渣硅酸盐水泥的交通等级是()。",[215,217,219,221],{"key":20,"text":216,"correct":22},"极重交通荷载等级",{"key":24,"text":218,"correct":22},"特重交通荷载等级",{"key":28,"text":220,"correct":22},"重交通荷载等级",{"key":31,"text":222,"correct":26},"中交通荷载等级",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},1111004,"沥青路面透层施工中，透层油洒布后应待充分渗透，一般不少于()h后才能摊铺上层。",[227,229,231,233],{"key":20,"text":228,"correct":22},"12",{"key":24,"text":230,"correct":26},"24",{"key":28,"text":232,"correct":22},"36",{"key":31,"text":234,"correct":22},"48",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":24,"analysis":33},1111005,"下列水泥混凝土路面填缝料中，属于加热施工式填缝料的是()。",[239,241,243,245],{"key":20,"text":240,"correct":22},"沥青橡胶类",{"key":24,"text":242,"correct":26},"聚氯乙烯胶泥类",{"key":28,"text":244,"correct":22},"硅树脂类",{"key":31,"text":246,"correct":22},"氯丁橡胶泥类",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":28,"analysis":33},1111006,"关于水泥混凝土路面胀缝设置的说法，正确的是()。",[251,253,255,257],{"key":20,"text":252,"correct":22},"高温施工时应设置胀缝",{"key":24,"text":254,"correct":22},"常温施工时，集料温缩系数小时应设置胀缝",{"key":28,"text":256,"correct":26},"邻近构造物或与其他道路相交处应设置胀缝",{"key":31,"text":258,"correct":22},"常温施工时，年温差较小时应设置胀缝",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},1111007,"沥青表面处治路面通常采用()施工。",[263,265,267,269],{"key":20,"text":264,"correct":26},"层铺法",{"key":24,"text":266,"correct":22},"平衡梁法",{"key":28,"text":268,"correct":22},"小型机具法",{"key":31,"text":270,"correct":22},"撒布法",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":31,"analysis":33},1111008,"SMA混合料拌制时，若混合料出厂温度为195℃，该批混合料的正确处理方法是将混凝料（）。",[275,277,279,281],{"key":20,"text":276,"correct":22},"冷却至合格出厂温度后运至现场摊铺",{"key":24,"text":278,"correct":22},"运至现场后冷却至合格摊铺温度时摊铺",{"key":28,"text":280,"correct":22},"与冷料同时回炉拌制",{"key":31,"text":282,"correct":26},"废弃",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":28,"analysis":33},1111009,"下列说法中，属于沥青路面粘层主要作用的是()。",[287,289,291,293],{"key":20,"text":288,"correct":22},"为使沥青面层与基层结合良好，在基层上浇洒乳化沥青等而形成透入基层表面的薄层",{"key":24,"text":290,"correct":22},"封闭某一层起保水防水作用",{"key":28,"text":292,"correct":26},"使上下沥青结构层或沥青结构层与结构物（或水泥混凝土路面）完全粘结成一个整体",{"key":31,"text":294,"correct":22},"基层与沥青表面层之间的过渡和有效联结",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":31,"analysis":33},1111010,"SMA沥青混合料的级配类型是()。",[299,301,303,305],{"key":20,"text":300,"correct":22},"开级配",{"key":24,"text":302,"correct":22},"连续级配",{"key":28,"text":304,"correct":22},"半开级配",{"key":31,"text":306,"correct":26},"间断级配",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":31,"analysis":33},1111011,"某路面施工工序如下：基层准备→洒透层油→洒第一层沥青→洒第一层集料→碾压→洒第二层沥青→洒第二层集料→碾压→洒第三层沥青→撒第三层集料→碾压→初期养护成型，其对应的路面是()。",[311,313,315,317],{"key":20,"text":312,"correct":22},"沥青贯人式路面",{"key":24,"text":314,"correct":22},"同步沥青碎石路面",{"key":28,"text":316,"correct":22},"沥青混凝土路面",{"key":31,"text":318,"correct":26},"沥青表面处治路面",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":24,"analysis":33},1111012,"在旧水泥混凝土路面上加铺沥青混凝土结构层时，在两者之间应设置()。",[323,325,327,329],{"key":20,"text":324,"correct":22},"透层",{"key":24,"text":326,"correct":26},"粘层",{"key":28,"text":328,"correct":22},"封层",{"key":31,"text":330,"correct":22},"防水层",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":24,"analysis":33},1111013,"重交通公路水泥混凝土路面邻近横向帐篷的3条横向缩缝应采用的形式是（）。",[335,337,339,341],{"key":20,"text":336,"correct":22},"设传力杆平缝型",{"key":24,"text":338,"correct":26},"设传力杆假缝型",{"key":28,"text":340,"correct":22},"设拉杆企口缝型",{"key":31,"text":342,"correct":22},"设拉杆平缝型",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":24,"analysis":33},1111014,"（2020年真题）水泥混凝土路面采用小型机具施工时，滚杠所起的作用是（ ）。",[347,349,351,353],{"key":20,"text":348,"correct":22},"振密材料",{"key":24,"text":350,"correct":26},"提浆整平",{"key":28,"text":352,"correct":22},"避免材料离析",{"key":31,"text":354,"correct":22},"提高表面粗糙度",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":33},1111015,"除圆管涵和箱涵外，单孔跨径小于()的泄水或通行的小型构造物是涵洞。",[359,361,363,365],{"key":20,"text":360,"correct":26},"5m",{"key":24,"text":362,"correct":22},"6m",{"key":28,"text":364,"correct":22},"7m",{"key":31,"text":366,"correct":22},"8m",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":28,"analysis":33},1111016,"关于钢筋混凝土梁桥施工时对于预拱度偏差防治的说法，错误的是()。",[371,373,375,377],{"key":20,"text":372,"correct":22},"支架基础应符合设计要求",{"key":24,"text":374,"correct":22},"预应力波纹管管道的安装定位应准确",{"key":28,"text":376,"correct":26},"控制预应力张拉的混凝土试块应采取标准养护",{"key":31,"text":378,"correct":22},"预制梁存梁时间不宜过长",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":20,"analysis":33},1111017,"关于钢筋混凝土结构构造裂缝防治的说法，错误的是()。",[383,385,387,389],{"key":20,"text":384,"correct":26},"增加混凝土搅拌时间",{"key":24,"text":386,"correct":22},"选择安定性好的水泥",{"key":28,"text":388,"correct":22},"大体积混凝土中采用粉煤灰水泥",{"key":31,"text":390,"correct":22},"混凝土中适当掺加缓凝剂",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":20,"analysis":33},1111018,"二级以下公路的路堤与桥梁台背回填的联结部应按设计要求预留()。",[395,397,399,401],{"key":20,"text":396,"correct":26},"台阶",{"key":24,"text":398,"correct":22},"锥坡",{"key":28,"text":400,"correct":22},"泄水孔",{"key":31,"text":402,"correct":22},"沉降缝",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},1111019,"钻孔灌注桩施工中，为满足混凝土和易性要求，坍落度应控制在()cm范围内。",[407,409,411,413],{"key":20,"text":408,"correct":22},"8～12",{"key":24,"text":410,"correct":22},"10～15",{"key":28,"text":412,"correct":22},"12～16",{"key":31,"text":414,"correct":26},"18～22",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":28,"analysis":33},1111020,"为防止导管堵塞，钻孔灌注桩水下混凝土的坍落度合适的值是（）cm。",[419,421,423,425],{"key":20,"text":420,"correct":22},"10",{"key":24,"text":422,"correct":22},"15",{"key":28,"text":424,"correct":26},"20",{"key":31,"text":426,"correct":22},"25",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":28,"analysis":33},1111021,"临近桥台边缘处的桥台台背回填宜采用()压实。",[431,433,435,437],{"key":20,"text":432,"correct":22},"18t振动压路机",{"key":24,"text":434,"correct":22},"大型冲击压实机",{"key":28,"text":436,"correct":26},"小型蛙式打夯机",{"key":31,"text":438,"correct":22},"强夯机",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":31,"analysis":33},1111022,"关于结构物回填施工的说法，正确的是()。",[443,445,447,449],{"key":20,"text":444,"correct":22},"涵背回填应采用倾填方法",{"key":24,"text":446,"correct":22},"桥台台背回填宜采用不透水的粘土作填料",{"key":28,"text":448,"correct":22},"桥台台背和锥坡的回填不能同步进行",{"key":31,"text":450,"correct":26},"挡土墙墙背回填结束后，顶部应及时封闭",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":24,"analysis":33},1111023,"（2018年）关于圆管涵施工要求的说法，正确的是（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"管涵不得现场就地制造",{"key":24,"text":458,"correct":26},"当管壁厚度不一致时，应调整高度使内壁齐平",{"key":28,"text":460,"correct":22},"对插口接管处不得使用沥青填塞",{"key":31,"text":462,"correct":22},"每节管底出现反坡的坡度应小于3°",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":31,"analysis":33},1111024,"钢筋混凝土结构构造裂缝形成原因不包括（ ）。（2017年真题）",[467,469,471,473],{"key":20,"text":468,"correct":22},"骨料含泥量过大",{"key":24,"text":470,"correct":22},"混凝土搅拌及运输时间过长",{"key":28,"text":472,"correct":22},"采用了水灰比大的混凝土",{"key":31,"text":474,"correct":26},"采取了推迟水化热峰值出现的措施",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},1111025,"某预应力混凝土简支梁桥，总体立面布置如下图所示(尺寸单位：m)，则该桥的全长、净跨径和计算跨径分别是（）。",[479,481,483,485],{"key":20,"text":480,"correct":22},"40m,50m,20m",{"key":24,"text":482,"correct":22},"40m,50m,19.5m",{"key":28,"text":484,"correct":22},"50m,40m,20m",{"key":31,"text":486,"correct":26},"50m,40m,19.5m",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":31,"analysis":33},1111026,"中国古代著名的赵州桥(石拱桥)属于（）桥型。",[491,493,495,497],{"key":20,"text":492,"correct":22},"无铰拱",{"key":24,"text":494,"correct":22},"一铰拱",{"key":28,"text":496,"correct":22},"两铰拱",{"key":31,"text":498,"correct":26},"三铰拱",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":31,"analysis":33},1111027,"浇筑箱梁混凝土时，对箱梁腹板与底板及顶板连接处的承托部位，不适合采用的振捣设备是()。",[503,505,507,509],{"key":20,"text":504,"correct":22},"插入式振动器",{"key":24,"text":506,"correct":22},"附着式振动器",{"key":28,"text":508,"correct":22},"平板式振动器",{"key":31,"text":510,"correct":26},"振捣棒",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":24,"analysis":33},1111028,"桥梁桩基础正循环回转钻孔施工中，护壁泥浆循环路径包括：①桩孔内；②钻杆中心；③钻头口；④泥浆泵笼头；⑤泥浆沉淀池。则泥浆循环的正确顺序是()。",[515,516,518,520],{"key":20,"text":61,"correct":22},{"key":24,"text":517,"correct":26},"④→②→③→①→⑤",{"key":28,"text":519,"correct":22},"②→③→④→①→⑤",{"key":31,"text":521,"correct":22},"⑤→①→③→②→④",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":31,"analysis":33},1111029,"连续梁桥可以实现较大跨径是由于其利用负弯矩来减少()弯矩，从而使梁跨内的内力分配更合理。",[526,528,530,532],{"key":20,"text":527,"correct":22},"固定端",{"key":24,"text":529,"correct":22},"自由端",{"key":28,"text":531,"correct":22},"铰接点",{"key":31,"text":533,"correct":26},"跨中",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":20,"analysis":33},1111030,"桥梁浅挖基坑施工中，当土质较差且有较严重流沙现象时，宜采用()排水。",[538,540,542,544],{"key":20,"text":539,"correct":26},"井点",{"key":24,"text":541,"correct":22},"集水坑",{"key":28,"text":543,"correct":22},"板桩法",{"key":31,"text":545,"correct":22},"帷幕法",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":31,"analysis":33},1111031,"某简支空心板梁桥桥面标高21.75m，板厚60cm，桥面铺装厚12cm，设计洪水位标高16.50m，施工水位标高12.25m，低水位标高7.80m，则该桥梁高度为()m。",[550,552,554,556],{"key":20,"text":551,"correct":22},"5.25",{"key":24,"text":553,"correct":22},"9.50",{"key":28,"text":555,"correct":22},"13.23",{"key":31,"text":557,"correct":26},"13.95",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":31,"analysis":33},1111032,"拱桥净跨径是每孔拱跨的两拱脚截面()。",[562,564,566,568],{"key":20,"text":563,"correct":22},"形心之间的直线距离",{"key":24,"text":565,"correct":22},"形心之间的水平距离",{"key":28,"text":567,"correct":22},"最低点之间的直线距离",{"key":31,"text":569,"correct":26},"最低点之间的水平距离",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":24,"analysis":33},1111033,"梁式桥中，梁作为承重结构主要是以它的()能力来承受车辆荷载。",[574,576,578,580],{"key":20,"text":575,"correct":22},"抗压",{"key":24,"text":577,"correct":26},"抗弯",{"key":28,"text":579,"correct":22},"抗扭",{"key":31,"text":581,"correct":22},"抗剪",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":28,"analysis":33},1111034,"桥梁桩基钻孔时，钻渣从钻杆下口吸进，通过钻杆中心排出至沉淀池内，这种钻孔方法称为()。",[586,588,590,592],{"key":20,"text":587,"correct":22},"冲击钻孔法",{"key":24,"text":589,"correct":22},"正循环回转钻孔法",{"key":28,"text":591,"correct":26},"反循环回转钻孔法",{"key":31,"text":593,"correct":22},"旋挖钻机钻孔法",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":20,"analysis":33},1111035,"单跨拱桥的两拱脚截面最低点之间的水平距离称为该桥的()。",[598,600,602,604],{"key":20,"text":599,"correct":26},"净跨径",{"key":24,"text":601,"correct":22},"单跨跨径",{"key":28,"text":603,"correct":22},"计算跨径",{"key":31,"text":605,"correct":22},"桥梁全长",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":24,"analysis":33},1111036,"圬工拱桥主拱圈以承受()为主。",[610,612,614,616],{"key":20,"text":611,"correct":22},"弯矩",{"key":24,"text":613,"correct":26},"轴向力",{"key":28,"text":615,"correct":22},"剪力",{"key":31,"text":617,"correct":22},"扭矩",[619,622,625,628,631,634],{"id":15,"name":620,"category":7,"favorite":621},"领导干部任职前廉政法规知识测试题",92,{"id":623,"name":624,"category":7,"favorite":15},595,"建筑结构与设备",{"id":626,"name":627,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":629,"name":630,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":632,"name":633,"category":7,"favorite":8},534,"BIM工程师",{"id":635,"name":633,"category":7,"favorite":8},535]