[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":608},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,16,50,1644,[13,34,46,56,68,80,92,102,114,123,135,147,159,171,183,195,207,219,231,243,255,267,279,291,303,315,327,339,351,363,375,387,399,411,423,435,447,459,471,483,495,503,515,527,539,549,560,572,584,596],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1110937,1,"单选题","下列关于公路工程二级注册建造师执业工程规模标准的叙述有误的是（）",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","大型桥梁工程的单跨≥50m",false,{"key":24,"text":25,"correct":26},"B","中型桥梁工程的桥长≥1000m",true,{"key":28,"text":29,"correct":22},"C","大型隧道工程的长度≥1000m",{"key":31,"text":32,"correct":22},"D","中型单项合同额为500万元～3000万元","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1110938,"某软岩路堑路段缺乏合格石料，该路堑最适合修建的挡土墙是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"加筋挡土墙",{"key":24,"text":41,"correct":26},"锚杆挡土墙",{"key":28,"text":43,"correct":22},"浆砌块石衡重式挡土墙",{"key":31,"text":45,"correct":22},"护臂式挡土墙",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1110939,"下列挡土墙结构类型中，受地基承载力限制最大的是()。",[50,52,53,54],{"key":20,"text":51,"correct":26},"重力式挡土墙",{"key":24,"text":39,"correct":22},{"key":28,"text":41,"correct":22},{"key":31,"text":55,"correct":22},"悬臂式挡土墙",{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":28,"analysis":33},1110940,"某二级公路改造工程中的K1+000～K1+200段路堤右侧坡脚处受河水浸泡，在洪水作用下，旧路坡脚垮塌，急需抢修，对此最宜选用的路基防护是()。",[60,62,64,66],{"key":20,"text":61,"correct":22},"喷射混凝土封面",{"key":24,"text":63,"correct":22},"干砌片石护坡",{"key":28,"text":65,"correct":26},"抛石防护",{"key":31,"text":67,"correct":22},"护面墙",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":31,"analysis":33},1110941,"关于加筋土挡土墙施工要求的说法，错误的是()。",[72,74,76,78],{"key":20,"text":73,"correct":22},"安装直立式墙面板应按不同填料和拉筋预设仰斜坡",{"key":24,"text":75,"correct":22},"拉筋应呈水平铺设",{"key":28,"text":77,"correct":22},"严禁平行于拉筋方向碾压",{"key":31,"text":79,"correct":26},"墙后填土宜采用羊足碾碾压",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":24,"analysis":33},1110942,"（2019年）土工膜袋护坡的侧翼宜设（ ）。",[84,86,88,90],{"key":20,"text":85,"correct":22},"护脚棱体",{"key":24,"text":87,"correct":26},"压袋沟",{"key":28,"text":89,"correct":22},"排水管",{"key":31,"text":91,"correct":22},"边界处理沟",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":24,"analysis":33},1110943,"岩石挖方路段不宜选用的挡土墙是（ ）。（2017年真题）",[96,97,99,100],{"key":20,"text":51,"correct":22},{"key":24,"text":98,"correct":26},"加筋土挡土墙",{"key":28,"text":41,"correct":22},{"key":31,"text":101,"correct":22},"锚定板式挡土墙",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":31,"analysis":33},1110944,"路基施工放样测量中，以平面曲线起点（或终点）至曲线任一点的弦线与切线之间的弦切角和弦长来确定待放点位置的方法称为()。",[106,108,110,112],{"key":20,"text":107,"correct":22},"切线支距法",{"key":24,"text":109,"correct":22},"坐标法",{"key":28,"text":111,"correct":22},"直角坐标法",{"key":31,"text":113,"correct":26},"偏角法",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":28,"analysis":33},1110945,"一级公路路基施工中线测量放样宜采用()。",[118,119,120,121],{"key":20,"text":107,"correct":22},{"key":24,"text":113,"correct":22},{"key":28,"text":109,"correct":26},{"key":31,"text":122,"correct":22},"视距交会法",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":31,"analysis":33},1110946,"高速公路中线放样主要依据的设计表格是()。",[127,129,131,133],{"key":20,"text":128,"correct":22},"路基设计表",{"key":24,"text":130,"correct":22},"水准点表",{"key":28,"text":132,"correct":22},"交点固定表",{"key":31,"text":134,"correct":26},"逐桩坐标表",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":28,"analysis":33},1110947,"土基最佳含水量是土基达到（）所对应的含水量。",[139,141,143,145],{"key":20,"text":140,"correct":22},"100%压实度",{"key":24,"text":142,"correct":22},"最大湿密度",{"key":28,"text":144,"correct":26},"最大干密度",{"key":31,"text":146,"correct":22},"液限",{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":28,"analysis":33},1110948,"土基达到最大干密度时所对应的含水量称为()。",[151,153,155,157],{"key":20,"text":152,"correct":22},"最大含水量",{"key":24,"text":154,"correct":22},"最小含水量",{"key":28,"text":156,"correct":26},"最佳含水量",{"key":31,"text":158,"correct":22},"天然含水量",{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":31,"analysis":33},1110949,"《公路路基施工技术规范》规定的弯沉值测试标准方法是()。",[163,165,167,169],{"key":20,"text":164,"correct":22},"自动弯沉仪法",{"key":24,"text":166,"correct":22},"落锤弯沉仪法",{"key":28,"text":168,"correct":22},"震动弯沉仪法",{"key":31,"text":170,"correct":26},"贝克曼梁法",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":20,"analysis":33},1110950,"（2020年真题）桥梁施工测量中，布设大桥、特大桥的主要控制桩（或其护桩），均应测量其（ ）。",[175,177,179,181],{"key":20,"text":176,"correct":26},"坐标、相互间的距离与角度",{"key":24,"text":178,"correct":22},"里程、相互间的距离与角度",{"key":28,"text":180,"correct":22},"高程、尺寸",{"key":31,"text":182,"correct":22},"坐标、高程、埋置深度",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":24,"analysis":33},1110951,"某路基碾压施工时，产生“弹簧”现象，宜采取的处理措施是()。",[187,189,191,193],{"key":20,"text":188,"correct":22},"增大压实机具功率",{"key":24,"text":190,"correct":26},"掺生石灰粉翻拌后压实",{"key":28,"text":192,"correct":22},"适量洒水",{"key":31,"text":194,"correct":22},"降低压路机碾压速度",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":28,"analysis":33},1110952,"不能保证路基边缘压实度的措施是()。",[199,201,203,205],{"key":20,"text":200,"correct":22},"控制碾压工艺，保证机具碾压到边",{"key":24,"text":202,"correct":22},"控制碾压顺序，确保轮迹重叠宽度",{"key":28,"text":204,"correct":26},"严格按照路基设计宽度填筑",{"key":31,"text":206,"correct":22},"确保边缘带碾压频率高于行车带",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":28,"analysis":33},1110953,"下列选项中，最易导致路基横向裂缝病害的原因是()。",[211,213,215,217],{"key":20,"text":212,"correct":22},"路基边坡过陡",{"key":24,"text":214,"correct":22},"旧路加宽利用路段，新旧路基结合部未挖台阶",{"key":28,"text":216,"correct":26},"暗涵结构物基底产生了沉降",{"key":31,"text":218,"correct":22},"横向半挖半填路基未设置台阶",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":28,"analysis":33},1110954,"（2020年真题）关于高填方路基沉降原因的说法，正确的是（ ）。",[223,225,227,229],{"key":20,"text":224,"correct":22},"未设置反压护道",{"key":24,"text":226,"correct":22},"高填方路堤两侧超填宽度过宽",{"key":28,"text":228,"correct":26},"路堤固结沉降",{"key":31,"text":230,"correct":22},"路基边缘压实遍数不够",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":31,"analysis":33},1110955,"关于抛石挤淤施工说法中，错误的是()。",[235,237,239,241],{"key":20,"text":236,"correct":22},"当下卧地层平坦时，应沿道路中线向前呈三角形抛填，再渐次向两旁展开，将淤泥挤向两侧",{"key":24,"text":238,"correct":22},"当下卧地层具有明显横向坡度时，应从下卧层高的一侧向低的一侧扩展，并在低侧边部多抛投不少于2米宽，形成平台顶面",{"key":28,"text":240,"correct":22},"在抛石高出水面后，应采用重型机具碾压紧密，然后在其上设反滤层，再填土压实",{"key":31,"text":242,"correct":26},"当下卧地层具有明显横向坡度时，应从下卧层高的一侧向低的一侧扩展，并在低侧边部多抛投不少于1米宽，形成平台顶面",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":28,"analysis":33},1110956,"（2018年）袋装砂井施工工艺流程中，最后一步工艺是（ ）。",[247,249,251,253],{"key":20,"text":248,"correct":22},"埋砂袋头",{"key":24,"text":250,"correct":22},"机具移位",{"key":28,"text":252,"correct":26},"摊铺上层砂垫层",{"key":31,"text":254,"correct":22},"拔出套管",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":24,"analysis":33},1110957,"（2018年）关于击实试验法测定最佳含水量的说法，错误的是（ ）。",[259,261,263,265],{"key":20,"text":260,"correct":22},"用干法或湿法制备一组不同含水量的试样",{"key":24,"text":262,"correct":26},"制备好的土样应一次性倒入击实筒",{"key":28,"text":264,"correct":22},"计算各试样干密度，以干密度为纵坐标、含水量为横坐标绘制曲线",{"key":31,"text":266,"correct":22},"当试样中有大于规定的颗粒，应先取出大颗粒，其百分率合格后，再对剩余试样进行击实试验",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":31,"analysis":33},1110958,"（2020年真题）软土地基处理时，水泥搅拌桩支挡型隔离墙宜采用（ ）。",[271,273,275,277],{"key":20,"text":272,"correct":22},"CFG桩",{"key":24,"text":274,"correct":22},"粒料桩",{"key":28,"text":276,"correct":22},"粉喷桩",{"key":31,"text":278,"correct":26},"浆喷桩",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":24,"analysis":33},1110959,"判别新建公路路基干湿类型的依据是()。",[283,285,287,289],{"key":20,"text":284,"correct":22},"分界相对含水量",{"key":24,"text":286,"correct":26},"路基临界高度",{"key":28,"text":288,"correct":22},"地表水及地下水位",{"key":31,"text":290,"correct":22},"路基填挖高度",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":31,"analysis":33},1110960,"路基改建加宽施工时，在路槽纵向开挖的台阶上铺设跨施工缝的土工格栅，其主要作用是（）。",[295,297,299,301],{"key":20,"text":296,"correct":22},"减少新老路基结合处的不均匀沉降",{"key":24,"text":298,"correct":22},"减少路面厚度",{"key":28,"text":300,"correct":22},"提高原地基承载力",{"key":31,"text":302,"correct":26},"减少裂缝反射",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":28,"analysis":33},1110961,"关于路基填料选择的错误说法是()。",[307,309,311,313],{"key":20,"text":308,"correct":22},"含水量不适宜直接压实的细粒土经处理后且检验合格可作为路基填料",{"key":24,"text":310,"correct":22},"含草皮、树根的土质严禁作为路基填料",{"key":28,"text":312,"correct":26},"强风化石料可以直接作为路基填料",{"key":31,"text":314,"correct":22},"级配良好的砾石混合料可以作为路基填料",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":20,"analysis":33},1110962,"在非岩石地基上，填筑填石路堤前，应按设计要求设置（）。",[319,321,323,325],{"key":20,"text":320,"correct":26},"过渡层",{"key":24,"text":322,"correct":22},"防水层",{"key":28,"text":324,"correct":22},"反滤层",{"key":31,"text":326,"correct":22},"整平层",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":24,"analysis":33},1110963,"农村公路施工中严禁使用的路基填筑材料是()。",[331,333,335,337],{"key":20,"text":332,"correct":22},"重粉质黏土",{"key":24,"text":334,"correct":26},"腐殖土",{"key":28,"text":336,"correct":22},"细砂",{"key":31,"text":338,"correct":22},"膨胀土",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":24,"analysis":33},1110964,"某三级公路路基K11+300～K11+420段为一跨越深谷的高填方路堤，沟谷陡峻，机械无法进入谷底，对该路堤主要采用()填筑。",[343,345,347,349],{"key":20,"text":344,"correct":22},"水平分层填筑法",{"key":24,"text":346,"correct":26},"竖向填筑法",{"key":28,"text":348,"correct":22},"纵向分层填筑法",{"key":31,"text":350,"correct":22},"纵向分层与水平分层交替填筑法",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":28,"analysis":33},1110965,"可直接用作路床填料的是()。",[355,357,359,361],{"key":20,"text":356,"correct":22},"粉质土",{"key":24,"text":358,"correct":22},"强风化石料",{"key":28,"text":360,"correct":26},"砾石土",{"key":31,"text":362,"correct":22},"强膨胀土",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":24,"analysis":33},1110966,"关于土石路堤筑要求的说法，错误的是（）。",[367,369,371,373],{"key":20,"text":368,"correct":22},"土石路堤不得倾填",{"key":24,"text":370,"correct":26},"压实后透水性差异大的土石混合料，宜纵向分幅填筑",{"key":28,"text":372,"correct":22},"压实机械宜采用自重不小于18t的振动压路机",{"key":31,"text":374,"correct":22},"中硬、硬质石料的土石路堤应进行边坡码砌",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":24,"analysis":33},1110967,"某四级公路路面面层采用水泥混凝土，路基填料为黏性土，路基压实度标准应采用()公路的规定值。",[379,381,383,385],{"key":20,"text":380,"correct":22},"一级",{"key":24,"text":382,"correct":26},"二级",{"key":28,"text":384,"correct":22},"三级",{"key":31,"text":386,"correct":22},"四级",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":24,"analysis":33},1110968,"当地下水埋藏较深或有固定含水层时，宜采用的地下水排除设施是()。",[391,393,395,397],{"key":20,"text":392,"correct":22},"渗沟",{"key":24,"text":394,"correct":26},"渗井",{"key":28,"text":396,"correct":22},"检查井",{"key":31,"text":398,"correct":22},"暗沟",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":24,"analysis":33},1110969,"石方填筑路堤的工艺流程中包括：①分层填筑；②检测签认；③振动碾压；④路基整修；⑤路基成型；⑥摊铺平整。其正确的顺序为()。",[403,405,407,409],{"key":20,"text":404,"correct":22},"②①③⑥④⑤",{"key":24,"text":406,"correct":26},"①⑥③②⑤④",{"key":28,"text":408,"correct":22},"①⑥③④⑤②",{"key":31,"text":410,"correct":22},"④①⑥③②⑤",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":24,"analysis":33},1110970,"可作为二级公路路床填料的是()。",[415,417,419,421],{"key":20,"text":416,"correct":22},"湿粘土",{"key":24,"text":418,"correct":26},"重粉质粘土",{"key":28,"text":420,"correct":22},"红粘土",{"key":31,"text":422,"correct":22},"弱膨胀土",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":24,"analysis":33},1110971,"《公路路基施工技术规范》规定特别干旱地区的路基压实度标准可()。",[427,429,431,433],{"key":20,"text":428,"correct":22},"降低1%",{"key":24,"text":430,"correct":26},"降低1%～2%",{"key":28,"text":432,"correct":22},"提高1%",{"key":31,"text":434,"correct":22},"提高2%～3%",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":20,"analysis":33},1110972,"填石路堤压实质量标准的控制指标宜采用()。",[439,441,443,445],{"key":20,"text":440,"correct":26},"孔隙率",{"key":24,"text":442,"correct":22},"压实度",{"key":28,"text":444,"correct":22},"沉降差",{"key":31,"text":446,"correct":22},"密度",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":28,"analysis":33},1110973,"岩石隧道的爆破应采用光面爆破技术或()，以有效控制隧道开挖表面质量。",[451,453,455,457],{"key":20,"text":452,"correct":22},"钻孔爆破技术",{"key":24,"text":454,"correct":22},"洞室爆破技术",{"key":28,"text":456,"correct":26},"预裂爆破技术",{"key":31,"text":458,"correct":22},"深孔爆破技术",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":28,"analysis":33},1110974,"一般情况下，同一路段应先施工的路基地面排水设施是()。",[463,465,467,469],{"key":20,"text":464,"correct":22},"边沟",{"key":24,"text":466,"correct":22},"急流槽",{"key":28,"text":468,"correct":26},"截水沟",{"key":31,"text":470,"correct":22},"拦水带",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":28,"analysis":33},1110975,"不属于土方路堤填筑常用机械的是（ ）。",[475,477,479,481],{"key":20,"text":476,"correct":22},"推土机",{"key":24,"text":478,"correct":22},"铲运机",{"key":28,"text":480,"correct":26},"压路机",{"key":31,"text":482,"correct":22},"挖掘机",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":24,"analysis":33},1110976,"用于公路路基的填料，其强度按( )确定。",[487,489,491,493],{"key":20,"text":488,"correct":22},"回弹模量",{"key":24,"text":490,"correct":26},"CBR值",{"key":28,"text":492,"correct":22},"压碎值",{"key":31,"text":494,"correct":22},"无侧限抗压强度",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":31,"analysis":33},1110977,"（2018年）不得直接填筑于冰冻地区三、四级公路下路床的填料是（ ）。",[499,500,501,502],{"key":20,"text":416,"correct":22},{"key":24,"text":422,"correct":22},{"key":28,"text":420,"correct":22},{"key":31,"text":356,"correct":26},{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":24,"analysis":33},1110978,"（2019年）关于支撑渗沟施工的说法，错误的是（ ）。",[507,509,511,513],{"key":20,"text":508,"correct":22},"支撑渗沟应分段间隔开挖",{"key":24,"text":510,"correct":26},"支撑渗沟侧壁宜设封闭层",{"key":28,"text":512,"correct":22},"支撑渗沟的基底宜埋入滑动面以下至少500mm",{"key":31,"text":514,"correct":22},"支撑渗沟的出水口宜设置端墙",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":20,"analysis":33},1110979,"（2019年）路基填土高度小于路面和路床总厚度时，基底应按设计要求处理。如对地基表层土进行超挖、分层回填压实，其处理深度不应小于（ ）。",[519,521,523,525],{"key":20,"text":520,"correct":26},"重型汽车荷载作用的工作区深度",{"key":24,"text":522,"correct":22},"路床总厚度",{"key":28,"text":524,"correct":22},"路堤和路床总厚度",{"key":31,"text":526,"correct":22},"天然地下承载深度",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":31,"analysis":33},1110980,"填石路基采用强力夯实施工时，填补夯坑的填料应选用（ ）。（2017年真题）",[531,533,535,537],{"key":20,"text":532,"correct":22},"碎石土",{"key":24,"text":534,"correct":22},"砂性土",{"key":28,"text":536,"correct":22},"软质石料",{"key":31,"text":538,"correct":26},"与路基同类型石质填料",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},1110981,"路基填料的强度指标是（ ）。（2017年真题）",[543,544,545,547],{"key":20,"text":442,"correct":22},{"key":24,"text":490,"correct":26},{"key":28,"text":546,"correct":22},"稳定度",{"key":31,"text":548,"correct":22},"塑性指数",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":24,"analysis":33},1110982,"对于地下水位较高且有重载交通行驶的路面，为隔绝地下水上升影响路面稳定性，应在路基顶面设置()。",[553,554,556,558],{"key":20,"text":324,"correct":22},{"key":24,"text":555,"correct":26},"垫层",{"key":28,"text":557,"correct":22},"稀浆封层",{"key":31,"text":559,"correct":22},"透层",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":28,"analysis":33},1110983,"水泥混凝土路面的排水基层宜采用()。",[564,566,568,570],{"key":20,"text":565,"correct":22},"开级配碎石",{"key":24,"text":567,"correct":22},"沥青处治开级配碎石",{"key":28,"text":569,"correct":26},"水泥处治开级配碎石",{"key":31,"text":571,"correct":22},"未筛分碎石",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":24,"analysis":33},1110984,"路面透水性排水基层施工中，在连续长纵坡坡段或凹形竖曲线路段，排水层内渗流的自由水有可能被堵封或渗流路径超过45~60m时，为拦截水流及缩短渗流长度有应增设（ ）。（2017年真题）",[576,578,580,582],{"key":20,"text":577,"correct":22},"纵向排水管",{"key":24,"text":579,"correct":26},"横向排水管",{"key":28,"text":581,"correct":22},"纵向集水管",{"key":31,"text":583,"correct":22},"横向铁水井",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":28,"analysis":33},1110985,"沥青玛蹄脂碎石的简称是()。",[588,590,592,594],{"key":20,"text":589,"correct":22},"SAC",{"key":24,"text":591,"correct":22},"SBS",{"key":28,"text":593,"correct":26},"SMA",{"key":31,"text":595,"correct":22},"AC-16",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":28,"analysis":33},1110986,"路面基层排水层的透水材料，透水性从高到低排序正确的是()。",[600,602,604,606],{"key":20,"text":601,"correct":22},"未经处治的开级配碎石集料＞沥青处治的碎石集料＞水泥处治的碎石集料",{"key":24,"text":603,"correct":22},"水泥处治的碎石集料＞未经处治的开级配碎石集料＞沥青处治的碎石集料",{"key":28,"text":605,"correct":26},"沥青处治的碎石集料＞水泥处治的碎石集料＞未经处治的开级配碎石集料",{"key":31,"text":607,"correct":22},"未经处治的开级配碎石集料＞水泥处治的碎石集料＞沥青处治的碎石集料",[609,612,615,618,621,624],{"id":15,"name":610,"category":7,"favorite":611},"领导干部任职前廉政法规知识测试题",92,{"id":613,"name":614,"category":7,"favorite":15},595,"建筑结构与设备",{"id":616,"name":617,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":619,"name":620,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":622,"name":623,"category":7,"favorite":8},534,"BIM工程师",{"id":625,"name":623,"category":7,"favorite":8},535]