[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,14,50,1644,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,248,260,272,284,296,305,317,329,341,353,365,377,389,401,413,425,437,449,461,473,485,497,509,521,533,545,557,569,579,591,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1110835,1,"单选题","（ ）作为现场施工成本控制的目标。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","现场施工成本偏差",false,{"key":24,"text":25,"correct":22},"B","现场施工成本降低额",{"key":27,"text":28,"correct":29},"C","现场施工计划成本",true,{"key":31,"text":32,"correct":22},"D","现场施工成本降低率","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1110836,"降低公路工程项目施工成本的方法和途径的说法，错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"进行合同交底是降低成本的关键之一",{"key":24,"text":41,"correct":22},"制定先进的、经济合理的施工方案是降低成本的关键之一",{"key":27,"text":43,"correct":22},"提高机械利用率是降低成本的关键之一",{"key":31,"text":45,"correct":29},"组织顺序施工以便减少资源投入以及放慢施工进度是降低成本的关键之一",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1110838,"已标价的工程量清单是一份以一定计量单位说明工程实物（ ）的文件。",[50,52,54,56],{"key":20,"text":51,"correct":22},"数量",{"key":24,"text":53,"correct":22},"质量",{"key":27,"text":55,"correct":22},"总量",{"key":31,"text":57,"correct":29},"价格",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1110839,"公路工程工程量清单编写的工程细目，根据工程的不同部位分为总则、路基、路面、桥梁、涵洞、隧道、绿化及环境保护设施和（ ）及预埋管线部分。",[62,64,66,68],{"key":20,"text":63,"correct":22},"机械设备",{"key":24,"text":65,"correct":22},"租赁设备",{"key":27,"text":67,"correct":29},"安全设施",{"key":31,"text":69,"correct":22},"暂定金额",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1110840,"发包人应在监理人出具交工付款证书的（ ）天内，将应支付款支付给承包人。发包人不按期支付的，按合同条款的约定，将逾期付款违约金支付给承包人。",[74,76,78,80],{"key":20,"text":75,"correct":22},"7",{"key":24,"text":77,"correct":29},"14",{"key":27,"text":79,"correct":22},"21",{"key":31,"text":81,"correct":22},"28",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1110841,"当材料、设备已用于或安装在永久工程之中时，材料、设备预付款应从进度付款正书中扣回，扣回期不超过（ ）个月。",[86,88,90,92],{"key":20,"text":87,"correct":22},"1",{"key":24,"text":89,"correct":22},"2",{"key":27,"text":91,"correct":29},"3",{"key":31,"text":93,"correct":22},"4",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1110842,"工程款价差调整的主要方法不包括（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"工程造价指数调整法",{"key":24,"text":101,"correct":22},"调值公式法",{"key":27,"text":103,"correct":22},"调价文件计算法",{"key":31,"text":105,"correct":29},"预计价格调整法",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1110843,"某工程2016年签合同时，2016年相对于2013年的材料综合物价指数为110%，2017年相对于2013年的材料综合物价指数为132%。计算2017年1000万元材料费的实际结算价为（ ）万元。",[110,112,114,116],{"key":20,"text":111,"correct":22},"1100",{"key":24,"text":113,"correct":29},"1200",{"key":27,"text":115,"correct":22},"1320",{"key":31,"text":117,"correct":22},"1420",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},1110844,"下列不属于工程量清单汇总表的内容的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"暂列金额",{"key":24,"text":125,"correct":22},"计日工合计",{"key":27,"text":127,"correct":22},"投标报价",{"key":31,"text":129,"correct":29},"单价和单价分析",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1110845,"下列关于工程量清单的编写说法，错误的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"清单说明主要说明在编制工程量清单时应遵守的规定及注意事项",{"key":24,"text":137,"correct":22},"不同种类的工作应分别列出项目",{"key":27,"text":139,"correct":22},"同一性质但施工部位或条件不同的工作应分别列出项目",{"key":31,"text":141,"correct":29},"劳务和施工机械两个计日工表的计量（或计价）单位是“日”",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1110846,"发包人应在监理人收到进度付款申请单且合格的增值税票后的28天内，将进度应付款支付给承包人，否则（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"承包人可以立即停工",{"key":24,"text":149,"correct":22},"承包人可解除合同",{"key":27,"text":151,"correct":22},"支付逾期付款复利利息",{"key":31,"text":153,"correct":29},"支付逾期付款违约金",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1110847,"关于小型构件预制场场地建设，下列说法正确的是()。",[158,160,162,164],{"key":20,"text":159,"correct":22},"路基土建标段小型构件预制场的占地面积宜小于2000㎡",{"key":24,"text":161,"correct":29},"布置要符合工厂化生产的要求，道路和排水畅通，场地四周用砖砌排水沟",{"key":27,"text":163,"correct":22},"每条生产线可以设置振动台，同时配备小型拌和站1座",{"key":31,"text":165,"correct":22},"成品可以不按规格堆码",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1110848,"关于沥青混凝土拌和站场地建设要求的说法错误的是()。",[170,172,174,176],{"key":20,"text":171,"correct":29},"沥青混凝土拌和站的占地面积在山岭重丘区不少于35000㎡",{"key":24,"text":173,"correct":22},"拌和站内宜设置工地试验室",{"key":27,"text":175,"correct":22},"拌和站的所有场地必须进行混凝土硬化处理",{"key":31,"text":177,"correct":22},"在场地外侧合适的位置设置沉砂井及污水过滤池，严禁将站内生产废水直接排放",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},1110849,"施工机械选择的一般原则不包括（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"适用性、先进性",{"key":24,"text":185,"correct":22},"通用性、专用性",{"key":27,"text":187,"correct":22},"经济性",{"key":31,"text":189,"correct":29},"美观性",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1110850,"水泥混凝土路面施工中，高等级公路施工宜选配宽度为（）m的大型滑模摊铺机。",[194,196,198,200],{"key":20,"text":195,"correct":22},"7～12",{"key":24,"text":197,"correct":29},"7.5～12.5",{"key":27,"text":199,"correct":22},"8～12",{"key":31,"text":201,"correct":22},"8.5～12.5",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},1110851,"关于设备选型及组合原则的说法错误的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"达到计划生产量确保工期",{"key":24,"text":209,"correct":22},"充分利用主机的生产能力",{"key":27,"text":211,"correct":29},"主体机械与辅助机械及运输工具之间的工作能力可分开单独考虑",{"key":31,"text":213,"correct":22},"进行比较和核算，使机械设备经营费用达到最低",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1110852,"大型机械设备和多班作业的机械必须建立（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":29},"机长责任制",{"key":24,"text":221,"correct":22},"项目经理责任制",{"key":27,"text":223,"correct":22},"监督人员责任制",{"key":31,"text":225,"correct":22},"业主责任制",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},1110853,"对于石方开挖工程，机械与设备组合的最好选择是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"推土机、铲运机、挖掘机、装载机和自卸汽车",{"key":24,"text":233,"correct":22},"推土机、挖掘机、装载机和平地机",{"key":27,"text":235,"correct":29},"挖掘机、推土机、移动式空气压缩机、凿岩机、爆破设备",{"key":31,"text":237,"correct":22},"推土机、铲运机、羊足碾、压路机、洒水车、平地机和自卸汽车",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},1110854,"对于清理基础和料场准备等路基施工前的准备工作，机械与设备组合的最好选择是（ ）。",[242,243,244,246],{"key":20,"text":233,"correct":29},{"key":24,"text":231,"correct":22},{"key":27,"text":245,"correct":22},"推土机、铲运机、压路机、洒水车、平地机和自卸汽车",{"key":31,"text":247,"correct":22},"平地机、推土机和挖掘机",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":27,"analysis":33},1110855,"关于混凝土搅拌设备的配置要求，下列说法错误的是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":22},"根据工作量选择生产能力和移动方式进行",{"key":24,"text":255,"correct":22},"根据工期选择生产能力和移动方式进行",{"key":27,"text":257,"correct":29},"一般摊铺能力要相当于生产能力的70%左右",{"key":31,"text":259,"correct":22},"高等级公路一般选用生产量高的强制式沥青混凝土搅拌设备",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":24,"analysis":33},1110856,"桥梁灌注桩钻孔施工，最广泛应用于卵石、漂石地质条件下的施工机械是（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"旋挖钻机",{"key":24,"text":267,"correct":29},"冲击钻机",{"key":27,"text":269,"correct":22},"液压循环钻机",{"key":31,"text":271,"correct":22},"潜水钻机",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":27,"analysis":33},1110857,"按我国目前规范要求，高等级公路沥青路面施工应使用（ ）设备。",[276,278,280,282],{"key":20,"text":277,"correct":22},"连续强制式搅拌",{"key":24,"text":279,"correct":22},"间歇滚筒式搅拌",{"key":27,"text":281,"correct":29},"间歇强制式搅拌",{"key":31,"text":283,"correct":22},"连续滚筒式搅拌",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":31,"analysis":33},1110858,"下列机械不属于桥梁工程施工的通用施工机械的是（ ）。",[288,290,292,294],{"key":20,"text":289,"correct":22},"各类运输车辆",{"key":24,"text":291,"correct":22},"混凝土搅拌站",{"key":27,"text":293,"correct":22},"混凝土泵车",{"key":31,"text":295,"correct":29},"静压沉桩机",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":24,"analysis":33},1110859,"对于土方开挖工程，选择的机械与设备组合最好的是（ ）。",[300,302,303,304],{"key":20,"text":301,"correct":22},"挖掘机、推土机、移动式空气压缩机、凿岩机",{"key":24,"text":231,"correct":29},{"key":27,"text":233,"correct":22},{"key":31,"text":237,"correct":22},{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":27,"analysis":33},1110860,"某石方路堑开挖的大量石方需调运到1000m外的路堤处，宜选择的运输机械是（ ）。",[309,311,313,315],{"key":20,"text":310,"correct":22},"自行式铲运机",{"key":24,"text":312,"correct":22},"拖式铲运机",{"key":27,"text":314,"correct":29},"自卸汽车",{"key":31,"text":316,"correct":22},"推土机",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":24,"analysis":33},1110861,"适合采用推土机进行运输作业的距离是（ ）m。",[321,323,325,327],{"key":20,"text":322,"correct":22},"20",{"key":24,"text":324,"correct":29},"70",{"key":27,"text":326,"correct":22},"500",{"key":31,"text":328,"correct":22},"1000",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":31,"analysis":33},1110862,"（）是利用活动颚板相对固定颚板的往复摆动对石块进行破碎的。这种破碎机可用于粗碎和中碎",[333,335,337,339],{"key":20,"text":334,"correct":22},"锤式破碎机",{"key":24,"text":336,"correct":22},"反击式破碎机",{"key":27,"text":338,"correct":22},"辊式破碎机",{"key":31,"text":340,"correct":29},"颚式破碎机",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":27,"analysis":33},1110863,"集开挖、支护、衬砌等多种作业于一体的大型隧道施工机械，根据隧道的断面尺寸设计生产的专用机械是（ ）。",[345,347,349,351],{"key":20,"text":346,"correct":22},"凿岩台机",{"key":24,"text":348,"correct":22},"臂式隧道掘进机",{"key":27,"text":350,"correct":29},"盾构机",{"key":31,"text":352,"correct":22},"锚杆台车",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},1110864,"下列关于滑模式摊铺施工的要求，说法错误的是（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":29},"水泥混凝土搅拌楼容量应满足滑模摊铺机施工速度0.5m\u002Fmin的要求",{"key":24,"text":360,"correct":22},"高等级公路施工宜选配宽度为7.5～12.5m的大型滑模摊铺机",{"key":27,"text":362,"correct":22},"远距离运输宜选混凝土罐送车",{"key":31,"text":364,"correct":22},"可配备1台轮式挖掘机辅助布料",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":31,"analysis":33},1110865,"连续式摊铺机的生产率计算公式是：Q=1000hBVpKb，Kb是（ ）。",[369,371,373,375],{"key":20,"text":370,"correct":22},"摊铺层厚度",{"key":24,"text":372,"correct":22},"摊铺层宽度",{"key":27,"text":374,"correct":22},"摊铺速度",{"key":31,"text":376,"correct":29},"时间利用系数",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":31,"analysis":33},1110866,"铲运车通常适合施工的条件是（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"干燥的粉砂土",{"key":24,"text":384,"correct":22},"潮湿的黏土",{"key":27,"text":386,"correct":22},"沼泽地带",{"key":31,"text":388,"correct":29},"含水量在25％以下的松散砂土",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":27,"analysis":33},1110867,"在施工组织设计时，施工进度计划一般在（ ）之后编制。",[393,395,397,399],{"key":20,"text":394,"correct":22},"季节性施工技术措施",{"key":24,"text":396,"correct":22},"主要分项工程施工工艺",{"key":27,"text":398,"correct":29},"主要工程项目的施工方案",{"key":31,"text":400,"correct":22},"安全管理与安全保证措施",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":27,"analysis":33},1110868,"在平原地区的路基施工中，（）为主要工序。",[405,407,409,411],{"key":20,"text":406,"correct":22},"移挖作填.",{"key":24,"text":408,"correct":22},"半填半挖",{"key":27,"text":410,"correct":29},"路基填方",{"key":31,"text":412,"correct":22},"排水设施",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":27,"analysis":33},1110869,"隧道施工中，以（ ）为中心布置施工场地。",[417,419,421,423],{"key":20,"text":418,"correct":22},"钻爆",{"key":24,"text":420,"correct":22},"支护",{"key":27,"text":422,"correct":29},"洞口",{"key":31,"text":424,"correct":22},"项目部",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":27,"analysis":33},1110870,"（ ）是施工组织设计的重要组成部分，是编制各项资源需求和进场计划的依据。",[429,431,433,435],{"key":20,"text":430,"correct":22},"施工总体部署",{"key":24,"text":432,"correct":22},"施工总平面布置图",{"key":27,"text":434,"correct":29},"施工进度计划",{"key":31,"text":436,"correct":22},"材料运输计划",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":27,"analysis":33},1110871,"施工方案的优化中，主要通过（）的优化使得在取得好的经济效益同时还要有技术上的先进性。",[441,443,445,447],{"key":20,"text":442,"correct":22},"施工顺序",{"key":24,"text":444,"correct":22},"施工劳动组织",{"key":27,"text":446,"correct":29},"施工方法",{"key":31,"text":448,"correct":22},"施工作业组织形式",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":24,"analysis":33},1110872,"（ ）是施工单位承包工程的依据，也是编制施工组织设计的基本依据。",[453,455,457,459],{"key":20,"text":454,"correct":22},"预算单价",{"key":24,"text":456,"correct":29},"施工合同文件",{"key":27,"text":458,"correct":22},"施工现场环境",{"key":31,"text":460,"correct":22},"预算定额",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":31,"analysis":33},1110873,"以下不属于施工总体部署内容的是（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":22},"建立施工管理机构",{"key":24,"text":468,"correct":22},"施工任务划分",{"key":27,"text":470,"correct":22},"施工顺序安排",{"key":31,"text":472,"correct":29},"施工总平面图设计",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},1110874,"施工平面布置图包含的内容一般不包括（ ） 。",[477,479,481,483],{"key":20,"text":478,"correct":22},"原有地形地物.",{"key":24,"text":480,"correct":29},"距离施工现场较远的城镇",{"key":27,"text":482,"correct":22},"安全消防设施.",{"key":31,"text":484,"correct":22},"施工防排水临时设施",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":27,"analysis":33},1110875,"桥墩流水施工的桥墩数量太多时，将多个桥墩的相同工序合并为一个工序，简化为相同桥墩不同工序之间的逻辑关系，此时的逻辑关系是（ ）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"开始到完成",{"key":24,"text":492,"correct":22},"完成到开始",{"key":27,"text":494,"correct":29},"搭接关系",{"key":31,"text":496,"correct":22},"衔接关系",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":24,"analysis":33},1110876,"确定隧道掘进循环进尺应注意的问题是（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"危险品库房按有关安全规定办理",{"key":24,"text":504,"correct":29},"钻爆作业设计",{"key":27,"text":506,"correct":22},"合理布置大堆材料堆放位置大",{"key":31,"text":508,"correct":22},"输通道应统一规划、布局合理",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":31,"analysis":33},1110877,"S曲线是以时间为横轴，以（ ）为纵轴的图表曲线。",[513,515,517,519],{"key":20,"text":514,"correct":22},"各分部工程",{"key":24,"text":516,"correct":22},"工作内容",{"key":27,"text":518,"correct":22},"工程位置",{"key":31,"text":520,"correct":29},"累计完成的工程费用的百分数",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":27,"analysis":33},1110878,"属于公路工程常用的流水时间参数的是（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"施工过程数",{"key":24,"text":528,"correct":22},"工作面",{"key":27,"text":530,"correct":29},"流水节拍",{"key":31,"text":532,"correct":22},"流水强度",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":20,"analysis":33},1110879,"在中标通知书发出后合同规定的时间内，承包人应向（ ）书面提交一份详细和格式符合要求的工程总体进度计划。",[537,539,541,543],{"key":20,"text":538,"correct":29},"监理工程师",{"key":24,"text":540,"correct":22},"业主",{"key":27,"text":542,"correct":22},"质量监督站",{"key":31,"text":544,"correct":22},"上级公司",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":31,"analysis":33},1110880,"在选择路面各结构层之间搭接类型时，后道工序快于前道工序时，应选择（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"STS",{"key":24,"text":552,"correct":22},"STF",{"key":27,"text":554,"correct":22},"FTS",{"key":31,"text":556,"correct":29},"FTF",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},1110881,"桥墩施工时，如果设备或者模板数量有限时宜采用（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":22},"平行施工",{"key":24,"text":564,"correct":29},"流水施工",{"key":27,"text":566,"correct":22},"顺序施工.",{"key":31,"text":568,"correct":22},"平行顺序施工",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":20,"analysis":33},1110882,"路面工程施工中，相邻结构层之间的速度决定了相邻结构层之间的搭接类型，前道工序的速度快于后道工序时选用（ ）搭接类型。",[573,575,576,577],{"key":20,"text":574,"correct":29},"开始到开始",{"key":24,"text":490,"correct":22},{"key":27,"text":492,"correct":22},{"key":31,"text":578,"correct":22},"完成到完成",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":31,"analysis":33},1110883,"工程进度计划中以时间为横轴，以累计完成的工程费用的百分数为纵轴的图表化曲线称为（ ）。",[583,585,587,589],{"key":20,"text":584,"correct":22},"横道图",{"key":24,"text":586,"correct":22},"斜率图",{"key":27,"text":588,"correct":22},"网络图",{"key":31,"text":590,"correct":29},"“S”曲线",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":31,"analysis":33},1110884,"管涵施工中,水泥混凝土垫层施工与吊装涵管之间应选用（ ）搭接类型。",[595,596,597,598],{"key":20,"text":574,"correct":22},{"key":24,"text":490,"correct":22},{"key":27,"text":492,"correct":22},{"key":31,"text":578,"correct":29},{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":20,"analysis":33},1110885,"在工程管理曲线中，当实际支付线低于计划线时，表明（ ）。",[603,605,607,609],{"key":20,"text":604,"correct":29},"进度延误",{"key":24,"text":606,"correct":22},"进度提前",{"key":27,"text":608,"correct":22},"成本节约",{"key":31,"text":610,"correct":22},"成本超支",[612,615,618,621,624,627],{"id":15,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":15},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":625,"name":626,"category":7,"favorite":8},534,"BIM工程师",{"id":628,"name":626,"category":7,"favorite":8},535]