[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,13,50,1644,[13,34,46,58,69,81,93,105,117,126,137,148,160,172,182,194,206,218,230,242,254,266,278,290,302,313,325,337,349,361,373,385,397,409,421,432,444,456,468,477,489,501,513,525,537,549,561,573,585,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1110784,1,"单选题","分项工程质量检验内容包括基本要求、实测项目、外观鉴定和（ ）四个部分。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","原材料产地",false,{"key":24,"text":25,"correct":22},"B","施工方法",{"key":27,"text":28,"correct":29},"C","质量保证资料",true,{"key":31,"text":32,"correct":22},"D","新技术工艺","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1110785,"公路工程现场质量检查控制的方法不包括（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"观察",{"key":24,"text":41,"correct":29},"审核",{"key":27,"text":43,"correct":22},"测量",{"key":31,"text":45,"correct":22},"分析",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1110786,"简支梁桥的质量控制关键点不包括（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":29},"拱肋拱轴线的控制",{"key":24,"text":53,"correct":22},"预拱度的控制",{"key":27,"text":55,"correct":22},"梁板之间现浇带混凝土质量控制",{"key":31,"text":57,"correct":22},"支座、护栏等预埋件的位置控制",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1110787,"下列不属于简支梁桥施工中常见质量控制点的是（ ）。",[62,64,66,67],{"key":20,"text":63,"correct":29},"支架沉降量的控制",{"key":24,"text":65,"correct":22},"支座预埋件的位置控制",{"key":27,"text":53,"correct":22},{"key":31,"text":68,"correct":22},"支座安装型号、方向的控制",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":31,"analysis":33},1110788,"下列不属于水泥混凝土路面施工中常见质量控制关键点的是（ ）。",[73,75,77,79],{"key":20,"text":74,"correct":22},"切缝时间和养护的掌握",{"key":24,"text":76,"correct":22},"混凝土的摊铺、振捣、成型及避免离析",{"key":27,"text":78,"correct":22},"混凝土材料的检查与试验",{"key":31,"text":80,"correct":29},"路面施工机械设备配置与组合",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":20,"analysis":33},1110789,"下列不属于水泥混凝土路面主要检验内容的是（ ）。",[85,87,89,91],{"key":20,"text":86,"correct":29},"水泥路面强度",{"key":24,"text":88,"correct":22},"水泥混凝土路面的抗滑构造深度",{"key":27,"text":90,"correct":22},"水泥混凝土面板的弯拉强度",{"key":31,"text":92,"correct":22},"水泥混凝土路面中线平面偏位",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},1110790,"钢筋笼接头质量如果存在问题将会对（ ）施工质量产生影响。",[97,99,101,103],{"key":20,"text":98,"correct":22},"扩大基础",{"key":24,"text":100,"correct":29},"钻孔桩",{"key":27,"text":102,"correct":22},"挖孔桩",{"key":31,"text":104,"correct":22},"沉井",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":31,"analysis":33},1110791,"稳定土基层和底基层实测项目中不包含（）。",[109,111,113,115],{"key":20,"text":110,"correct":22},"平整度",{"key":24,"text":112,"correct":22},"强度",{"key":27,"text":114,"correct":22},"压实度",{"key":31,"text":116,"correct":29},"透水度",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":27,"analysis":33},1110792,"沥青混凝土面层的实测项目不包含（ ）。",[121,122,124,125],{"key":20,"text":110,"correct":22},{"key":24,"text":123,"correct":22},"弯沉值",{"key":27,"text":112,"correct":29},{"key":31,"text":114,"correct":22},{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":24,"analysis":33},1110793,"梁（板）预制实测项目中为关键实测项目的是梁（板）的（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":22},"长度",{"key":24,"text":133,"correct":29},"混凝土强度",{"key":27,"text":135,"correct":22},"高度",{"key":31,"text":110,"correct":22},{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":24,"analysis":33},1110794,"土方路基实测项目中为关键项目的是（ ）。",[141,143,144,146],{"key":20,"text":142,"correct":22},"中线偏位",{"key":24,"text":123,"correct":29},{"key":27,"text":145,"correct":22},"横坡",{"key":31,"text":147,"correct":22},"边坡",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":20,"analysis":33},1110795,"钻孔灌注桩施工中，钻孔的倾斜度不得大于（ ）。",[152,154,156,158],{"key":20,"text":153,"correct":29},"1%",{"key":24,"text":155,"correct":22},"2%",{"key":27,"text":157,"correct":22},"1.5%",{"key":31,"text":159,"correct":22},"3%",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":27,"analysis":33},1110796,"在后张法预应力筋的加工和张拉中，张拉伸长率需控制在（ ） 范围内。",[164,166,168,170],{"key":20,"text":165,"correct":22},"十4%",{"key":24,"text":167,"correct":22},"土5%",{"key":27,"text":169,"correct":29},"土6%",{"key":31,"text":171,"correct":22},"士8%",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":24,"analysis":33},1110797,"桥梁基础工程中钻孔桩施工常见的质量控制点是（）。",[176,178,180,181],{"key":20,"text":177,"correct":22},"基底表面松散层的清理",{"key":24,"text":179,"correct":29},"护筒内水头高度",{"key":27,"text":65,"correct":22},{"key":31,"text":53,"correct":22},{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":31,"analysis":33},1110798,"工程质量控制关键点的文件中，不包括（）",[186,188,190,192],{"key":20,"text":187,"correct":22},"质量控制关键点明细表",{"key":24,"text":189,"correct":22},"工序质量信息",{"key":27,"text":191,"correct":22},"质量控制关键点作业流程图",{"key":31,"text":193,"correct":29},"工程施工作业指导书",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":20,"analysis":33},1110799,"下列不属于预应力混凝土连续梁桥施工常见质量控制点的是（ ）。",[198,200,202,204],{"key":20,"text":199,"correct":29},"张拉力及预应力钢筋伸长量控制",{"key":24,"text":201,"correct":22},"支架浇筑时支架沉降量的控制",{"key":27,"text":203,"correct":22},"先简支后连续：后浇段工艺控制、体系转换工艺控制、后浇段收缩控制、临时支座安装与拆除控制",{"key":31,"text":205,"correct":22},"预应力粱：张拉预应力钢筋及压浆控制",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":24,"analysis":33},1110800,"在确定控制措施或考虑改变现行控制措施时考虑按（ ）顺序选择风险控方法。",[210,212,214,216],{"key":20,"text":211,"correct":22},"替代→消除→工程控制措施→标志、警告或管理控制→个人防护设",{"key":24,"text":213,"correct":29},"消除→替代→工程控制措施→标志、警告或管理控制→个人防护设备",{"key":27,"text":215,"correct":22},"消除→替代→标志、警告或管理控制→工程控制措施→个人防护设备",{"key":31,"text":217,"correct":22},"标志、警告或管理控制→替代一工程控制措施→消除→个人防护设备",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":31,"analysis":33},1110801,"不是专项施工方案主要内容的是 （ ）。",[222,224,226,228],{"key":20,"text":223,"correct":22},"劳动力计划",{"key":24,"text":225,"correct":22},"安全保证措施",{"key":27,"text":227,"correct":22},"计算书",{"key":31,"text":229,"correct":29},"施工报告",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":20,"analysis":33},1110802,"隐患内容中，未按审批的专项施工方案施工是属于（ ）类别重大隐患。",[234,236,238,240],{"key":20,"text":235,"correct":29},"工程管理",{"key":24,"text":237,"correct":22},"方案管理",{"key":27,"text":239,"correct":22},"组织管理",{"key":31,"text":241,"correct":22},"危险源管理",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":31,"analysis":33},1110803,"参加应急预案评审的人员可以是（ ）。",[246,248,250,252],{"key":20,"text":247,"correct":22},"施工单位的作为专家的总工",{"key":24,"text":249,"correct":22},"施工单位的作为专家的退休高工.",{"key":27,"text":251,"correct":22},"施工方上级主管作为专家的高工",{"key":31,"text":253,"correct":29},"项目主管部门作为专家的人员",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":24,"analysis":33},1110804,"基坑外堆土时，堆土应距基坑边缘（ ）m以外，堆土高度不得超过1.5m。",[258,260,262,264],{"key":20,"text":259,"correct":22},"0.5",{"key":24,"text":261,"correct":29},"1",{"key":27,"text":263,"correct":22},"2",{"key":31,"text":265,"correct":22},"3",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":27,"analysis":33},1110805,"下列支架现浇法施工风险控制措施错误的是（ ）。",[270,272,274,276],{"key":20,"text":271,"correct":22},"支架的立柱应设水平撑和双向斜撑",{"key":24,"text":273,"correct":22},"支架立柱应置于平整、坚实的地基上",{"key":27,"text":275,"correct":29},"立柱高于6m时水平撑间距不得大于2m",{"key":31,"text":277,"correct":22},"支架高度较高时，应设一组缆风绳",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":24,"analysis":33},1110806,"下列隧道工程洞口失稳控制措施中错误的开挖控制措施是（ ）",[282,284,286,288],{"key":20,"text":283,"correct":22},"控制开挖量等减少围岩扰动",{"key":24,"text":285,"correct":29},"采用台阶开挖时第一步开挖的台阶高度不宜超过1\u002F4的开挖高度",{"key":27,"text":287,"correct":22},"临时支护拆除后，及时施作二次衬砌",{"key":31,"text":289,"correct":22},"超前支护应及时到位，中间围岩开挖后及时封闭初期支护",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":27,"analysis":33},1110807,"施工现场临时用电必须按照（ ） 的设置。",[294,296,298,300],{"key":20,"text":295,"correct":22},"二级配电一级保护",{"key":24,"text":297,"correct":22},"一级配电一级保护",{"key":27,"text":299,"correct":29},"三级配电二级保护",{"key":31,"text":301,"correct":22},"三级配电三级保护",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":27,"analysis":33},1110808,"在高处作业要求中，安全绳长度不应超过（ ）m。",[306,308,310,311],{"key":20,"text":307,"correct":22},"6",{"key":24,"text":309,"correct":22},"5",{"key":27,"text":263,"correct":29},{"key":31,"text":312,"correct":22},"4",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":20,"analysis":33},1110809,"公路工程合同体系中处于的核心位置的是（ ）。",[317,319,321,323],{"key":20,"text":318,"correct":29},"业主",{"key":24,"text":320,"correct":22},"承包人",{"key":27,"text":322,"correct":22},"监理人",{"key":31,"text":324,"correct":22},"政府",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":27,"analysis":33},1110810,"关于高处作业安全技术要求的说法，错误的有（ ）。",[329,331,333,335],{"key":20,"text":330,"correct":22},"安全绳有效长度不应大于2m",{"key":24,"text":332,"correct":22},"安全带的安全绳不得打结使用，安全绳上不得挂钩",{"key":27,"text":334,"correct":29},"有两根安全绳的安全带，单根绳的有效长度不应大于.2m",{"key":31,"text":336,"correct":22},"安全带应高挂低用，并应扣牢在牢固的物体上",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":20,"analysis":33},1110811,"某项目部在设置了管生产的专职副经理的同时，为了强调安全的重要性专门设置了管安全的副经理，这种做法实际上违背了（ ） 原则。",[341,343,345,347],{"key":20,"text":342,"correct":29},"管生产经营必须管安全",{"key":24,"text":344,"correct":22},"谁主管谁负责",{"key":27,"text":346,"correct":22},"预防为主",{"key":31,"text":348,"correct":22},"动态管理",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":20,"analysis":33},1110812,"对滑坡地段进行开挖时应（ ）。",[353,355,357,359],{"key":20,"text":354,"correct":29},"滑坡体两侧向中部自上而下进行",{"key":24,"text":356,"correct":22},"滑坡体中部向两侧自上而下进行",{"key":27,"text":358,"correct":22},"滑坡体两侧向中部自下而上进行",{"key":31,"text":360,"correct":22},"全面拉槽开挖",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":31,"analysis":33},1110813,"下列翻模法施工风险防控措施错误的是（ ）。",[365,367,369,371],{"key":20,"text":366,"correct":22},"高墩翻模施工应编制专项施工方案并组织专家论证",{"key":24,"text":368,"correct":22},"翻模强度刚度及稳定性应满足要求",{"key":27,"text":370,"correct":22},"翻模施工时使用起重设备应经检测合格安全装置齐全有效",{"key":31,"text":372,"correct":29},"高墩施工人员上下须使用一字形爬梯",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":31,"analysis":33},1110814,"下列悬臂浇筑施工风险控制措施错误的是（ ）。",[377,379,381,383],{"key":20,"text":378,"correct":22},"挂篮加工完成后应先进行试拼",{"key":24,"text":380,"correct":22},"挂篮拼装时应两边对称进行",{"key":27,"text":382,"correct":22},"浇筑墩顶段（0号段）混凝土前应对托架模板进行检验和预压",{"key":31,"text":384,"correct":29},"预压的目的是消除杆件弹性变形和地基沉降",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":27,"analysis":33},1110815,"根据《公路工程施工安全技术规范》JTG F90-2015 等6.3.3条规定，地面横向坡度陡于1 : 10的区域，取土坑应设在路堤（ ）。",[389,391,393,395],{"key":20,"text":390,"correct":22},"左侧",{"key":24,"text":392,"correct":22},"右侧",{"key":27,"text":394,"correct":29},"上侧",{"key":31,"text":396,"correct":22},"下侧",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":24,"analysis":33},1110816,"承包商履行合同的基础是（ ）。",[401,403,405,407],{"key":20,"text":402,"correct":22},"与供货商签订合同",{"key":24,"text":404,"correct":29},"业主履行合同",{"key":27,"text":406,"correct":22},"协调现场周边环境",{"key":31,"text":408,"correct":22},"如期进入现场",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":31,"analysis":33},1110818,"引起承包人索赔的因素众多，不是承包人索赔因素是（ ）。",[413,415,417,419],{"key":20,"text":414,"correct":22},"赶工",{"key":24,"text":416,"correct":22},"开工受阻",{"key":27,"text":418,"correct":22},"气候影响",{"key":31,"text":420,"correct":29},"施工机械故障的停工",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},1110819,"公路工程合同索赔事件发生后在合同规定的期限内，向（ ）发出索赔意向通知。",[425,427,429,431],{"key":20,"text":426,"correct":29},"监理工程师",{"key":24,"text":428,"correct":22},"发包人",{"key":27,"text":430,"correct":22},"建造师",{"key":31,"text":320,"correct":22},{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":27,"analysis":33},1110820,"在整个公路工程合同体系中，核心合同是（ ）。",[436,438,440,442],{"key":20,"text":437,"correct":22},"勘察合同",{"key":24,"text":439,"correct":22},"设计合同",{"key":27,"text":441,"correct":29},"施工合同",{"key":31,"text":443,"correct":22},"供货合同",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":20,"analysis":33},1110821,"施工索赔是指在施工合同履行过程中，合同一方因对方不履行或不适当履行合同义务而遭受损失时向对方提出的价款与（ ）补偿的要求。",[448,450,452,454],{"key":20,"text":449,"correct":29},"工期",{"key":24,"text":451,"correct":22},"计日工",{"key":27,"text":453,"correct":22},"人员工资",{"key":31,"text":455,"correct":22},"机械台班",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":24,"analysis":33},1110822,"公路施工合同条款中规定，下列文件中优先级最高的是（ ）。",[460,462,464,466],{"key":20,"text":461,"correct":22},"项目专用条款",{"key":24,"text":463,"correct":29},"中标通知书",{"key":27,"text":465,"correct":22},"工程量清单",{"key":31,"text":467,"correct":22},"公路专用条款",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":20,"analysis":33},1110823,"分包合同履行过程中，当分包人认为自己的合法权益受到损害，分包人可向（ ）提出索赔要求。",[472,473,474,475],{"key":20,"text":320,"correct":29},{"key":24,"text":428,"correct":22},{"key":27,"text":322,"correct":22},{"key":31,"text":476,"correct":22},"法院",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":31,"analysis":33},1110824,"重大工程变更，业主在审批工程变更之前应事先取得（ ）的批准。",[481,483,485,487],{"key":20,"text":482,"correct":22},"业主单位的上级主管单位",{"key":24,"text":484,"correct":22},"施工单位的上级主管单位",{"key":27,"text":486,"correct":22},"监理单位的上级主管单位",{"key":31,"text":488,"correct":29},"国家计划主管部门",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":24,"analysis":33},1110825,"合同文件有：（1）技术规范；（2）中标通知书；（3）图纸；（4）公路工程专用合同条款；（5）项目专用合同条款；（6）已标价工程量清单。下列优先级顺序正确的是（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"（1）（3）（2）（5）（6）（4）",{"key":24,"text":496,"correct":29},"（2）（5）（4）（1）（3）（6）",{"key":27,"text":498,"correct":22},"（2）（3）（1）（4）（5）（6）",{"key":31,"text":500,"correct":22},"（2）（1）（3）（6）（4）（5）",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":24,"analysis":33},1110826,"施工中，监理工程师在收到承包人书面建议后，应与发包人共同研究，确认存在变更的，应在收到承包人书面建议后的（ ）天内作出变更指示。",[505,507,509,511],{"key":20,"text":506,"correct":22},"10",{"key":24,"text":508,"correct":29},"14",{"key":27,"text":510,"correct":22},"16",{"key":31,"text":512,"correct":22},"20",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":24,"analysis":33},1110827,"变更工程的单价原则，其一是（ ），其二是公平合理原则。",[517,519,521,523],{"key":20,"text":518,"correct":22},"发包人最终确定原则",{"key":24,"text":520,"correct":29},"约定优先原则",{"key":27,"text":522,"correct":22},"监理工程师审批原则",{"key":31,"text":524,"correct":22},"协商一致原则",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},1110828,"分包工程中的关系是（ ）。",[529,531,533,535],{"key":20,"text":530,"correct":22},"发包人与分包人有合同关系",{"key":24,"text":532,"correct":29},"承包人与分包人有合同关系",{"key":27,"text":534,"correct":22},"监理人与分包人有合同关系",{"key":31,"text":536,"correct":22},"监理人与分包人有监理关系",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":24,"analysis":33},1110829,"下列有关工程成本控制的说法，错误的是（ ）。",[541,543,545,547],{"key":20,"text":542,"correct":22},"应以目标成本控制成本支出",{"key":24,"text":544,"correct":29},"应在项目成本计划的基础上编制成本预测",{"key":27,"text":546,"correct":22},"应建立资源消耗台账实行资源消耗的中间控制",{"key":31,"text":548,"correct":22},"应加强质量管理控制质量成本",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":31,"analysis":33},1110830,"对材料进行数量控制的主要方法是（ ）。",[553,555,557,559],{"key":20,"text":554,"correct":22},"减少材料购买量",{"key":24,"text":556,"correct":22},"控制场外运输损耗",{"key":27,"text":558,"correct":22},"控制保管损耗",{"key":31,"text":560,"correct":29},"实行“限额领料”",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":24,"analysis":33},1110831,"进行工期和成本的同步控制的方法是（ ）。",[565,567,569,571],{"key":20,"text":566,"correct":22},"偏差分析法",{"key":24,"text":568,"correct":29},"净值法",{"key":27,"text":570,"correct":22},"控制消耗法",{"key":31,"text":572,"correct":22},"限额领料法",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":27,"analysis":33},1110832,"根据年度生产计划中计划的工程量和标后预算清单单价计算的预算成本是（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":22},"项目预测成本",{"key":24,"text":580,"correct":22},"项目预算成本",{"key":27,"text":582,"correct":29},"计划预算成本",{"key":31,"text":584,"correct":22},"实际预算成本",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":27,"analysis":33},1110833,"工程项目成本计划应在（ ）的组织和主持下。",[589,591,593,595],{"key":20,"text":590,"correct":22},"公司总经济师",{"key":24,"text":592,"correct":22},"公司造价师",{"key":27,"text":594,"correct":29},"项目经理",{"key":31,"text":596,"correct":22},"项目造价师",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":24,"analysis":33},1110834,"施工计划成本偏差正值是表示（ ）。",[601,603,605,607],{"key":20,"text":602,"correct":22},"进度超前",{"key":24,"text":604,"correct":29},"计划预控不到位",{"key":27,"text":606,"correct":22},"进度拖延",{"key":31,"text":608,"correct":22},"计划预控到位",[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]