[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,11,50,1644,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,200,212,223,231,243,255,264,276,288,300,308,317,328,337,349,361,370,382,394,406,417,429,441,453,465,476,488,500,512,524,536,548,560,572,584],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1110683,1,"单选题","下面关于后张法预制梁板说法错误的是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","台座用表面压光的梁（板）筑成，应坚固不沉陷，确保底模沉降不大于2mm",false,{"key":24,"text":25,"correct":22},"B","当预制梁跨大于20m时，要按规定设置反拱",{"key":27,"text":28,"correct":22},"C","使用龙门吊拆除模板，拆下的模板要顺序摆放，清除灰浆，以备再用",{"key":30,"text":31,"correct":32},"D","梁（板）的振捣以插入式振捣器为主，紧固安装在侧模上的附着式为辅",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1110684,"承台混凝土浇筑要（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"分段",{"key":24,"text":41,"correct":22},"分节",{"key":27,"text":43,"correct":32},"分层",{"key":30,"text":45,"correct":22},"分向",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1110685,"当地基计算沉降过大或结构物对不均匀沉降敏感时,可采用（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"沉井基础",{"key":24,"text":53,"correct":32},"桩基础",{"key":27,"text":55,"correct":22},"管柱",{"key":30,"text":57,"correct":22},"刚性基础",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1110686,"关于挖孔桩施工的技术要求，错误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"桩孔间距小于3倍桩径时必须间隔交错跳挖",{"key":24,"text":65,"correct":22},"桩孔必须挖一节、浇筑一节护壁",{"key":27,"text":67,"correct":22},"禁止任何车辆在桩孔边5m内行驶",{"key":30,"text":69,"correct":32},"桩孔每挖一节后，应进行孔底处理",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1110687,"对于梁式桥，设计洪水位上相邻两个桥墩（或桥台）之间的净距是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":32},"净跨径",{"key":24,"text":77,"correct":22},"总跨径",{"key":27,"text":79,"correct":22},"计算跨径",{"key":30,"text":81,"correct":22},"净矢高",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},1110688,"具有构造简单，受力明确，在同等条件下，跨径越大、单位跨度的材料耗费越少、造价越低的特点的桥梁是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"刚架桥",{"key":24,"text":89,"correct":22},"拱桥",{"key":27,"text":91,"correct":22},"梁式桥",{"key":30,"text":93,"correct":32},"悬索桥",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1110689,"对于砂土、硬塑及软塑的黏性土和中密及较松的碎石土，桥梁桩基础应采用（ ）进行沉桩。",[98,100,102,104],{"key":20,"text":99,"correct":22},"静力压桩法",{"key":24,"text":101,"correct":22},"锤击沉桩法",{"key":27,"text":103,"correct":32},"振动沉桩法",{"key":30,"text":105,"correct":22},"射水沉桩法",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1110690,"当桥墩较高，桥跨较长或桥下净空受到约束时，可以采用移动模架逐孔现浇施工。移动模架法适用在多跨长桥，桥梁跨径可达（）",[110,112,114,116],{"key":20,"text":111,"correct":22},"10m",{"key":24,"text":113,"correct":22},"100m",{"key":27,"text":115,"correct":32},"20~70m",{"key":30,"text":117,"correct":22},"80m",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},1110691,"桥梁上部结构采用后张法张拉时，构件混凝土强度应符合设计要求；若设计无要求时，应不低于设计强度等级值的（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"25%",{"key":24,"text":125,"correct":22},"30%",{"key":27,"text":127,"correct":22},"50%",{"key":30,"text":129,"correct":32},"80%",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1110692,"先张法预制梁板，张拉时，每个断面断丝之和不超过该断面钢丝总数的（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":32},"1%",{"key":24,"text":137,"correct":22},"2%",{"key":27,"text":139,"correct":22},"3%",{"key":30,"text":141,"correct":22},"5%",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1110693,"关于刚架桥的叙述错误的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"它是由受弯的上部梁（或板）与承压的下部柱（或墩）整体结合在一起的结构",{"key":24,"text":149,"correct":22},"由于梁与柱的刚性连接，梁因柱的抗弯刚度而得到卸载作用",{"key":27,"text":151,"correct":32},"刚架桥整个体系是简支结构，是没有推力的结构",{"key":30,"text":153,"correct":22},"刚架分直腿刚架与斜腿刚架",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1110694,"桥梁的基本组成除了上部结构、下部结构和附属设施外，还包括（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"桥面铺装",{"key":24,"text":161,"correct":32},"支座系统",{"key":27,"text":163,"correct":22},"伸缩缝",{"key":30,"text":165,"correct":22},"排水防水系统",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},1110695,"刚构桥的施工一般采用（ ）施工。",[170,172,174,176],{"key":20,"text":171,"correct":22},"整体现浇",{"key":24,"text":173,"correct":22},"转体",{"key":27,"text":175,"correct":32},"平衡悬臂施工",{"key":30,"text":177,"correct":22},"采用分次浇筑法",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":30,"analysis":33},1110696,"拱桥净跨径是每孔拱跨两拱脚截面（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"形心之间的直线距离",{"key":24,"text":185,"correct":22},"形心之间的水平距离",{"key":27,"text":187,"correct":22},"最低点之间的直线距离",{"key":30,"text":189,"correct":32},"最低点之间的水平距离",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":30,"analysis":33},1110697,"梁式桥设计洪水位上相邻两个桥墩（或桥台）之间的净距称之为（ ）。",[194,196,198,199],{"key":20,"text":195,"correct":22},"标准跨径",{"key":24,"text":197,"correct":22},"理论跨径",{"key":27,"text":79,"correct":22},{"key":30,"text":75,"correct":32},{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":20,"analysis":33},1110698,"计算矢高是从拱顶截面（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":32},"形心到两拱脚截面形心之间连线的垂直距离",{"key":24,"text":207,"correct":22},"形心到两拱脚截面最低点之间连线的垂直距离",{"key":27,"text":209,"correct":22},"下缘到两拱脚截面最低点之间连线的垂直距离",{"key":30,"text":211,"correct":22},"下缘到两拱脚截面形心之间连线的垂直距离",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":20,"analysis":33},1110699,"（ ）是古老的结构体系。梁作为承重结构是以它的抗弯能力来承受荷载的",[216,218,219,221],{"key":20,"text":217,"correct":32},"梁式体系.",{"key":24,"text":87,"correct":22},{"key":27,"text":220,"correct":22},"拱式桥",{"key":30,"text":222,"correct":22},"吊桥",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":20,"analysis":33},1110700,"一般适用于松散、中密砂土、粘性土的沉入桩施工方法（ ）。",[227,228,229,230],{"key":20,"text":101,"correct":32},{"key":24,"text":103,"correct":22},{"key":27,"text":105,"correct":22},{"key":30,"text":99,"correct":22},{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":24,"analysis":33},1110701,"钢管混凝土中承式拱桥是根据（ ）划分的。",[235,237,239,241],{"key":20,"text":236,"correct":22},"桥梁的用途",{"key":24,"text":238,"correct":32},"行车道位置",{"key":27,"text":240,"correct":22},"跨越障碍的性质",{"key":30,"text":242,"correct":22},"桥梁的全长",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":27,"analysis":33},1110702,"在钻孔桩施工质量控制中，清孔后的泥浆性能指标，相对密度为（ ）",[247,249,251,253],{"key":20,"text":248,"correct":22},"1.5",{"key":24,"text":250,"correct":22},"200",{"key":27,"text":252,"correct":32},"1.03~1.10",{"key":30,"text":254,"correct":22},"17~20",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":20,"analysis":33},1110703,"在钻孔灌注桩施工中，钻孔的倾斜度允许偏差为（ ）。",[259,260,261,263],{"key":20,"text":135,"correct":32},{"key":24,"text":137,"correct":22},{"key":27,"text":262,"correct":22},"1.5%",{"key":30,"text":139,"correct":22},{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":27,"analysis":33},1110704,"适用于无水或浅水河滩，地形相对平坦，孔数较多的中型梁板安装的架设方法是（ ）。",[268,270,272,274],{"key":20,"text":269,"correct":22},"自行式吊机架设法",{"key":24,"text":271,"correct":22},"简易型钢导梁架设法",{"key":27,"text":273,"correct":32},"跨墩龙门架架设法",{"key":30,"text":275,"correct":22},"联合架桥机架设法",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":20,"analysis":33},1110705,"适用于各类土（包括强风化岩）的水中基坑施工的围堰是（ ）。",[280,282,284,286],{"key":20,"text":281,"correct":32},"钢板桩围堰",{"key":24,"text":283,"correct":22},"双壁钢围堰",{"key":27,"text":285,"correct":22},"套箱围堰",{"key":30,"text":287,"correct":22},"土围堰",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":20,"analysis":33},1110706,"适用于无地下水或少量地下水，且较密实的土层或风化岩层的桩基础是（ ）。",[292,294,296,298],{"key":20,"text":293,"correct":32},"挖孔灌注桩",{"key":24,"text":295,"correct":22},"钻孔灌注桩",{"key":27,"text":297,"correct":22},"钢管桩",{"key":30,"text":299,"correct":22},"PHC桩",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":24,"analysis":33},1110707,"适用于深水基础施工的围堰工程是（ ）。",[304,305,306,307],{"key":20,"text":281,"correct":22},{"key":24,"text":283,"correct":32},{"key":27,"text":285,"correct":22},{"key":30,"text":287,"correct":22},{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},1110708,"适用于平坦无水桥孔的中小跨径预制梁板安装的方法是（ ）。",[312,313,314,315],{"key":20,"text":269,"correct":32},{"key":24,"text":271,"correct":22},{"key":27,"text":275,"correct":22},{"key":30,"text":316,"correct":22},"双导梁架桥机架设法",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":24,"analysis":33},1110709,"从拱顶截面形心至相邻两拱脚截面形心之连线的垂直距离为（ ）。",[321,322,324,326],{"key":20,"text":81,"correct":22},{"key":24,"text":323,"correct":32},"计算矢高",{"key":27,"text":325,"correct":22},"标准矢高",{"key":30,"text":327,"correct":22},"基准矢高",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":27,"analysis":33},1110710,"（ ）是大跨桥梁的主要形式。",[332,333,334,335],{"key":20,"text":91,"correct":22},{"key":24,"text":89,"correct":22},{"key":27,"text":93,"correct":32},{"key":30,"text":336,"correct":22},"钢架桥",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":27,"analysis":33},1110711,"采用导管法灌注水下混凝土前，应对导管作（ ）。",[341,343,345,347],{"key":20,"text":342,"correct":22},"抗剪和抗拉试验",{"key":24,"text":344,"correct":22},"水密和抗压试验",{"key":27,"text":346,"correct":32},"水密承压和抗拉试验",{"key":30,"text":348,"correct":22},"闭水和抗弯试验",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":24,"analysis":33},1110712,"预制构件应按吊装次序和方向水平分层堆放，堆放层数一般不宜超过（ ）。",[353,355,357,359],{"key":20,"text":354,"correct":22},"2层",{"key":24,"text":356,"correct":32},"3层",{"key":27,"text":358,"correct":22},"4层",{"key":30,"text":360,"correct":22},"5层",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":27,"analysis":33},1110713,"（ ）施工较复杂，一般用于跨径不大的城市桥或公路高架桥和立交桥。",[365,366,367,368],{"key":20,"text":220,"correct":22},{"key":24,"text":91,"correct":22},{"key":27,"text":87,"correct":32},{"key":30,"text":369,"correct":22},"斜拉桥",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1110714,"明挖扩大基础施工中，当土质较差有严重流沙现象，地下水位较高，挖基较深，坑壁不易稳定，用普通排水方法难以解决时，可采用（）",[374,376,378,380],{"key":20,"text":375,"correct":22},"集水坑排水法",{"key":24,"text":377,"correct":32},"井点排水法",{"key":27,"text":379,"correct":22},"帐幕法",{"key":30,"text":381,"correct":22},"板桩法",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},1110715,"张拉使用的张拉机及油泵、锚、夹具必须符合设计要求，并配套使用，配套定期校验，以准确标定（）",[386,388,390,392],{"key":20,"text":387,"correct":32},"张拉力与压力表读数间的关系曲线",{"key":24,"text":389,"correct":22},"张拉力与油泵读数间的关系曲线",{"key":27,"text":391,"correct":22},"张拉力与夹具读数间的关系曲线",{"key":30,"text":393,"correct":22},"张拉力与夹片读数间的关系曲线",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":27,"analysis":33},1110716,"下列复合式隧道监控量测项目中，属于选测项目的事（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"周边位移",{"key":24,"text":401,"correct":22},"拱顶下沉",{"key":27,"text":403,"correct":32},"钢支撑内力及外力",{"key":30,"text":405,"correct":22},"地质和支护状况观察",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":30,"analysis":33},1110717,"二次衬砌的工施作业应隧道位移相对值已达到相对位移量的（）以上后进行。",[410,412,413,415],{"key":20,"text":411,"correct":22},"20%",{"key":24,"text":125,"correct":22},{"key":27,"text":414,"correct":22},"60%",{"key":30,"text":416,"correct":32},"90%",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":30,"analysis":33},1110718,"适用于各种地质条件的超前地质预报是（ ）。",[421,423,425,427],{"key":20,"text":422,"correct":22},"水力联观测法",{"key":24,"text":424,"correct":22},"红外探测法",{"key":27,"text":426,"correct":22},"瞬变电磁法.",{"key":30,"text":428,"correct":32},"地质调查法",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":20,"analysis":33},1110719,"隧道周边位移的测量仪器 一般采用（ ）。",[433,435,437,439],{"key":20,"text":434,"correct":32},"收敛计",{"key":24,"text":436,"correct":22},"测缝计",{"key":27,"text":438,"correct":22},"声波仪.",{"key":30,"text":440,"correct":22},"水平仪",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":27,"analysis":33},1110720,"隧道监控量测时，当位移—时间曲线出现反弯点时，则表明围岩（ ）。",[445,447,449,451],{"key":20,"text":446,"correct":22},"刚刚稳定",{"key":24,"text":448,"correct":22},"已经稳定",{"key":27,"text":450,"correct":32},"不稳定",{"key":30,"text":452,"correct":22},"已经垮塌",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":30,"analysis":33},1110721,"复合式衬砌隧道和喷锚衬砌隧道施工时的现场监控量测的必测项目是（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"围岩体内位移（洞内设点）",{"key":24,"text":460,"correct":22},"围岩体内位移（地表设点）",{"key":27,"text":462,"correct":22},"围岩压力",{"key":30,"text":464,"correct":32},"洞内、外观察",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":30,"analysis":33},1110722,"在隧道施工监控量测中，收敛计是用来量测（ ）。",[469,470,472,474],{"key":20,"text":401,"correct":22},{"key":24,"text":471,"correct":22},"地表下沉",{"key":27,"text":473,"correct":22},"围岩体内位移",{"key":30,"text":475,"correct":32},"围岩周边位移",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":24,"analysis":33},1110723,"隧道监控量测时，测点应安设在距开挖面（ ）m的范围内。",[480,482,484,486],{"key":20,"text":481,"correct":22},"1",{"key":24,"text":483,"correct":32},"2",{"key":27,"text":485,"correct":22},"3",{"key":30,"text":487,"correct":22},"4",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":30,"analysis":33},1110724,"二次衬砌的施作时，应满足隧道位移相对值已达相对位移量的（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"40%~60%.",{"key":24,"text":495,"correct":22},"60%~80%",{"key":27,"text":497,"correct":22},"80%~90%.",{"key":30,"text":499,"correct":32},"90%以上",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":24,"analysis":33},1110725,"位于IV~ VI级围岩中且覆盖层厚度小于（ ）的隧道， 应进行地表沉降量测。",[504,506,508,510],{"key":20,"text":505,"correct":22},"35",{"key":24,"text":507,"correct":32},"40",{"key":27,"text":509,"correct":22},"45",{"key":30,"text":511,"correct":22},"50",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":30,"analysis":33},1110726,"某隧道是IV~ V级围岩，其覆盖层厚度为80~ 250m。有关隧道量测内容和方法论述错误的是（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":22},"该隧道开挖后应及时进行围岩、初期支护的周边位移量测、拱顶下沉量测",{"key":24,"text":519,"correct":22},"该隧道初期支护完成后应进行喷层表面的观察和记录，并进行裂缝描述",{"key":27,"text":521,"correct":22},"该隧道如果围岩差、断面大或地表沉降控制严格时，宜进行围岩体内位移量测",{"key":30,"text":523,"correct":32},"该隧道全线应进行地表沉降量测",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":20,"analysis":33},1110727,"关于采用工字钢钢拱架进行隧道支护的说法，错误的是（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":32},"混凝土能充满钢拱架和围岩间空隙，钢拱架与喷射混凝土粘结好",{"key":24,"text":531,"correct":22},"可用于混凝上内作为永久衬砌的一部分",{"key":27,"text":533,"correct":22},"架设后能立即承载",{"key":30,"text":535,"correct":22},"在V、Ⅵ级较软弱破碎围岩中或塌方时使用较多",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":27,"analysis":33},1110728,"对于围岩压力来得快、来得大，对围岩变形及地表下沉有严格限制要求的较弱破碎围岩隧道工程施工应采用（ ）预支护形式。",[540,542,544,546],{"key":20,"text":541,"correct":22},"超前锚杆.",{"key":24,"text":543,"correct":22},"超前小导管注浆",{"key":27,"text":545,"correct":32},"管棚.",{"key":30,"text":547,"correct":22},"插板",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":20,"analysis":33},1110729,"隧道围岩为Ⅰ~ Ⅲ级的中小跨度隧道，宜采用（ ）。",[552,554,556,558],{"key":20,"text":553,"correct":32},"全断面",{"key":24,"text":555,"correct":22},"留核心土法",{"key":27,"text":557,"correct":22},"中导洞法",{"key":30,"text":559,"correct":22},"双侧壁导坑法",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":30,"analysis":33},1110730,"隧道采用预裂爆破的分区起爆顺序为（）。",[564,566,568,570],{"key":20,"text":565,"correct":22},"掏槽眼→辅助眼→周边眼",{"key":24,"text":567,"correct":22},"掏槽眼→辅助眼→底板眼",{"key":27,"text":569,"correct":22},"周边眼→辅助眼→掏槽眼.",{"key":30,"text":571,"correct":32},"周边眼→掏槽眼→辅助眼",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":30,"analysis":33},1110731,"明洞工程施工说法错误的是（ ）",[576,578,580,582],{"key":20,"text":577,"correct":22},"基础混凝土灌注前必须排除坑内积水，边墙基础完成后应及时回填",{"key":24,"text":579,"correct":22},"偏压和单压明洞外边墙的基底，在垂直路线方向应按设计要求挖成一定坡度的斜坡，提高边墙抗滑力",{"key":27,"text":581,"correct":22},"当地基不满足设计要求时，应及时上报监理、设计单位，并按设计单位提供的处理方案施工",{"key":30,"text":583,"correct":32},"墙后有排水设施时，可以回填前施工",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":27,"analysis":33},1110732,"为防止隧道衬砌施工中裂缝的产生，衬砌厚度应根据下列（ ）确定。",[588,590,592,594],{"key":20,"text":589,"correct":22},"衬砌混凝土的强度要求",{"key":24,"text":591,"correct":22},"衬砌混凝土的坍落度要求",{"key":27,"text":593,"correct":32},"围岩类别、形状、结构",{"key":30,"text":595,"correct":22},"超挖和欠挖情况",[597,600,603,606,609,612],{"id":15,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":15},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]