[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-786-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":618},{"id":5,"name":6,"category":7,"favorite":8},786,"二建公路工程实务","建筑工程",0,1,50,1644,[13,33,45,57,69,81,93,105,117,129,141,153,165,177,189,201,213,225,237,249,261,273,285,297,309,321,333,345,357,369,381,393,405,417,429,441,453,465,477,489,501,513,525,537,549,561,573,585,597,606],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":29,"analysis":32},1110168,"单选题","高速公路、一级公路中线放样主要依据的设计表格是（）。",[18,22,25,28],{"key":19,"text":20,"correct":21},"A","路基设计表",false,{"key":23,"text":24,"correct":21},"B","水准点表",{"key":26,"text":27,"correct":21},"C","交点固定表",{"key":29,"text":30,"correct":31},"D","逐桩坐标表",true,"",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":29,"analysis":32},1110170,"塑料排水板的施工工艺流程中，“插入套管”的前一道工序是（）。",[37,39,41,43],{"key":19,"text":38,"correct":21},"拔出套管",{"key":23,"text":40,"correct":21},"隔断塑料排水板",{"key":26,"text":42,"correct":21},"机具就位",{"key":29,"text":44,"correct":31},"塑料排水板穿靴",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":19,"analysis":32},1110171,"一段较长的土质路堑纵向开挖，采用沿路堑全宽，以深度不大的纵向分层进行挖掘作业，这种作业方法称作（）。",[49,51,53,55],{"key":19,"text":50,"correct":31},"分层纵挖法",{"key":23,"text":52,"correct":21},"通道纵挖法",{"key":26,"text":54,"correct":21},"分段纵挖法",{"key":29,"text":56,"correct":21},"混合式纵挖法",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":29,"analysis":32},1110172,"某坚石路堑紧邻一座高压线铁塔，其最佳开挖方法是（）。",[61,63,65,67],{"key":19,"text":62,"correct":21},"薄层钻爆开挖",{"key":23,"text":64,"correct":21},"带松土器的重型推土机破碎开挖",{"key":26,"text":66,"correct":21},"分层钻爆开挖",{"key":29,"text":68,"correct":31},"静态破碎开挖",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":19,"analysis":32},1110174,"路堤填筑前，应通过取土试验确定填料最小强度和（）。",[73,75,77,79],{"key":19,"text":74,"correct":31},"最大粒径",{"key":23,"text":76,"correct":21},"平均粒径",{"key":26,"text":78,"correct":21},"CBR值",{"key":29,"text":80,"correct":21},"松方系数",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":29,"analysis":32},1110175,"关于冬期路堑开挖的说法错误的是（）。",[85,87,89,91],{"key":19,"text":86,"correct":21},"当冻土层破开挖到未冻土后，应连续作业",{"key":23,"text":88,"correct":21},"每日开工时选挖向阳处，气温回升后再挖背阴处",{"key":26,"text":90,"correct":21},"路堑挖至路床面以上1m时应停止开挖",{"key":29,"text":92,"correct":31},"挖方边坡应一次挖到设计边坡线位置",{"id":94,"libraryId":5,"type":9,"typeLabel":15,"stem":95,"options":96,"answer":23,"analysis":32},1110176,"软土地基处理中抛石挤淤施工规定说法错误的是（）。",[97,99,101,103],{"key":19,"text":98,"correct":21},"当下卧地层平坦时，应沿道路中线向前呈三角形抛填，再渐次向两旁展开",{"key":23,"text":100,"correct":31},"当下卧地层具有明显横向坡度时，应从下卧层低的一侧向高的一侧扩展，并在低侧边部多抛投不少于2m宽",{"key":26,"text":102,"correct":21},"在抛石高出水面后，应采用重型机具碾压紧密，然后在其上设反滤层，再填土压实",{"key":29,"text":104,"correct":21},"抛石挤淤法一般适用于处理深度不宜大于3m",{"id":106,"libraryId":5,"type":9,"typeLabel":15,"stem":107,"options":108,"answer":26,"analysis":32},1110177,"在用袋装砂井法进行软土处理施工工艺程序中，正确的程序是（）。",[109,111,113,115],{"key":19,"text":110,"correct":21},"整平原地面→机具定位→摊铺下层砂垫层→打入套管→沉入砂袋→拔出套管→机具移位→埋砂袋头→摊铺上层砂垫层",{"key":23,"text":112,"correct":21},"整平原地面→摊铺下层砂垫层→机具定位→沉入砂袋→打入套管→拔出套管→机具移位→埋砂袋头→摊铺上层砂垫层",{"key":26,"text":114,"correct":31},"整平原地面→摊铺下层砂垫层→机具定位→打入套管→沉入砂袋→拔出套管→机具移位→埋砂袋头→摊铺上层砂垫层",{"key":29,"text":116,"correct":21},"整平原地面→摊铺下层砂垫层→机具定位→打入套管→沉入砂袋→拔出套管→机具移位→摊铺上层砂垫层→埋砂袋头",{"id":118,"libraryId":5,"type":9,"typeLabel":15,"stem":119,"options":120,"answer":19,"analysis":32},1110178,"既可用于排除地下水，又可排除地面水的排水设施是（）。",[121,123,125,127],{"key":19,"text":122,"correct":31},"排水沟",{"key":23,"text":124,"correct":21},"暗沟",{"key":26,"text":126,"correct":21},"渗沟",{"key":29,"text":128,"correct":21},"蒸发池",{"id":130,"libraryId":5,"type":9,"typeLabel":15,"stem":131,"options":132,"answer":19,"analysis":32},1110179,"下列关于锚杆挡土墙施工正确的做法（）。",[133,135,137,139],{"key":19,"text":134,"correct":31},"在施工前应作锚杆抗拔力验证试验",{"key":23,"text":136,"correct":21},"宜先灌浆后插入锚杆",{"key":26,"text":138,"correct":21},"灌浆应采用孔口注浆法，灌浆管应插至距孔口50～100mm",{"key":29,"text":140,"correct":21},"砂浆锚杆安装后，必须待砂浆达到设计强度的70％后方可安装肋柱、墙板",{"id":142,"libraryId":5,"type":9,"typeLabel":15,"stem":143,"options":144,"answer":23,"analysis":32},1110180,"对路基产生“弹簧”且急于赶工的路段，可以采取（）的措施。",[145,147,149,151],{"key":19,"text":146,"correct":21},"增大压实机具功率",{"key":23,"text":148,"correct":31},"掺生石灰粉翻拌",{"key":26,"text":150,"correct":21},"适量洒水",{"key":29,"text":152,"correct":21},"掺碎石翻拌",{"id":154,"libraryId":5,"type":9,"typeLabel":15,"stem":155,"options":156,"answer":23,"analysis":32},1110182,"某软岩路堑路段缺乏合格石料，该路堑最适合修建的挡土墙是（ ）。",[157,159,161,163],{"key":19,"text":158,"correct":21},"加筋挡土墙",{"key":23,"text":160,"correct":31},"锚杆挡土墙",{"key":26,"text":162,"correct":21},"浆砌块石衡重式挡土墙",{"key":29,"text":164,"correct":21},"护臂式挡土墙",{"id":166,"libraryId":5,"type":9,"typeLabel":15,"stem":167,"options":168,"answer":26,"analysis":32},1110183,"加筋土挡土墙一般用于（ ）。",[169,171,173,175],{"key":19,"text":170,"correct":21},"缺乏石料的地区",{"key":23,"text":172,"correct":21},"挖方路段的山坡",{"key":26,"text":174,"correct":31},"地形较为平坦且宽敞的填方路段上",{"key":29,"text":176,"correct":21},"地形陡峭的山坡",{"id":178,"libraryId":5,"type":9,"typeLabel":15,"stem":179,"options":180,"answer":26,"analysis":32},1110184,"柱板式锚杆挡土墙墙后的土压力传递顺序，正确的是（ ）。",[181,183,185,187],{"key":19,"text":182,"correct":21},"墙后的土压力→锚杆→挡土板",{"key":23,"text":184,"correct":21},"墙后的土压力→挡土板→锚杆",{"key":26,"text":186,"correct":31},"墙后的土压力→挡土板→肋柱→锚杆",{"key":29,"text":188,"correct":21},"墙后的土压力→肋柱→挡土板→锚杆",{"id":190,"libraryId":5,"type":9,"typeLabel":15,"stem":191,"options":192,"answer":19,"analysis":32},1110185,"边坡处理的作用是（ ）。",[193,195,197,199],{"key":19,"text":194,"correct":31},"加固边坡",{"key":23,"text":196,"correct":21},"减少工程量",{"key":26,"text":198,"correct":21},"缩短工期",{"key":29,"text":200,"correct":21},"放缓边坡",{"id":202,"libraryId":5,"type":9,"typeLabel":15,"stem":203,"options":204,"answer":26,"analysis":32},1110186,"关于强夯置换的说法，错误的是（ ）。",[205,207,209,211],{"key":19,"text":206,"correct":21},"应在地表铺设一定厚度的垫层，垫层材料宜与桩体材料相同",{"key":23,"text":208,"correct":21},"夯点的夯击次数应通过试夯确定",{"key":26,"text":210,"correct":31},"应按由外向内，隔行跳打的方式进行施工",{"key":29,"text":212,"correct":21},"应在地表铺设一定厚度的垫层，垫层材料可采用碎石等坚硬颗粒材料",{"id":214,"libraryId":5,"type":9,"typeLabel":15,"stem":215,"options":216,"answer":29,"analysis":32},1110187,"关于路基填料选择的错误说法是（ ）。",[217,219,221,223],{"key":19,"text":218,"correct":21},"含水量不适宜直接压实的细粒土经处理后且检验合格可作为路基填料",{"key":23,"text":220,"correct":21},"路床填料粒径应小于100mm",{"key":26,"text":222,"correct":21},"崩解性岩石和盐化岩石不得直接用于路堤填筑",{"key":29,"text":224,"correct":31},"工业废渣可以直接用于路堤填筑",{"id":226,"libraryId":5,"type":9,"typeLabel":15,"stem":227,"options":228,"answer":29,"analysis":32},1110188,"石质路堑施工的开挖方式中，（ ）是将膨胀剂放入炮孔内，利用产生的膨胀力缓慢地作用于孔壁，经过数小时至24h达到300～500MPa的压力，使介质裂开。",[229,231,233,235],{"key":19,"text":230,"correct":21},"直接应用机械开挖",{"key":23,"text":232,"correct":21},"混合式开挖",{"key":26,"text":234,"correct":21},"钻爆开挖",{"key":29,"text":236,"correct":31},"静态破碎法",{"id":238,"libraryId":5,"type":9,"typeLabel":15,"stem":239,"options":240,"answer":23,"analysis":32},1110189,"关于路基爆破施工中光面爆破与预裂爆破的说法，正确的是（ ）。",[241,243,245,247],{"key":19,"text":242,"correct":21},"两者均应有侧向临空面",{"key":23,"text":244,"correct":31},"两者均宜采用低猛度、低爆速、传爆性能好的炸药",{"key":26,"text":246,"correct":21},"两者均有最小抵抗线",{"key":29,"text":248,"correct":21},"两者均属于定向爆破",{"id":250,"libraryId":5,"type":9,"typeLabel":15,"stem":251,"options":252,"answer":29,"analysis":32},1110190,"对于原地基处理，下面说法不正确的是（ ）。",[253,255,257,259],{"key":19,"text":254,"correct":21},"二级及二级以上公路路堤基底的压实度应不小于90%",{"key":23,"text":256,"correct":21},"稻田、湖塘等地段，可采取排水、换填、加筋等措施进行处理",{"key":26,"text":258,"correct":21},"非岩石地基上填筑填石路堤前，应按要求设过渡层",{"key":29,"text":260,"correct":31},"地面横坡缓于1：5时，原地面应挖台阶，台阶宽度不应小于2m",{"id":262,"libraryId":5,"type":9,"typeLabel":15,"stem":263,"options":264,"answer":26,"analysis":32},1110191,"关于场地清理的说法，错误的是（ ）。",[265,267,269,271],{"key":19,"text":266,"correct":21},"取土坑范围内的树根应全部挖除",{"key":23,"text":268,"correct":21},"填方高度大于1m的高速公路路堤，基底树根应全部挖除",{"key":26,"text":270,"correct":31},"清出的表层土不能作路基使用",{"key":29,"text":272,"correct":21},"填方高度大于1m的二级以下公路路堤，可保留树根",{"id":274,"libraryId":5,"type":9,"typeLabel":15,"stem":275,"options":276,"answer":29,"analysis":32},1110192,"下列可不用进行试验路段施工的情况是（ ）。",[277,279,281,283],{"key":19,"text":278,"correct":21},"二级公路路堤",{"key":23,"text":280,"correct":21},"填石路堤",{"key":26,"text":282,"correct":21},"特殊填料的路堤",{"key":29,"text":284,"correct":31},"三级公路路堤",{"id":286,"libraryId":5,"type":9,"typeLabel":15,"stem":287,"options":288,"answer":23,"analysis":32},1110193,"下列不是路基横向开裂的原因是（ ）。",[289,291,293,295],{"key":19,"text":290,"correct":21},"使用了不合格的土做填料",{"key":23,"text":292,"correct":31},"半填半挖路段未按要求设台阶",{"key":26,"text":294,"correct":21},"同一天填筑层路基填料混杂",{"key":29,"text":296,"correct":21},"压实度不符合要求",{"id":298,"libraryId":5,"type":9,"typeLabel":15,"stem":299,"options":300,"answer":23,"analysis":32},1110194,"墙背所受土压力较小的重力式挡土墙墙背形式是（ ）。",[301,303,305,307],{"key":19,"text":302,"correct":21},"俯斜式",{"key":23,"text":304,"correct":31},"仰斜式",{"key":26,"text":306,"correct":21},"垂直式",{"key":29,"text":308,"correct":21},"凸折式",{"id":310,"libraryId":5,"type":9,"typeLabel":15,"stem":311,"options":312,"answer":19,"analysis":32},1110195,"某路基加宽后，路基加宽和边沟回填的地方出现了沉陷，最有可能的原因是（ ）。",[313,315,317,319],{"key":19,"text":314,"correct":31},"压实度不足",{"key":23,"text":316,"correct":21},"压实度提高",{"key":26,"text":318,"correct":21},"松铺厚度不够",{"key":29,"text":320,"correct":21},"选用砂土填筑",{"id":322,"libraryId":5,"type":9,"typeLabel":15,"stem":323,"options":324,"answer":26,"analysis":32},1110196,"一般情况下，同一路段应先施工的路基地面排水设施是（ ）。",[325,327,329,331],{"key":19,"text":326,"correct":21},"边沟",{"key":23,"text":328,"correct":21},"集流槽",{"key":26,"text":330,"correct":31},"截水沟",{"key":29,"text":332,"correct":21},"拦水带",{"id":334,"libraryId":5,"type":9,"typeLabel":15,"stem":335,"options":336,"answer":29,"analysis":32},1110197,"下面路基施工项目中可以在冬期进行施工的是（ ）。",[337,339,341,343],{"key":19,"text":338,"correct":21},"整修路基边坡",{"key":23,"text":340,"correct":21},"路床以下1m范围内可以施工",{"key":26,"text":342,"correct":21},"半填半挖地段，填挖方交界处",{"key":29,"text":344,"correct":31},"含水量高的流动土质、流沙地段的路堑开挖",{"id":346,"libraryId":5,"type":9,"typeLabel":15,"stem":347,"options":348,"answer":29,"analysis":32},1110198,"下面关于土石路堤施工技术说法错误的是（ ）。",[349,351,353,355],{"key":19,"text":350,"correct":21},"性质不同的填料，应水平分层、分段填筑，分层压实",{"key":23,"text":352,"correct":21},"土石路堤不得倾填",{"key":26,"text":354,"correct":21},"施工前应由试验确定松铺厚度、机械、压实速度及遍数、沉降差等参数",{"key":29,"text":356,"correct":31},"透水性差异大的材料，分层或分段填筑，宜纵向分幅填筑",{"id":358,"libraryId":5,"type":9,"typeLabel":15,"stem":359,"options":360,"answer":23,"analysis":32},1110199,"某四级公路路面面层采用水泥混凝土，路基填料为黏性土，路基压实度应采用（ ）公路的规定值。",[361,363,365,367],{"key":19,"text":362,"correct":21},"一级",{"key":23,"text":364,"correct":31},"二级",{"key":26,"text":366,"correct":21},"三级",{"key":29,"text":368,"correct":21},"四级",{"id":370,"libraryId":5,"type":9,"typeLabel":15,"stem":371,"options":372,"answer":26,"analysis":32},1110200,"用于公路路基的填料要求强度高，其强度通常指土体的（ ）。",[373,375,377,379],{"key":19,"text":374,"correct":21},"压实度",{"key":23,"text":376,"correct":21},"天然密度",{"key":26,"text":378,"correct":31},"抗剪强度",{"key":29,"text":380,"correct":21},"抗压强度",{"id":382,"libraryId":5,"type":9,"typeLabel":15,"stem":383,"options":384,"answer":26,"analysis":32},1110201,"不能保证路基边缘压实度的措施是（ ）。",[385,387,389,391],{"key":19,"text":386,"correct":21},"控制碾压工艺，保证机具碾压到边",{"key":23,"text":388,"correct":21},"控制碾压顺序，确保轮迹重叠宽度",{"key":26,"text":390,"correct":31},"严格按照路基设计宽度填筑",{"key":29,"text":392,"correct":21},"确保边缘带碾压频率高于行车带",{"id":394,"libraryId":5,"type":9,"typeLabel":15,"stem":395,"options":396,"answer":26,"analysis":32},1110202,"一级公路路基施工中线测量放样宜采用（ ）。",[397,399,401,403],{"key":19,"text":398,"correct":21},"切线支距法",{"key":23,"text":400,"correct":21},"偏角法",{"key":26,"text":402,"correct":31},"坐标法",{"key":29,"text":404,"correct":21},"视距交会法",{"id":406,"libraryId":5,"type":9,"typeLabel":15,"stem":407,"options":408,"answer":26,"analysis":32},1110203,"属于动态无损检测，并能反映路基承载能力的方法是（ ）。",[409,411,413,415],{"key":19,"text":410,"correct":21},"灌砂法",{"key":23,"text":412,"correct":21},"贝克曼梁法",{"key":26,"text":414,"correct":31},"落锤弯沉仪法",{"key":29,"text":416,"correct":21},"自动弯沉仪法",{"id":418,"libraryId":5,"type":9,"typeLabel":15,"stem":419,"options":420,"answer":29,"analysis":32},1110204,"在公路工程中用于以借为填或移挖作填地段，特别是在深挖高填相间、工程量大的鸡爪形地区，为减少挖、装、运、夯等工序，提高生产效率，宜采用（）。",[421,423,425,427],{"key":19,"text":422,"correct":21},"光面爆破",{"key":23,"text":424,"correct":21},"微差爆破",{"key":26,"text":426,"correct":21},"预裂爆破",{"key":29,"text":428,"correct":31},"定向爆破",{"id":430,"libraryId":5,"type":9,"typeLabel":15,"stem":431,"options":432,"answer":23,"analysis":32},1110205,"填隙碎石施工中，采用振动压路机对粒料基层进行复压时，其碾压速度应（）。",[433,435,437,439],{"key":19,"text":434,"correct":21},"先慢后快",{"key":23,"text":436,"correct":31},"慢速",{"key":26,"text":438,"correct":21},"快速",{"key":29,"text":440,"correct":21},"先快后慢",{"id":442,"libraryId":5,"type":9,"typeLabel":15,"stem":443,"options":444,"answer":19,"analysis":32},1110206,"在路拌法水泥稳定土基层施工中，主要工艺流程有：①准备下承层；②洒水闷料；③拌合；④整形；⑤碾压；⑥养生。如下选项中排序正确的是（）。",[445,447,449,451],{"key":19,"text":446,"correct":31},"①②③④⑤⑥",{"key":23,"text":448,"correct":21},"②①③④⑤⑥",{"key":26,"text":450,"correct":21},"①②④③⑤⑥",{"key":29,"text":452,"correct":21},"①③②④⑤⑥",{"id":454,"libraryId":5,"type":9,"typeLabel":15,"stem":455,"options":456,"answer":29,"analysis":32},1110207,"关于级配碎石基层施工的说法，不正确的是（）。",[457,459,461,463],{"key":19,"text":458,"correct":21},"用作级配碎石的粗集料应采用具有一定级配的硬质石料，且不应含有黏土块、有机物等",{"key":23,"text":460,"correct":21},"采用不同粒级的碎石和石屑时，宜将大粒径碎石铺在下层，中粒径碎石铺在中层，小粒径碎石铺在上层",{"key":26,"text":462,"correct":21},"检查材料层的松铺厚度，必要时，应进行减料或补料工作",{"key":29,"text":464,"correct":31},"级配碎石基层碾压完成后即可开放交通",{"id":466,"libraryId":5,"type":9,"typeLabel":15,"stem":467,"options":468,"answer":19,"analysis":32},1110208,"关于无机结合料稳定材料层之间的处理，说法正确的是（）。",[469,471,473,475],{"key":19,"text":470,"correct":31},"下承层清理后，应封闭交通",{"key":23,"text":472,"correct":21},"采用连续摊铺方式施工的结构层，可用一套设备在上下层之间来回施工",{"key":26,"text":474,"correct":21},"稳定细粒材料结构层，最后一道碾压工艺不可用凸块式压路机",{"key":29,"text":476,"correct":21},"在上层施工前一天，撒布水泥或水泥净浆",{"id":478,"libraryId":5,"type":9,"typeLabel":15,"stem":479,"options":480,"answer":23,"analysis":32},1110209,"沥青路面按照组成结构分类，骨架-空隙结构的典型代表包括沥青碎石混合料和（）",[481,483,485,487],{"key":19,"text":482,"correct":21},"AC-I型沥青混凝土",{"key":23,"text":484,"correct":31},"排水沥青混合料(OGFC)",{"key":26,"text":486,"correct":21},"沥青碎石玛碲脂混合料(SMA)",{"key":29,"text":488,"correct":21},"碎石沥青混凝土（SAC）",{"id":490,"libraryId":5,"type":9,"typeLabel":15,"stem":491,"options":492,"answer":19,"analysis":32},1110210,"现场冷再生中关键技术是（）。",[493,495,497,499],{"key":19,"text":494,"correct":31},"添加的胶粘剂（如乳化沥青、泡沫沥青、水泥）与旧混合料的均匀拌和技术",{"key":23,"text":496,"correct":21},"旧沥青混合料的加热重熔技术",{"key":26,"text":498,"correct":21},"新加沥青、再生剂与旧混合料的均匀复拌技术",{"key":29,"text":500,"correct":21},"解决旧沥青混合料中沥青的加热重熔问题与旧沥青混合料的精确计量问题",{"id":502,"libraryId":5,"type":9,"typeLabel":15,"stem":503,"options":504,"answer":19,"analysis":32},1110211,"关于滑膜摊铺机摊铺水泥混凝土面层施工的说法，错误的是（）。",[505,507,509,511],{"key":19,"text":506,"correct":31},"振捣棒下缘位置应位于挤压板最低点以下",{"key":23,"text":508,"correct":21},"摊铺过程中，间断时间应不大于混凝土的初凝时间",{"key":26,"text":510,"correct":21},"滑模摊铺机起步时，应先开启振捣棒",{"key":29,"text":512,"correct":21},"根据拌合物稠度大小，调整摊铺的振捣频率或速度等措施，保证摊铺的质量",{"id":514,"libraryId":5,"type":9,"typeLabel":15,"stem":515,"options":516,"answer":26,"analysis":32},1110212,"属于预防水泥混凝土路面断板的措施是（）。",[517,519,521,523],{"key":19,"text":518,"correct":21},"尽量采用平接缝",{"key":23,"text":520,"correct":21},"采用两台或两台以上摊铺机梯队作业",{"key":26,"text":522,"correct":31},"做好压缝并及时切缝",{"key":29,"text":524,"correct":21},"在摊铺机前设专人清除掉在“滑靴”前的混合料",{"id":526,"libraryId":5,"type":9,"typeLabel":15,"stem":527,"options":528,"answer":23,"analysis":32},1110213,"可用于各级公路基层和底基层的粒料材料是（）。",[529,531,533,535],{"key":19,"text":530,"correct":21},"砂砾",{"key":23,"text":532,"correct":31},"级配碎石",{"key":26,"text":534,"correct":21},"泥结碎石",{"key":29,"text":536,"correct":21},"填隙碎石",{"id":538,"libraryId":5,"type":9,"typeLabel":15,"stem":539,"options":540,"answer":26,"analysis":32},1110214,"关于填隙碎石施工的说法，错误的是（）。",[541,543,545,547],{"key":19,"text":542,"correct":21},"单层填隙碎石的压实厚度宜为公称最大粒径的1.5～2.0倍",{"key":23,"text":544,"correct":21},"填隙料应干燥",{"key":26,"text":546,"correct":31},"填隙碎石施工，应采用胶轮压路机",{"key":29,"text":548,"correct":21},"填隙碎石碾压后，表面集料间的空隙应填满，但表面应看得见集料",{"id":550,"libraryId":5,"type":9,"typeLabel":15,"stem":551,"options":552,"answer":23,"analysis":32},1110215,"关于石灰稳定土基层施工备料的说法是，正确的是（）。",[553,555,557,559],{"key":19,"text":554,"correct":21},"当生石灰堆放时间较长时，应露天堆放，不得覆盖",{"key":23,"text":556,"correct":31},"消石灰应保持一定的湿度，但不可过湿成团",{"key":26,"text":558,"correct":21},"生石灰应在加水消解后马上使用，不得隔夜使用",{"key":29,"text":560,"correct":21},"消石灰无需过筛即可使用",{"id":562,"libraryId":5,"type":9,"typeLabel":15,"stem":563,"options":564,"answer":19,"analysis":32},1110216,"水泥稳定土基层分层施工时，铺筑第二层前，应对第一层顶面采取的处理措施是（）。",[565,567,569,571],{"key":19,"text":566,"correct":31},"洒少量水泥",{"key":23,"text":568,"correct":21},"洒少量石灰",{"key":26,"text":570,"correct":21},"洒水翻松",{"key":29,"text":572,"correct":21},"喷洒浇洒乳化沥青",{"id":574,"libraryId":5,"type":9,"typeLabel":15,"stem":575,"options":576,"answer":23,"analysis":32},1110217,"下列应洒布粘层的是（）。",[577,579,581,583],{"key":19,"text":578,"correct":21},"半刚性基层上铺筑沥青层",{"key":23,"text":580,"correct":31},"沥青混凝土面层与检查井侧面之间",{"key":26,"text":582,"correct":21},"沥青混凝土面层的下面层和二灰稳定碎石基层之间",{"key":29,"text":584,"correct":21},"多雨地区空隙较大的沥青面层下部",{"id":586,"libraryId":5,"type":9,"typeLabel":15,"stem":587,"options":588,"answer":29,"analysis":32},1110218,"关于沥青混合料摊铺的说法错误的是（）。",[589,591,593,595],{"key":19,"text":590,"correct":21},"摊铺过程中不准随意变换速度，尽量避免中途停顿",{"key":23,"text":592,"correct":21},"沥青混凝土的摊铺温度一般不低于125～140℃",{"key":26,"text":594,"correct":21},"下、中面层宜采用走线法施工，表面层采用平衡梁法施工",{"key":29,"text":596,"correct":31},"摊铺过程可以根据供料情况变换速度或者中途停顿施工",{"id":598,"libraryId":5,"type":9,"typeLabel":15,"stem":599,"options":600,"answer":29,"analysis":32},1110219,"沥青贯入式面层的施工工艺流程中包括：①撒透层或粘层沥青；②清扫基层；③撒布第一遍沥青；④撒主层矿料→碾压⑤撒布第一遍嵌缝料；⑥碾压及初期养护。其中正确的顺序是（）。",[601,602,603,604],{"key":19,"text":446,"correct":21},{"key":23,"text":448,"correct":21},{"key":26,"text":450,"correct":21},{"key":29,"text":605,"correct":31},"②①④③⑤⑥",{"id":607,"libraryId":5,"type":9,"typeLabel":15,"stem":608,"options":609,"answer":23,"analysis":32},1110220,"关于沥青路面试验检测的说法错误的是（）。",[610,612,614,616],{"key":19,"text":611,"correct":21},"沥青混凝土配合比设计采用马歇尔稳定度法",{"key":23,"text":613,"correct":31},"马歇尔稳定度试验不能用于沥青路面施工质量检验",{"key":26,"text":615,"correct":21},"空隙率是评价沥青混合料压实程度的指标",{"key":29,"text":617,"correct":21},"流值是评价沥青混合料抗塑性变形能力的指标",[619,622,625,628,631,634],{"id":9,"name":620,"category":7,"favorite":621},"领导干部任职前廉政法规知识测试题",92,{"id":623,"name":624,"category":7,"favorite":9},595,"建筑结构与设备",{"id":626,"name":627,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":629,"name":630,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":632,"name":633,"category":7,"favorite":8},534,"BIM工程师",{"id":635,"name":633,"category":7,"favorite":8},535]