[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111818":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1111818,786,2,"多选题","根据《公路工程基本建设项目概算预算编制办法》，以各类工程的直接工程费之和作为基数计算费用的有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","雨期施工增加费",true,{"key":16,"text":17,"correct":18},"B","夜间施工增加费",false,{"key":20,"text":21,"correct":18},"C","高原地区施工增加费",{"key":23,"text":24,"correct":14},"D","施工辅助费",{"key":26,"text":27,"correct":18},"E","企业管理费","AD","根据《公路工程基本建设项目概算预算编制办法》，以各类工程的直接工程费之和作为基数计算的费用包括：冬期施工增加费、雨期施工增加费、沿海地区工程施工费、安全及文明施工措施费、临时设施费、施工辅助费、工地转移费等。BCE三项均不是以各类工程的直接工程费之和作为基数计算的费用。夜间施工增加费=∑夜间施工工程项目的直接工程费×夜间施工增加费费率(%)；高原地区施工增加费=∑（各类工程人工费十施工机械使用费）×高原地区施工增加费费率(%)；企业管理费由基本费用、主副食运输补贴、职工探亲路费、职工取暖补贴和财务费用五项组成。选项“BCE”错误。按照编制办法的要求规定，故本题正确选项应为“AD”。",{"id":6,"name":31,"category":32,"favorite":33},"二建公路工程实务","建筑工程",0]