[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111703":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1111703,786,2,"多选题","下列叙述行为属于工程转包的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","承包人将承包的全部工程发包给他人的",true,{"key":16,"text":17,"correct":18},"B","承包人将工程分包给不具备相应资格的企业或者个人的",false,{"key":20,"text":21,"correct":18},"C","分包人以他人名义承揽分包工程的",{"key":23,"text":24,"correct":18},"D","承包人将合同文件中明确不得分包的专项工程进行分包的",{"key":26,"text":27,"correct":14},"E","承包人将承包的全部工程肢解后以分包的名义分别发包给他人的","AE","2020版教材P330 承包人未在施工现场设立项目管理机构和派驻相应人员对分包工程的施工活动实施有效管理，并且有下列情形之一，属于转包： 1.承包人将承包的全部工程分包给他人的；2.承包人将承包的全部工程肢解后以分包的名义分别分包给他人的；3.法律、法规规定的其他转包行为。",{"id":6,"name":31,"category":32,"favorite":33},"二建公路工程实务","建筑工程",0]