[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111670":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1111670,786,2,"多选题","工程概况有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","施工条件",true,{"key":16,"text":17,"correct":14},"B","合同特殊要求",{"key":19,"text":20,"correct":14},"C","工程施工的特点",{"key":22,"text":23,"correct":24},"D","施工方案",false,{"key":26,"text":27,"correct":14},"E","工程施工的难点分析","ABCE","2020版教材P194 工程概况。主要包括以下内容： （1）工程项目的主要情况,2）施工条件,3）工程施工的特点和难点分析。4）合同特殊要求。",{"id":6,"name":31,"category":32,"favorite":33},"二建公路工程实务","建筑工程",0]