[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111653":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1111653,786,2,"多选题","公路工程项目施工成本管理的内容有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","成本预测",true,{"key":16,"text":17,"correct":14},"B","成本计划编制",{"key":19,"text":20,"correct":14},"C","成本控制",{"key":22,"text":23,"correct":14},"D","成本核算",{"key":25,"text":26,"correct":27},"E","成本总结",false,"ABCD","2020版教材P268 1. 施工成本预测2. 施工成本计划编制3. 施工成本控制4.施工成本核算5. 施工成本分析6. 施工成本考核",{"id":6,"name":31,"category":32,"favorite":33},"二建公路工程实务","建筑工程",0]