[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111587":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1111587,786,2,"多选题","隧道超欠挖测定方法有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","利用激光束测定",true,{"key":16,"text":17,"correct":14},"B","用全站仪测定",{"key":19,"text":20,"correct":21},"C","用钢卷尺确定",false,{"key":23,"text":24,"correct":14},"D","用激光隧道界限测量仪测定",{"key":26,"text":27,"correct":14},"E","用二次衬砌轮廓钢架作基准测定","ABDE","2020版教材P168 表格隧道超欠挖的测定方法： 利用激光束测定 用全站仪测定 用激光隧道界限测量仪测定 用二次衬砌轮廓钢架作基准测定",{"id":6,"name":31,"category":32,"favorite":33},"二建公路工程实务","建筑工程",0]