[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111578":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1111578,786,2,"多选题","复合式衬砌隧道的选测项目有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","围岩体内位移",true,{"key":16,"text":17,"correct":14},"B","围岩压力",{"key":19,"text":20,"correct":21},"C","周边位移.",false,{"key":23,"text":24,"correct":14},"D","支护衬砌内应力",{"key":26,"text":27,"correct":14},"E","锚杆轴力","ABDE","2020版教材P163 隧道现场监控测量的必测项目：洞内外观察、周边位移、拱顶下沉、地表下沉。C是必测项目。",{"id":6,"name":31,"category":32,"favorite":33},"二建公路工程实务","建筑工程",0]