[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111416":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1111416,786,2,"多选题","冬期施工开挖路堑表层冻土可采用的方法有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","爆破法",true,{"key":16,"text":17,"correct":14},"B","冻土锯",{"key":19,"text":20,"correct":14},"C","日光暴晒",{"key":22,"text":23,"correct":14},"D","热水开冻",{"key":25,"text":26,"correct":27},"E","深孔破冻法",false,"ABCD","2021\u002F2020版教材P12 冬季开挖表层的方法是爆破冻土，机械破冻，人工破冻面积不大时（日光暴晒，火烧，热水开冻，水针开冻，蒸汽放热解冻法和电热法或融化冰冻层法铺以人工撬挖。",{"id":6,"name":31,"category":32,"favorite":33},"二建公路工程实务","建筑工程",0]