[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111382":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1111382,786,2,"多选题","真空预压处理软基施工中，可停止抽气的条件有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","连续5个昼夜实测沉降速率小于或等于0.5mm\u002Fd",true,{"key":16,"text":17,"correct":14},"B","满足工程对沉降、承载力的要求",{"key":19,"text":20,"correct":14},"C","地基固结度达到设计要求的80%以上",{"key":22,"text":23,"correct":24},"D","连续24h实测沉降速率为0mm\u002Fd",false,{"key":26,"text":27,"correct":24},"E","真空泵空抽时达到95kPa以上的真空吸力","ABC","2021\u002F2020版教材P21 真空预压施工应按排水系统施工、抽真空系统施工、密封系统施工及抽气的步骤进行。当满足下列条件之一时，可停止抽气： （1） 连续5昼夜实测沉降速率小于或等于0.5mm\u002Fd。 （2） 满足工程对沉降、承载力的要求。 （3） 地基固结度达到设计要求的80%以上。",{"id":6,"name":31,"category":32,"favorite":33},"二建公路工程实务","建筑工程",0]