[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111351":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1111351,786,2,"多选题","关于纵向分层填筑法说法正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","逐层向坡向填筑",true,{"key":16,"text":17,"correct":18},"B","逐层向上填筑",false,{"key":20,"text":21,"correct":18},"C","填筑时按照横断面全宽分成水平层次",{"key":23,"text":24,"correct":18},"D","是路基填筑的常用方法",{"key":26,"text":27,"correct":14},"E","宜用于用推土机从路堑取土填筑距离较短的路堤。","AE","2021\u002F2020版教材P8 纵向分层填筑法：依路线纵坡方向分层，逐层向坡向填筑。宜用于用推土机从路堑取土填筑距离较短的路堤。",{"id":6,"name":31,"category":32,"favorite":33},"二建公路工程实务","建筑工程",0]