[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111305":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1111305,786,2,"多选题","工程量清单中有标价的单价或总额包括了工、料、机、管理、利润、缺陷修复、税金等费用，以及合同中明示或暗示的所有（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","责任",true,{"key":16,"text":17,"correct":18},"B","权利",false,{"key":20,"text":21,"correct":14},"C","义务",{"key":23,"text":24,"correct":14},"D","保险",{"key":26,"text":27,"correct":14},"E","一般风险","ACDE","本题考查的是公路工程工程量清单计价的应用。工程量清单中有标价的单价或总额价均已包括了为实施和完成合同工程所需的劳务、材料、机械、质检、安装、缺陷修复、管理、保险、税费、利润等费用，以及合同明示或暗示的所有责任、义务和一般风险。",{"id":6,"name":31,"category":32,"favorite":33},"二建公路工程实务","建筑工程",0]