[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111285":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1111285,786,2,"多选题","施工方案中资源利用优化主要包括（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","施工方法",false,{"key":16,"text":17,"correct":18},"B","物资采购与供应计划",true,{"key":20,"text":21,"correct":14},"C","劳动组织",{"key":23,"text":24,"correct":18},"D","机械需要计划",{"key":26,"text":27,"correct":14},"E","施工顺序","BD","资源利用的优化主要包括：物资采购与供应计划的优化、机械需要计划的优化。",{"id":6,"name":31,"category":32,"favorite":33},"二建公路工程实务","建筑工程",0]