[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111268":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1111268,786,2,"多选题","下列后张法预制梁的施工步骤中错误的有（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","梁板的振捣以插入式为主，附着式为辅",true,{"key":16,"text":17,"correct":18},"B","张拉机具应配套使用，配套定期标定",false,{"key":20,"text":21,"correct":14},"C","预应力张拉以应力控制为主，理论伸长量作为校核",{"key":23,"text":24,"correct":14},"D","预应力张拉，孔道冲洗后，立即压浆",{"key":26,"text":27,"correct":14},"E","采用单端压浆，直到另一端流出水泥浆即可","ACDE","本题考查的是桥梁上部结构装配式施工。梁板的振捣以附着式为主，以插入式为辅；预应力张拉以应力控制为主，实际伸长量作为校核；预应力筋张拉后，将孔道冲洗干净，吹除积水，尽早压注水泥浆。压浆应达到孔道另一端饱满和出浆，并应达到排气孔排出与规定稠度相同的水泥浆为止。",{"id":6,"name":31,"category":32,"favorite":33},"二建公路工程实务","建筑工程",0]