[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111261":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1111261,786,2,"多选题","明挖扩大基础施工，其基础的定位放样工作是根据（），推算出基础边线的定位点。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","基坑中心线",false,{"key":16,"text":17,"correct":18},"B","桥梁中心线",true,{"key":20,"text":21,"correct":14},"C","基坑高程",{"key":23,"text":24,"correct":14},"D","桥梁的高度",{"key":26,"text":27,"correct":18},"E","墩台的纵横轴线","BE","本题考查的是明挖扩大基础施工。明挖扩大基础施工的准备工作：放样工作系根据桥梁中心线与墩台纵横轴线，推算出基础边线定位点。",{"id":6,"name":31,"category":32,"favorite":33},"二建公路工程实务","建筑工程",0]