[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111244":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1111244,786,2,"多选题","锚锭施工进行温度控制，防止混凝土开裂的措施有（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","采用高水化热品种的水泥",false,{"key":16,"text":17,"correct":18},"B","降低水泥用量、减少水化热，掺入质量符合要求的粉煤灰和缓凝型外掺剂",true,{"key":20,"text":21,"correct":18},"C","降低混凝土入仓温度",{"key":23,"text":24,"correct":18},"D","在混凝土结构中布置冷却水管",{"key":26,"text":27,"correct":18},"E","采用分层施工","BCDE","选项A错误，应采用低水化热和凝结时间长的水泥品种。",{"id":6,"name":31,"category":32,"favorite":33},"二建公路工程实务","建筑工程",0]