[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111175":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1111175,786,1,"单选题","（2018年）根据《公路工程设计变更管理办法》，发生较大设计变更时，负责审批的单位是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","交通运输部",false,{"key":16,"text":17,"correct":14},"B","项目建设单位",{"key":19,"text":20,"correct":21},"C","省级交通主管部门",true,{"key":23,"text":24,"correct":14},"D","勘察设计单位","重大设计变更由交通部负责审批。较大设计变更由省级交通主管部门负责审批。项目法人负责对一般设计变更进行审查，并应当加强对公路工程设计变更实施的管理。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]