[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111151":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1111151,786,1,"单选题","根据《公路工程基本建设项目概算预算编制办法》，承包人驻地内修建临时水塔的费用属于（ ）。（2017年真题）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","临时工程费",false,{"key":16,"text":17,"correct":18},"B","临时设施费",true,{"key":20,"text":21,"correct":14},"C","施工辅助费",{"key":23,"text":24,"correct":14},"D","直接工程费","考点:施工成本的构成。临时设施费，系指临时生活及居住房屋（包括职工家属房屋及探亲房屋）、文化福利及公用房屋（如广播室、文体活动室等）和生产、办公房屋（如原材料、半成品、成品存放场及仓库、加工厂、钢筋加工场、发电站、空压机站、停机棚等），工地范围内的各种临时的工作便道（包括汽车、畜力车、人力车道）、人行便道，工地临时用水、用电的水管支线和电线支线，临时构筑物（如水井、水塔等）以及其他小型临时设施。其费用内容主要包括临时设施的搭设、维修、拆除费或摊销费。",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]