[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111142":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1111142,786,1,"单选题","根据《公路工程概预算编制办法》，工地转移费的计算基数是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","转移的人工费",false,{"key":16,"text":17,"correct":14},"B","转移的机械费",{"key":19,"text":20,"correct":21},"C","各类工程的直接工程费",true,{"key":23,"text":24,"correct":14},"D","各类工程的直接费","主要考察的是工地转移费，工地转移费以各类工程的直接工程费之和为计算基数，即：工地转移费=∑各类工程的直接工程费X工地转移费费率(％)",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]