[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1111138":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1111138,786,1,"单选题","关于技术交底的说法，错误的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","技术交底工作应分级进行、分级管理",false,{"key":16,"text":17,"correct":14},"B","项目经理部的技术交底工作由项目经理组织，项目总工程师主持实施",{"key":19,"text":20,"correct":14},"C","工长（技术负责人）负责组织向本责任区内的班组交底",{"key":22,"text":23,"correct":24},"D","项目经理部的技术交底工作由项目总工程师组织，工长主持实施",true,"项目经理部的技术交底工作由项目经理组织，项目总工程师主持实施。@##",{"id":6,"name":27,"category":28,"favorite":29},"二建公路工程实务","建筑工程",0]